Items For Confirmation: Check List
Items For Confirmation: Check List
Std. Manhour: C1 spent for Preparation: C2 spent for Checking: Re-Work hours: Submission date:
COMMENT DETAIL
C3: APPROVER:
RATING
100% 90% 80% 70%
Reference Data:
STAFF
ITEMS FOR CONFIRMATION C1 C2
Input data 1) ;
1
Measured data in input data sheet to be double checked.
Input data 2) ;
Followings data to be obtained from Hull planning team for D.No.
2 Lwl, ηT、ηG、1-t、Propeller(Dia, J -kT/kQ)、Cx, Wind k
When sister vessels, to be diverted these data.
Guaranteed speed ;
3
To be confirmed Ship's G-Speed in the specification.
Propeller speed ;
4 Deviation from target kW-rpm curve is within ±1.0rpm.
When out of range, to be confirmed the reason.
Current ;
5 Tidal current of speed trial area for THI is almost constant.
Miscellaneous
1
Comment Detail
LEGEND:
C1: DRAWER: -- OK
X -- With comment
O -- Comment rectified
P -- Pending
C2: CHECKER:
C3: APPROVER:
RATING
100% 90% 80% 70%
Reference Data:
Result of Official Sea Trial, Design Documents, General Specifications, Result of Deadweight Measurement,Attestation of International Tonnage
Measurement & makers drawing (Main Engine, Propeller, Rudder & Steering Gear)
- - - - > Nationality :
Analytic value of each examination has been compared & checked to the Sea Trial
2
Raw Data.
Result of each examination satisfies the rule requirement value, guarantee value and
3
rated value.
Tank Arrangement has been computed from actual ballasting during the Official Draft
4
Measurement.
Sea Trial Result of the sister vessel (Such As:SC )has been attached due to
5
omission of some examination
- - - > ________: Harbor Half Speed Crash Stop Astern Test, Turning Circle
Test, Stopping Inertia Test & Zig-zag Maneuvering Test.
- - - > ________: Full Speed Williamson's Turn Test
M/E Revolution, B.H.P., Shaft Stop Time & Steady Astern Rev. Time has been
6
confirmed to Result of Sea Trial (Machinery).
7 Did you attach the "PROMPT REPORT OF OFF. SEA TRIAL" which was signed?
Miscellaneous
Ship name, Ship no., Drawing name, Drawing no., List no., Plan History has been
1
finalized.
2 Attached & checked Design Input List & Feedback List
Additional, Modifications, Revisions and Etc.
Reference Vessel/Compared to:
COMMENTS DETAIL
LEGEND:
C1: DRAWER: -- OK
X -- With comment
O -- Comment
rectified
C2: CHECKER: P -- Pending
C3: APPROVER: