SHOP DRAWING SUBMISSION

TRÌNH DUY T B N V TRI N KHAI THI CÔNG


Project: EMPIRE CITY TILIA & LINDEN RESIDENCES
NG CHUNG C TILIA VÀ LINDEN
From: Hoa Binh Construction Group
Ref. No/ : EC-HBC-FAC-MU4-SD-001
Distribute to/ :
Date: May/2 /2019-
EC SCQC MEINHARDT B+H 2 /05/2019
C/c: Expected Response Date/Ngày
EC SCQC MEINHADRT B+H Rev/ : 04
May/30/2019 30/05/2019

HBC here by submits the following documents to The Engineer / 1ung


For Review & Comments/ For Reference/ Other/Khác

Variation risk

Positive (+) Negative (-) Non/ N.A

Item description / trình Consists of /


Visual Mock Up (VMU) ShopDrawing Rev04 (Updated) MU4 & MU7
Empire City include:
1. Unitized System + Slidding Door Attachments /
Drawings /
2. Side Hung Window
Samples /
3. Spandrel Catalogue /
4. Balustrade Others / Khác
5. Alum. Composite Cladding.
6. VMU Propose Location
Consultant comments (if any) /

Client comments (if any) /

Conclusion/ :
Approve/ Approve with comments/ ý Rejected/ Resubmit/

CLIENT CONSULTANT HBC EUROWINDOW

Signature/ Ký tên: Signature/ Ký tên: Signature/ Ký tên: Signature/ Ký tên:

Full name/ : Full name/ : Full name/ : Full name/ :


Roger Cua - Meinhardt Albeto. De Guzman
Date/ Ngày: Date/ Ngày: 12-Jun-19 Date/ Ngày: Date/ Ngày: 2 /05/2019
May use normal
pan head screw
for better
engagement.

Need to have
fixing to the
mullion.
Need to fix the
spandrel frame to the
main transom.
15mm ???
Need to have
fixing to transom.
May use normal
pan head screw
for better
engagement.