1 2 3 4 5=2x3 6
A MOBILISASI DE MOBILISASI
1 Profeesional Staff (Expert)
1.1 Malang - Kupang - Dilli 3 Person 1.00 Trip 3.00 450.00
1.2 Kupang - Dilli 3 Person 2.00 Trip 6.00 150.00
1.3 Paspport + Visa 6 Person 1.00 Trip 6.00 100.00
F.2.2 DOCUMENTATION
Consultant Estimate
No Description Unit Unit price
Quantity
US$
1 2 3 4 5
A Inception Report Sets 6.00 30.00
B Draft Design Report
a. Draft Design Drawing Sets 6.00 150.00
b. Draft Bill of Quantity Sets 6.00 40.00
c. Draft Engineering Estimate/Cost estimate Sets 6.00 40.00
d. Design Note's Sets 6.00 60.00
Sub total
C.1 Final Design Report
a. Site survey & Mapping Report Sets 6.00 60.00
b. Geotechnical Report Sets 6.00 60.00
c. Hidrologyst Report Sets 6.00 60.00
d. Design Drawing Sets 6.00 60.00
e. Bill of Quantity Sets 6.00 40.00
h. Environmental Management Plan Sets 6.00 40.00
i. Design Note's Sets 6.00 40.00
C.2 Bidding Document (Each Package)
a. Bid Document Sets 6.00 60.00
b. Technical Specification Sets 6.00 60.00
c. Desain Drawing Sets 6.00 150.00
d. CD back up design Sets 6.00 10.00
Sub total
D
a. Environmental Impact Assesment Analysis Sets 6.00 40.00
b. Environmental Management Plan Sets 6.00 40.00
Sub total
Sub Total
PLAN UTAMA KONSULTAN
Perencanaan & Pengawasan
n Sam Ratulangi V Nomor 11 Telp/Fax. (0380) - 832771 Kupang
Consultant Estimate
Cost
US$
7=5x6
1,350.00
900.00
600.00
-
-
1,500.00
1,000.00
5,350.00
400.00
400.00
1,000.00
400.00
1,200.00
3,400.00
7,500.00
1,800.00
100.00
9,400.00
2,250.00
11,250.00
2,250.00
750.00
2,250.00
50.00
18,800.00
500.00
7,500.00
250.00
50.00
8,300.00
4,500.00
2,000.00
15,000.00
10,000.00
150.00
5,000.00
1,000.00
50.00
200.00
37,900.00
2,000.00
750.00
2,750.00
80,550.00
Consultant Estimate
Cost
US$
6=4x5
180.00
900.00
240.00
240.00
360.00
1,740.00
360.00
360.00
360.00
360.00
240.00
240.00
240.00
360.00
360.00
900.00
60.00
3,840.00
240.00
240.00
480.00
6,240.00
PT. SIARPLAN UTAMA KONSULTAN
KonsultanJalanPerencanaan & Pengawas
Sam Ratulangi V Nomor 11 Telp/Fax. (0380) - 8585089 Kupang
Consultant Estimate
No Description Time Unit Unit price
Quantity
US$
1 2 3 4 5=2x3 6
A MOBILISASI DE MOBILISASI
1 Profeesional Staff (Expert)
1.1 Malang - Kupang - Dilli 3 Person 1.00 Trip 3.00 450.00
1.2 Kupang - Dilli 3 Person 2.00 Trip 6.00 150.00
1.3 Paspport + Visa 6 Person 1.00 Trip 6.00 100.00
F.2.2 DOCUMENTATION
Consultant Estimate
No Description Unit Unit price
Quantity
US$
1 2 3 4 5
A Inception Report Sets 6.00 30.00
B Draft Design Report
a. Draft Design Drawing Sets 6.00 150.00
b. Draft Bill of Quantity Sets 6.00 40.00
c. Draft Engineering Estimate/Cost estimate Sets 6.00 40.00
d. Design Note's Sets 6.00 60.00
Sub total
C.1 Final Design Report
a. Site survey & Mapping Report Sets 6.00 60.00
b. Geotechnical Report Sets 6.00 60.00
c. Hidrologyst Report Sets 6.00 60.00
d. Design Drawing Sets 6.00 60.00
e. Bill of Quantity Sets 6.00 40.00
h. Environmental Management Plan Sets 6.00 40.00
i. Design Note's Sets 6.00 40.00
C.2 Bidding Document (Each Package)
a. Bid Document Sets 6.00 60.00
b. Technical Specification Sets 6.00 60.00
c. Desain Drawing Sets 6.00 150.00
d. CD back up design Sets 6.00 10.00
Sub total
D
a. Environmental Impact Assesment Analysis Sets 6.00 40.00
b. Environmental Management Plan Sets 6.00 40.00
Sub total
Sub Total
RPLAN UTAMA KONSULTAN
Perencanaan & Pengawasan
