Professional Documents
Culture Documents
10083a 2X M6 Ab 00001 00
10083a 2X M6 Ab 00001 00
NOTES:
1. FOR SYMBOLS AND LEGENDS SEE DWG 9X-M6-G00-00001,9X-M6-G00-00002,
2A-AA-MB001 9X-M6-G00-00003, 9X-M6-G00-00004 AND 9X-M6-G00-00005
HRSG 2A 2B-AA-MB001 2C-AA-MB001 2D-AA-MB001 2. ALL COMPONENTS (EQUIPMENT, VALVES, INSTRUMENTS, ETC) INCLUDE
HRSG 2B HRSG 2D THE JOB NUMBER SHOWN IN THE TITLE BLOCK AS PART OF THE
M HP SUPER HEATER HRSG 2C COMPLETE COMPONENT NUMBER IDENTIFIED ON PROJECT LISTS. M
SEE VENDOR DWG. HP SUPER HEATER HP SUPER HEATER HP SUPER HEATER 3. ALL INLINE EQUIPMENT, VALVES, INSTRUMENTATION, ETC. INCLUDE THE
GE
[2015T0017-HPI-A105] SEE VENDOR DWG. SEE VENDOR DWG. SEE VENDOR DWG. SUBDIVISION AND SYSTEM OF THE LINE OR EQUIPMENT IN WHICH THEY ARE
GE
GE
TP
GE
2A-AB
[2015T0017-HPI-A105] [2015T0017-HPI-A105] [2015T0017-HPI-A105] LOCATED OR ATTACHED TO AS PART OF THE COMPLETE COMPONENT
TP TP TP NUMBER IDENTIFIED ON PROJECT LISTS.
NOTE 16
300 mmx250 mm 001 2B-AB 2C-AB 2D-AB
OC
300 mmx250 mm 4. INDICATES PIPING COMPONENT FURNISHED BY THE SUPPLIER
300 mmx250 mm 001 001
NOTE 16
NOTE 16
001
NOTE 16
300 mmx250 mm WHO IS RESPONSIBLE TO FURNISH THE MAIN ASSOCIATED
OC
OC
OC
EQUIPMENT SERVED BY THIS COMPONENT
E
SLOP
PI 5. BRANCH CONNECTION SHALL BE BUTT WELDING LATROLET OR SOCKET WELDING
E
- LATROLET WITH FITTING MATERIAL SHALL BE A182F91.
E
SLOP
SLOP
SLOP
PIT 2A-AB-L614-9LD-20 mm 6. ALL INSTRUMENTS & VALVES WITHOUT TAG NUMBERS ARE PROVIDED BY GE.
L DCS 001 A V614A V614B REFER TO GE P&IDS FOR COMPLETE TAG NUMBERS. L
PIT 2B-AB-L614-9LD-20 mm PIT 2D-AB-L614-9LD-20 mm 7. NRV SHALL BE LOCATED ON THE MAIN STEAM PIPE RACK AT A DISTANCE OF
PIT 2A-AB-L611-9LD-20 mm 2C-AB-L614-9LD-20 mm
001 A V614A V614B PIT 001 A V614A V614B 2 METERS BEFORE THE MAIN STEAM HEADER.
001 B V611A V611B PIT 2D-AB-L611-9LD-20 mm
FI PI 001 A V614A V614B 8. CONNECTION FOR CHEMICAL CLEANING
2A-AB-L618-9LD-20 mm 2B-AB-L611-9LD-20 mm PI
- PI PIT 001 B V611A
- - V611B 9. THESE VALVES SHALL BE LOCATED NEAR THE STEAM HEADER.
V618A V618B (V) 001 B PIT 2C-AB-L611-9LD-20 mm
- V611A V611B 2D-AB-L618-9LD-20 mm
2A-AB-L401-9LD-20 mm
V617A 2A-AB-L617-9LD-20 mm 2B-AB-L618-9LD-20 mm DCS 001 B V611A V611B DCS V618A V618B 10. DRAIN LINE SHALL BE LOCATED AT THE NEAREST LOW POINT TO
(V)
V401A
DCS FE 2D-AB-L617-9LD-20 mm (V)
V617B V618A V618B 2C-AB-L618-9LD-20 mm TURBINE INLET JUST BEFORE THE TURBINE STOP VALVE.
2B-AB-L401-9LD-20 mm
FE +
2D-AB-L401-9LD-20 mm
FIT 2B-AB-L617-9LD-20 mm 001 FE V617A V617B 11. DRAIN PIPE SHALL BE LOCATED AT EACH LOW POINT IN THE STEAM PIPING
V401B V401A
+
FE
V401B V401A
001 FI V618A V618B +
FI FIT FIT
001 B 001
+ 12. TEMP. ELEMENT AND DRAIN LINE / DRAIN POT SHALL BE LOCATED
FIT 2A-AB-L615-9LD-20 mm FI V617A V617B 2C-AB-L617-9LD-20 mm 001
V401B
FIT FIT - - 001 A 001 B AT THE NEAREST POINT TO ISOLATION VALVE.
K 001 A - V617A V617B 2D-AB-L615-9LD-20 mm 13. BYPASS VALVE SUPPLIED BY GE. K
V615A V615B 001 A 001 B 2B-AB-L615-9LD-20 mm FIT FIT
2A-AB-L612-9LD-20 mm (V) 14. VALVE AND IT'S INTEGRAL BYPASS VALVE ARE SUPPLIED BY GE
2C-AB-L401-9LD-20 mm
001 A 001 B 2C-AB-L615-9LD-20 mm V615A V615B 15. THE BYPASS VALVE IS LOCATED AT A DISTANCE OF 4 ~ 5 METERS FROM THE
V612AV612B 2D-AB-L612-9LD-20 mm
V615A V615B
V401B V401A
2B-AB-L612-9LD-20 mm STEAM DUCT.
TE TT V612A V612B
V615A V615B TE TT 16. TRANSITION PIECE SHALL BE PROVIDED BETWEEN P22 & P91 PIPING.
V612A V612B
2A-AB-L006-9LD-40 mm 052 052 TE TT 052 052 17. THESE DRAINS SHALL BE CONNECTED TO RELEVANT HRSG BLOWDOWN TANK,
LO HRSG SUPPLIER SHALL CONSIDER THESE DRAINS WHILE DESIGNING
051 051 2C-AB-L612-9LD-20 mm AS
2D-AB-L006-9LD-40 mm BLOWDOWN TANK
V612A V612B V001
SLOP
TI TI TT 2B-AB-L047-9LD-40 mm 18. REMOVABLE SPOOL SHALL BE REMOVED DURING STEAM BLOW.
SILENCER
NOTE 9
E
051 19. TRANSITION PIECE IS REQUIRED FOR MATCHING VALVE CONNECTION AS PER
GE DOCUMENT 119T3292 & 105T8973.
V095
NOTE 9
NOTE 9
LO
20. THESE VALVES SHALL BE LOCATED CLOSE TO THE CONDENSATE TANK.
S
DCS DCS TE
J HY TP 21. HP CHEMICAL CLEANING CONNECTION SHALL BE CAPED. J
AS
051 +
2D-AB-L051-9LD-300 mm
TI
FC
051 2B-AB 22. THE PIPING DOWNSTREAM VALVE IS P11 WITH PIPE THICKNES 15.88 mm,
SLOP
021 HY SO TRANSITION PIECE MAY BE REQUIRED TO MATCH VALVE NOZZLE.
E
HS HS +
052 SILENCER 23. THE SPRAY LINE MATERIAL IS P22 WITH PIPE THICKNESS 6.02 mm, SO
SILENCER
TP
2B-AB-L051-9LD-300 mm
2B-AB-L027-C1D-25 mm
HV
TRANSITION PIECE MAY BE REQUIRED TO MATCH THE HP BYPASS NOZZLE.
GE
GE
DCS 2D-AB
GE
V002 NOTE 9
+
S
TP 052
SILENCER
HV ZSO 021 TP 24. THE VELOCITY INSIDE THE VENT MAY REACH 250 M/S DURING TURBINE TRIP.
ZI ZI + 2B-AB
2C-AB-L051-9LD-300 mm
051 002
TP 052 2D-AB 25. HP DRAIN MANIFOLDS SHALL BE CONNECTED WITH TANK BY THERMAL SLEEVES.
OC
TI 2C-AB HS 002 26. THE PIPING DOWNSTREAM LP BYPASS VALVE IS P11 WITH THICKNESS 9.53 mm,
GE
LO
OC
NOTE 9
2D-AB-L027-C1D-25 mm
FC
TP
OC
021 SO TRANSITION PIECE MAY BE REQUIRED TO MATCH LP BYPASS OUTLET.
OC
2A-AB ZSC
2B-AB-L038-43D-300 mm
TP
2A-AB-L047-9LD-40 mm 27. THE STRAINER SHALL BE LOCATED IN A STRAIGHT RUN WITH AT LEAST 5 M
2D-AB-L038-43D-300 mm
GE
021 2D-AB
2C-AB-L027-C1D-25 mm
OC
DCS ZI 052 UPSTREAM THE STRAINER AND 5 M DOWNSTREAM.
TO BLOWDOWN 026
GE
NOTE 9
28. THE STOP VALVE SHALL BE LOCATED IN A STRAIGHT RUN WITH AT LEAST 1.8 M
2A-AB-L027-C1D-25 mm
TP
V095
LO
H HY TANK H
GE
HY ZSO TO GRAVELS UPSTREAM THE VALVE AND 3 M DOWNSTREAM.
GE
GE
+ 2C-AB
NOTE 17 TE TT
OC
052 +
TP HS 051 002 29. THE CONTROL VALVE SHALL BE LOCATED IN A STRAIGHT RUN WITH AT LEAST
NOTE 9
051 NOTE 42
AS
AS
NOTE 9
1.8 M UPSTREAM THE STRAINER AND 5 M DOWNSTREAM.
OC
2A-AB 051 051
LO
V094
2C-AB-L038-43D-300 mm
V001
LO
300 mmx200 mm
AS LO
002 TI
SLOP
TO GRAVELS
2A-AB-L038-43D-300 mm
OC
OC
+
DISCONNECTION
E
ZI 2D-AB-L047-9LD-40 mm
S
051
S
051 V095 31. DRAINS SHALL BE OPENED TO DRAIN ANY ACCUMELATED WATER AFTER
S
TP FOR STEAMBLOW
2B-AB TO GRAVELS DCS FC NOTE 9 SKY VALVE OPERATION AND BEFORE STARTUP.
2A-AB-L051-9LD-300 mm
NOTE 9
reproduced, copied, loaned, exhibited, or used except in the limited way and private use permitted by any written consent given by the lender to the borrower.
FC
+
HV TO BLOWDOWN TO HP BYPASS VALVE (C) NOTE 37 HY 32. MINIMUM ELEVATION BETWEEN THE SPRAY NOZZLE AND THE HIGHEST DRAIN
E
TO GRAVELS 027
This drawing and the design it covers are the property of PGESCo. They are merely loaned and on the borrower's express agreement that they will not be
OC
TP
43D
+ +
TANK CONNECTION SHALL BE 0.9 M.
GE
33. MINIMUM ELEVATION BETWEEN THE SPRAY NOZZLE AND THE HIGHEST DRAIN
SLOP
300 mmx200 mm
ZSO NOTE 17 003 HS HV
NOTE 42 +
CONNECTION SHALL BE 0.6 M.
V094 NOTE 9
300 mmx200 mm
(E-8)
E
FC ZSO 051
NOTE 9
051
9LD
TO HP BYPASS VALVE (B) 34. THE FLOW ELEMENT SHALL BE LOCATED IN A STRAIGHT RUN WITH AT LEAST
GE
G TP NOTE 35 2B-AB-L003-9LD-250 mm NOTE 35 051 PV G
2X-M6-AB-00004 5280 TP 2C-AB-L003-9LD-250 mm +
1220 MM UPSTREAM THE FLOW ELEMENT AND 610 MM DOWNSTREAM.
LO
2A-AB ZI 35. THE PIPING DOWNSTREAM THE SKY VALVE IS P11 WHILE THE VALVE OUTLET IS
ZSC
LO
ZSO PV 2B-AB TP PV TP
003 ZT P91, SO TRANSITION PIECE WILL BE REQUIRED FOR MATCHING.
(E-5)
LO NOTE 9
+
43D
+
2C-AB ZSC 2D-AB
OC
OC
051 004 CHEMICAL
43D
052 36. THE VALVE SHALL BE REMOVED DURING STEAM BLOW.
OC
NOTE 21
9LD 43D
OC
ZT 003 003
GE OC
150 mm 051 TP 37. THE HRSG WILL BE DECOUPLED AT THIS SECTION TO CONNECT
ZT
OC
2D-AB
THE STEAMBLOW PIPING.
V002
027
9LD
GE
GE
38. THIS CONNECTION WILL BE FROM THE SIDE OR FROM THE TOP OF THE HEADER
GE
TP PIC ZI NOTE 21 TO BLOWDOWN
NOTE 8
V500B
2A-AB
CHEMICAL V500A TANK 39. PIPE SPOOL P22 MATERIAL TO MATCH THE VALVES SUPPLIED BY GE.
NOTE 17 TP TP CHEMICAL DISCONNECTION
OC
TP
OC
027 PIC ZI
NOTE 42 2A-AB 150 mm PIC ZI 2C-AB 150 mm NOTE 17 FOR STEAMBLOW 40. DIFFERENTIAL PORT FLANGE ARE 1" ( 25.4 mm ) 300# FLANGES, THESE
2D-AB CHEMICAL
OC
NOTE 42
GE
TP 004 2A-AB-L500-9LD-25 mm (D) HS 004 FLANGES ARE CONNECTED WITH THE PIPES BY USING REDUCING
2C-AB-L500-9LD-25 mm 004 ZT
OC
NOTE 37
M
NOTE 8
NOTE 8
V500B
2A-AB
V500B
HV INSERTS TO MATCH THE PIPE SIZE OF DN20.
026 2A-AB-L003-9LD-250 mm NOTE 31 V500A +
NOTE 31 V500A HS
F TO BLOWDOWN 063 2X-M6-AB-00004 5282 2D-AB-L500-9LD-25 mm 41. SHORT P91 SPOOL (25mm) IS REQUIRED FOR HP AFTER SEAT CONNECTION WITH GE, F
HS PIC ZI
TANK TO HP BYPASS VALVE (A) ZSO DCS
GE
(D) THIS SPOOL SHALL BE SOCKET WELDED WITH GE CONNECTION WHILE THE OTHER
NOTE 8
(D) NOTE 31 V500A
V500B
NOTE 17 (E-11)
2B-AB-L042-9LD-200 mm
M
063
M
5283 NOTE 12 SIDE OF THIS SPOOL SHALL BE BUTTWELDED WITH P22 PIPE (25mm). P22 PIPE (25mm)
NOTE 42 2X-M6-AB-00004 HV TT TE HV DCS 2D-AB-L003-9LD-250 mm
+
ZSO DCS +
HS SHALL BE CONNECTED WITH THE DRAIN VALVE WITH REDUCING
(E-1) 063 053 053 ZSC 063 ZSO (D) INSERT (40 mm X 25 mm).
063 HV
M
063 063 +
ZSO 42. CONNECTION MATERIAL IS SA182-F11.
