TCT

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Location of

1st trial
compaction
test

Location of 2nd
trial
compaction
test (Re-test)

FGL 24.00m

FGL 29.80m

TEMPORARY ACCESS ROAD AND SITE FACILITIES LAYOUT PLAN

Sarawak Energy Berhad SIBIYU 132/33kV SUBSTATION PROJECT


Contract Ref. No.: PLS- 150129 AS SHOWN
Menara Sarawak Energy,
sarawak energy No. 1, The Isthmus,
93050 Kuching, Sarawak. A1

SIBIYU 132/33kV SUBSTATION


PESTECH SDN BHD
TM No. 26, Jalan Utarid U5 / 14, Seksyen U5,
40150 Shah Alam, Selangor D.E. Malaysia. TEMPORARY ACCESS ROAD AND
SITE FACILITIES LAYOUT PLAN

1st Floor, Lot 1233, Section 66, Merbau Road, Biawak Industrial Estate, PLS-150129-SBY-C- G-CA-0006
93450 Kuching, Sarawak. (Co. No. 1008252-A) V0.2
Tel: 082-334358 Fax: 082-333893

You might also like