an Sam Ratulangi V Nomor 11 Telp/Fax. (0380) - 8585089 Kupang
Consultant Estimate
Cost
US$
7=5x6
1,350.00
900.00
600.00
-
-
1,500.00
1,000.00
5,350.00
400.00
400.00
1,000.00
400.00
1,200.00
3,400.00
7,500.00
1,800.00
100.00
9,400.00
2,250.00
11,250.00
2,250.00
750.00
2,250.00
50.00
18,800.00
500.00
7,500.00
250.00
50.00
8,300.00
4,500.00
2,000.00
15,000.00
10,000.00
150.00
5,000.00
1,000.00
50.00
200.00
37,900.00
2,000.00
750.00
2,750.00
80,550.00
Consultant Estimate
Cost
US$
6=4x5
180.00
900.00
240.00
240.00
360.00
1,740.00
360.00
360.00
360.00
360.00
240.00
240.00
240.00
360.00
360.00
900.00
60.00
3,840.00
240.00
240.00
480.00
6,240.00
PT. SIARPLAN UTAMA KONSULTAN
Konsultan Jalan
Perencanaan & Pengawas
Sam Ratulangi V Nomor 11 Telp/Fax. (0380) - 832771 Kupang
F.2.2. DOCUMENTATION
AMOUNT (US$)
180.00
480.00
Err:509
1,740.00
3,840.00
Err:509
F.3.1. REMUNERATION
Project Name : Detailed Engineering Design and Bid Document Preparation For Road
Project Owner : Ministry of Infrastructure Procurement Services
Directorate of Administration and Finance
NO DESCRIPTION
I REMUNERATION COST
II REMBURSABLE COST
Offices Overhead Cost
Site Investigation
Documentation
TOTAL ( I + II )
TAX (4%)
TOTAL
GRAND TOTAL
TOTAL COST
(US$)
$ 79,074.00
$ 3,400.00
$ 80,550.00
$ 6,240.00
$ 169,264.00
$ 6,770.56
$ 176,034.56
$ 176,000.00
LOAN NO./TITLE:
1 2 3 4 5 6 7 8 9 10
Basic
Social
EXPERT Monthly Overhead Sub-Total Fee Home Office Others5/ Field Rate Multiplier
Charges Support
Salery Rate Month /Month
Documents
(4+5)
Position Amount Amount Amount Amount Amount
Firm1/ Citizenship Date of Birth Type2/ Category3/ Currency 4/
Full-Name 30% of 1 10% of 1 (1+2+3) 15% of 4 30% of 1 (6+7) (8/1)
Team Leader
1 Indonesia 1/9/1963 I FT $ 1,500.00 $ 450.00 $ 150.00 $ 2,100.00 $ 315.00 $ 2,415.00 $ 450.00 $ 2,865.00 1.91
Geotech/Soil Engineer
1 Indonesia 15/01/1954 I FT $ 1,250.00 $ 375.00 $ 125.00 $ 1,750.00 $ 262.50 $ 2,012.50 $ 375.00 $ 2,387.50 1.91
1 Indonesia 17/04/1971 I FT $ 1,250.00 $ 375.00 $ 125.00 $ 1,750.00 $ 262.50 $ 2,012.50 $ 375.00 $ 2,387.50 1.91
Enironmental Specialist
1 Indonesia 5/7/1976 I FT $ 1,250.00 $ 375.00 $ 125.00 $ 1,750.00 $ 262.50 $ 2,012.50 $ 375.00 $ 2,387.50 1.91
Quantity/Cost Engineer
1 Indonesia 18/10/1968 I FT $ 1,250.00 $ 375.00 $ 125.00 $ 1,750.00 $ 262.50 $ 2,012.50 $ 375.00 $ 2,387.50 1.91
1 Indonesia 18/08/1960 I FT $ 1,250.00 $ 375.00 $ 125.00 $ 1,750.00 $ 262.50 $ 2,012.50 $ 375.00 $ 2,387.50 1.91
Surveyor Engineer
1 Indonesia 25/03/1974 I FT $ 1,000.00 $ 300.00 $ 100.00 $ 1,400.00 $ 210.00 $ 1,610.00 $ 300.00 $ 1,910.00 1.91
1 Indonesia 23/01/1967 I FT $ 1,000.00 $ 300.00 $ 100.00 $ 1,400.00 $ 210.00 $ 1,610.00 $ 300.00 $ 1,910.00 1.91
2 Indonesia 11/5/1971 I FT $ 750.00 $ 225.00 $ 75.00 $ 1,050.00 $ 157.50 $ 1,207.50 $ 225.00 $ 1,432.50 1.91
CAD Operator
2 Indonesia 3/11/1966 I FT $ 750.00 $ 225.00 $ 75.00 $ 1,050.00 $ 157.50 $ 1,207.50 $ 225.00 $ 1,432.50 1.91
Offices/Adm
2 Indonesia 17/05/1964 N 0S $ 450.00 $ 135.00 $ 45.00 $ 630.00 $ 94.50 $ 724.50 $ 135.00 $ 859.50 1.91
1/
Initials of lead firm associated (pls indicate in the box, the firm represented by initials):
2/
I=International, N=National
INITIALS FIRM NAME
CERTIFIED AS CORRECT :
3/
FT - Full time with lead firm or associate firm
1
OS - Other source (other than lead firm or associate firm) Name :
5/