TT TE NOTE 12 2A-AB-L042-9LD-200 mm TE NOTE 12 2C-AB-L042-9LD-200 mm 063
ZSC 063 DCS
053 053 2B-AB-L001-9LD-40 mm 053 ZSC ZSC
2A-AB-L001-9LD-40 mm 2C-AB-L001-9LD-40 mm
2A-AB-L002-9LD-50 mm 063 063
NOTE 12 NOTE 12 2B-AB-L002-9LD-50 mm 2C-AB-L002-9LD-50 mm 063
TT NOTE 12 2D-AB-L042-9LD-200 mm
TT TE NOTE 12
NOTE 9
NOTE 9
SLOP
V052
LO
SLOP
LO
V052
053 053 2D-AB-L001-9LD-40 mm NOTE 12
NOTE 9
E
E
SLOP
E ZI E
V052
OC
LO
2D-AB-L002-9LD-50 mm
OC
HS ZI HS ZI
OC
E
HY
SLOP
5279
NOTE 9
TP 2X-M6-AB-00004
OC
SLOP
AS
HS ZI HY
V052
TP
LO
SLOP TP
NOTE 16
NOTE 16
+
DCS HY
6
3
2B-AB
AS
+
DCS
E
AS
NOTE 16
2D-AB
E
2C-AB
NOTE 16
053 053 DCS (E-14)
SLOP
TP HS
+
HS ZI
005 HV 005 053 005
5 5 5 5 5 5 5 5 6 6
2 3 4 5 6 7 8 9 0 1
DCS DCS
GE
2A-AB
SLOP
E
+
AS
GE
005 DCS 053 HV
HV
E
HS ZI
GE
HY HV HS ZI +
HS ZI
GE
DCS
+
053 DCS
053
S
+ +
S
HV
M
M
053
M
053 HV
NOTE 9
M
S
HV
NOTE 9
+
HV +
+
NOTE 9
+
FC
NOTE 14
ZSO ZSO ZSO PGESCo. CONFIDENTIAL
FC
FC
S
NOTE 7 NOTE 14
GE
NOTE 7 NOTE 14
GE
ZSO
NOTE 14
TP © PGESCo. 2016-2017. Contains confidential and/or proprietary information to PGESCo. Which shall not be used, disclosed or
NOTE 9
GE
GE
3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0
ZSO TP reproduced in any format by any non-PGESCo party without PGESCo.'s prior written permission. All rights reserved
FC
D D
M
2D-AB
M
M
TP TP
053 ZSO 006
006
M
NOTE 7
053 053
OC
ZSO 006 ZSO 006
OC
OC
ZSO
LO
LO
LO
NOTE 9
V062
V062
NOTE 9
(H-1) NOTE 9
OC
V062
ZSC
HV DCS ZSC DCS DCS ZSC
LO
053 HV HV
NOTE 9
+
V062
ZSC + +
ZSC
HV
2X-M6-AB-00004
TO CONDENSATE
053
HP BYPASS VALVE WARMUP
RECEIVER TANK
053
(G-12)
TO CONDENSATE
RECEIVER TANK
HP BYPASS VALVE WARMUP
DCS ZSC
5285
ZSC +
ZSC
5284
TO CONDENSATE
RECEIVER TANK
ZI ZI
(K-12)
053 ZI
RECEIVER TANK
TO CONDENSATE
(K-4)
5286
2X-M6-AB-00004
2X-M6-AB-00004
5278
ZI
2X-M6-AB-00006
2X-M6-AB-00006
2A 2B 2C
C HS HS HS 2D TT C
2X-M6-AB-00006
2X-M6-AB-00006
LINE (2C)
0 03/05/17
HS 054
5275
(F-11)
C.S P.D PROJ
2 2 2 2 2 2 2 2
2 3 4 5 6 7 8 9
MECH
NO. DATE REVISIONS BY CHK APPR
SUPV SUPV SUPV ENGR
TI TI TI TE
LINE (2B)
LINE (2A)
2X
2X 054
5287
2X
5276
TI 2X
(F-5)
(F-8)
Y
EGYP
E RG
SLOP MINISTRY OF ELECTRICITY AND ENERGY
O F E LE CT R I C I TY & EN
I AN E LE
150 mm 2X-AB-L007-9LD-500 mm E
CTR I C I TY HO LD I NG C
5288 2X-M6-AB-00003 EGYPTIAN ELECTRICITY HOLDING COMPANY (EEHC)
I ST R Y
OMP A
MI N
Y N
2X-AB-L510-9LD-25 mm
INSPECTION
150 mm
1 1 1 1 1 1 1 1 1 1 2
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0
(J-1)
PORT
SLOP
V510B V510A
E
TI ZI HS
B INSPECTION PORT B
AT THE END OF THE ZSC CONS TRUCT ION
2X-AB-L001-9LD-40 mm
ZSO
HY
054 HV
+ PIPING & INSTRUMENTATION DIAGRAM
054
.
054
+
MAIN STEAM SYSTEM
A HP STEAM A
DFN=___[ , ]
TO CONDENSATE
LEVELS
LO FC LO RECEIVER TANK
ACTION NAME DATE CONTRACT No.: DOCUMENT NO.:
5277 2X-M6-AB-00006
V010 NOTE 9 V012
10083A 2X-M6-AB-00001
(M-13)
NOTE 9 NOTE 9 Issue By: Scale Sheet Of Sheets Rev.
/ 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16