If applicable, pls.provide explanations. Date :
1
Requeired to be completed for CQS, QBS and SSS methods
FORM T3. CONSULTANTS FIRM'S EXPERIENCE
Name of associated Consultans, if any: Name of senior professional staff of your firm involved and functions
performed :
1. David Pelata, ST
2. Elizinu Ferreira, ST
3. Martinho de Deus
Narrative description of project
The project's objective according to the scope of works is providing the architectural, structural and Plumbing and
electrical design for the former NEW CONSTRUCTION LABORATORY METROLOGY & STANDARDIZE BUILDING
(BPSMB) in Caicoli - Dili. This design including bill of quantity, cost estimation and technical specification preparation
Name of associated Consultans, if any: Name of senior professional staff of your firm involved and functions
performed :
1. David Pelata, ST
2. Elizinu Ferreira, ST
3. Martinho de Deus
Narrative description of project
The project's objective according to the scope of works is providing the architectural,
for the former REHABILITATION PARK & GARDEN PLACED in Fomento - Dili.
This design including bill of quantity, cost estimation and technical specification preparation
USD 701,362.81
NEW CONSTRUCTION OF HOSTEL BUILDING
ERMERA
Country : Total staff-months your firm :
Timor Leste
Location within country :
24 man-months
GLENO - ERMERA
Name of Client Approx. USD value of services
from your firm :
FUNDAÇÃO O BOM SAMARITANO
USD 49,095.4
Name of associated Consultans, if any: Name of senior professional staff of your firm involved and functions
performed :
1. David Pelata, ST
2. Elizinu Ferreira, ST
3. Martinho de Deus
Narrative description of project
The project's objective according to the scope of works is providing the architectural, structural and Plumbing and
electrical design for the former NEW CONSTRUCTION OF HOSTEL BUILDING ERMERA including NEW CONSTRUCTION OF
OFFICE BUILDING, NEW CONSTRUCTION OF CLINIC BUILDING, NEW CONSTRUCTION OF LIBRARY, STUDY BUILDING
REHABILITATION OF FENCE in Gleno - Ermera.
Name of associated Consultans, if any: Name of senior professional staff of your firm involved and functions
performed :
1. David Pelata, ST
2. Elizinu Ferreira, ST
3. Martinho de Deus
Narrative description of project
The project's objective according to the scope of works is providing the architectural, structural and Plumbing and
electrical design for the former NEW CONSTRUCTION TYPE 36 BUILDING (100 Unit) at BAUCAU, DILI, LOSPALOS, ILIOMAR,
VIQUEQUE, AINARO, LIQUICA, ERMERA MANATUTO, AILEU, SAME DISTRICT. This design including bill of quantity,
cost estimation and technical specification preparation
Assignment duration
(months)
1 Months
Total staff-months
your associate firm :
September 2006
Project Manager/Structural
CAD Designer
Site Engineer
Assignment duration
(months)
1 Months
Total staff-months
your associate firm :
September 2006
Project Manager/Structural
CAD Designer
Site Engineer
PERIENCE
Assignment duration
(months)
3 Months
Total staff-months
your associate firm :
Oktober 2004
Project Manager/Structural
CAD Designer
Site Engineer
tural, structural and Plumbing and
G ERMERA including NEW CONSTRUCTION OF
ONSTRUCTION OF LIBRARY, STUDY BUILDING
PERIENCE
Assignment duration
(months)
1 Months
Total staff-months
your associate firm :
Januari 2007
Project Manager/Structural
CAD Designer
Site Engineer
FORM T.5.3.
1 PREPARATION WORK
1 Desk Study 1 1 1 3.000
2 Inception Report 1 1 1 3.000
3 Collection Primary data 1 1 1 3.000
4 Review Secondary data 1 1 1 3.000
5 Mobilization 1 1 1 1 4.000
6 Reconnaisance 1 1 1 1 4.000
7 Preliminary Survey Report 1 1 1 1 4.000
2 SITE INVESTIGATION
1 Inventory data existing condition
2 Topografi survey 1 1 1 1 1 1 1 1 1 1 1 1 1 1 14.000
3 Long-cross survey each 20 meters 1 1 1 1 1 1 1 1 1 1 1 1 1 1 14.000
4 Horisontal & vertical alignment survey 1 1 1 1 1 1 1 1 1 1 1 1 1 1 14.000
5 Borrow area material 1 1 1 1 1 1 1 1 1 1 1 1 1 1 14.000
6 Benklemean Beam Test 1 1 1 1 1 1 1 1 1 1 1 1 1 1 14.000
7 Traffic Survey 1 1 1 1 1 1 1 1 1 1 1 1 1 1 14.000
3 Environmental Survey
1 Identification site problem 1 1 1 1 1 1 1 1 1 1 1 11.000
2 Collect. Data existing 1 1 1 1 1 1 1 1 1 1 1 11.000
4 Hidrological Survey 1 1 1 1 1 1 1 1 1 1 1 11.000
1 Area rainfal 1 1 1 1 1 1 1 1 1 1 1 11.000
2 Site Hidrogeologi 1 1 1 1 1 1 1 1 1 1 1 11.000
3 Catchment area 1 1 1 1 1 1 1 1 1 1 1 11.000
5 Geotech/Soil Survey
5.1. Field data Collection
1 Boring & Soil sampling data 1 1 1 1 1 1 1 1 1 1 1 11.000
2 Duct Cone Penetrometer 1 1 1 1 1 1 1 1 1 1 1 11.000
3 Pavement material sampling 1 1 1 1 1 1 1 1 1 1 1 11.000
5.2. Laboratory Testing 0.000
1 Soil data properties 1 1 1 1 1 1 1 1 1 1 1 1 1 13.000
2 Shear strengt of soil 1 1 1 1 1 1 1 1 1 1 1 1 1 13.000
3 Compaction Test 1 1 1 1 1 1 1 1 1 1 1 1 1 13.000
5 CBR Test 1 1 1 1 1 1 1 1 1 1 1 1 1 13.000
6 Abration test 1 1 1 1 1 1 1 1 1 1 1 1 12.000
7 Gradation Test 1 1 1 1 1 1 1 1 1 1 1 1 12.000
6 Analysis Data Engineering Design
1 Field data 1 1 1 1 1 1 1 1 1 1 1 1 12.000
2 Geotech/soil data 1 1 1 1 1 1 1 1 1 1 1 1 12.000
3 Hidrological & Drainage site 1 1 1 1 1 1 1 1 1 1 1 1 12.000
4 Traffic data 1 1 1 1 1 1 1 1 1 1 1 1 12.000
5 Topografical and site mapping 1 1 1 1 1 1 1 1 1 1 1 1 12.000
6 Environment Impact Assesment & EMP 1 1 1 1 1 1 1 1 1 1 1 1 12.000
7 Design Engineering
Geometric design 1 1 1 1 1 1 1 1 1 1 1 1 12.000
Pavement layer design 1 1 1 1 1 1 1 1 1 1 1 1 12.000
Drainage 1 1 1 1 1 1 1 1 1 1 1 1 12.000
Slope protection 1 1 1 1 1 1 1 1 1 1 1 1 12.000
Embankment material 1 1 1 1 1 1 1 1 1 1 1 1 12.000
8 Detail Drawing
Long cross 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16.000
Vertical & Horisontal Alignment 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16.000
Typikal Cross section 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16.000
Street map 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16.000
Drainage structur 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16.000
Slope protection structuk 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16.000
9 Bill of Quantity & Cost Estimate 1 1 1 1 1 1 1 1 1 1 1 1 12.000
10 Technical Specification 1 1 1 1 1 1 1 1 1 1 1 1 12.000
Tender Preparation Document 1 1 1 1 1 1 1 1 1 1 1 1 12.000
11 Design Drawing 1 1 1 1 1 1 1 1 1 1 1 1 12.000
7 Draft Final Report 1 1 1 1 1 1 1 1 1 1 1 1 12.000
8 Final Report 1 1 1 1 1 5.000
576.000
CONSULTANT'S STAFFING SCHEDULE
44.000
CONSULTAN'S TEAM COMPOSITION & STAFFING
DED JALAN
PROFFESIONAL STAFF
NAME STAFF FIRM AREA OF EXPERTISE
1 Ir. Egidius Kalogo, MT PT. SIARPLAN UTAMA Highway Engineer
2 Dr. Paulus Pramono Rahardjo PT. SIARPLAN UTAMA Geolog/Geotech Engineer
3 Ir. Paul Sianto, MT PT. SIARPLAN UTAMA Geotech/Laboratory
4 Ir. Henry David Sachariaz PT. SIARPLAN UTAMA Highway Engineer
5 Ir. Ricky Octoviato Penlaana PT. SIARPLAN UTAMA Civil Engineer
6 Ir. Stefanus Tani Temu PT. SIARPLAN UTAMA Environmental
TECHNICAL/SUPPORTING STAFF
1 Dominikus Mene Bano, ST PT. SIARPLAN UTAMA Civil Engineer
2 Vinsensius Lalo, ST PT. SIARPLAN UTAMA Civil Engineer
3 Ferdiandus Wolodiri, ST PT. SIARPLAN UTAMA Civil Engineer
4 Melkianus Lie, ST PT. SIARPLAN UTAMA Civil Engineer
5 Timotius Tapatab, BE PT. SIARPLAN UTAMA Civil Engineer
6 Ir. Frederikus Wahyu Kristanto PT. SIARPLAN UTAMA Civil Engineer
7 Ir. John GF. Seran PT. SIARPLAN UTAMA Civil Engineer
8 Marcelinus A. Tance, ST PT. SIARPLAN UTAMA Civil Engineer
9 Ir. Bambang Suharyanto PT. SIARPLAN UTAMA Civil Engineer
10 Yedid Saudale, ST PT. SIARPLAN UTAMA Civil Engineer
11 Aloysius Terto Djen, ST PT. SIARPLAN UTAMA Civil Engineer
12 Ir. Ernawan Setyono PT. SIARPLAN UTAMA Civil Engineer
13 Hengky Bean Betan, ST PT. SIARPLAN UTAMA Civil Engineer
14 Johanes K. Raka, ST PT. SIARPLAN UTAMA Civil Engineer
15 Laurensius L. Liru PT. SIARPLAN UTAMA Management
16 Yessy W. Therik PT. SIARPLAN UTAMA Management
FORM T.5.1
A Peralatan Kantor
1 Alat tulis kantor - - 1 LS
2 Kertas HVS - - 1 Ls
3 Kertas kalkir - - 1 Ls
4 Tinta printer (warna dan hitam) Warna/Hitam/ Epson Milik Baik 1 Ls
5 Komputer Intel pentium D Milik Baik 8 Unit
6 Printer Epson Stylus/A4/A3 Milik Baik 8 Unit
7 Ploter HP Ink Jet/Ao Milik Baik 2 Unit
8 Scanner Canon Milik Baik 2 Unit
9 Meja dan kursi kerja Olympic Milik Baik 4 Set
10 Filling cabinet Olympic Milik Baik 4 Set
B Peralatan lapangan
1 Teodolit buah Nikon/Digital Milik Baik 8 Set
2 Waterpass bh DGPS/ Milik Baik 8 Set
3 Kompas geologi bh Milik Baik 4 Set
4 Palu geologi bh Milik Baik 4 Set
5 Kamera bh Nikon Milik Baik 8 Set
7 Pita ukur bh Milik Baik 8 Set
10 DCP Test MBT/10 m' Milik Baik 2 Set
12 Benklemean Beam Test MBT Milik Baik 2 Set
13 Tabung sample Split barel Milik Baik 10 Set
15 Core box Kayu Milik Baik 4 Set
C Kendaraan Operasional
1 Kendaraan Roda Empat Toyota 2400 CC Milik Baik 2 Unit
Bulan Pemakaian
No Nama Alat I II III IV V VI Ket.
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
A Peralatan Kantor
1 Alat tulis kantor
2 Kertas HVS
3 Kertas kalkir
4 Tinta printer (warna dan hitam)
5 Komputer
6 Printer
7 Ploter
8 Scanner
9 Meja dan kursi kerja
10 Filling cabinet
B Peralatan lapangan
1 Teodolit buah
2 Waterpass bh
3 Kompas geologi bh
4 Palu geologi bh
5 Kamera bh
7 Pita ukur bh
10 DCP Test
12 Benklemean Beam Test
13 Tabung sample
15 Core box
C Kendaraan Operasional
1 Kendaraan Roda Empat