Professional Documents
Culture Documents
Estimate
Estimate
column footing
location length width depth volume (cu.m.)
A/1 1.2 1.2 1.4 2.02
A/2 1.2 1.2 1.4 2.02
A/3 1.2 1.2 1.4 2.02
A/4 1.2 1.2 1.4 2.02
B/1 1.2 1.2 1.4 2.02
B/2 1.2 1.2 1.4 2.02
B/3 1.2 1.2 1.4 2.02
B/4 1.2 1.2 1.4 2.02
C/1 1.2 1.2 1.4 2.02
C/2 1.2 1.2 1.4 2.02
C/3 1.2 1.2 1.4 2.02
C/4 1.2 1.2 1.4 2.02
volume (cu.m.) 24.19
WALL FOOTING 1
location length width depth volume (cu.m.)
G.L. A/1-4 9.45 0.4 1.1 4.16
G.L. C/1-4 9.45 0.4 1.1 4.16
G.L.A-C/1 6.05 0.4 1.1 2.66
G.L.A-C/4 6.05 0.4 1.1 2.66
VOLUME (CU.M) 13.64
IMPORTED FILL
length width depth volume (cu.m.)
10.35 6.65 0.4 27.53
Add'l 30% for compaction 35.79
WALL FOOTING 1
location length width depth volume
G.L. A/1-4 10.65 0.4 0.1 0.43
G.L. C/1-4 10.65 0.4 0.1 0.43
G.L.A-C/1 6.95 0.4 0.1 0.28
G.L.A-C/4 6.95 0.4 0.1 0.28
VOLUME (CU.M) 1.41
SOG
length width depth volume
10.65 6.95 0.1 7.40
TIE BEAM
location length width depth volume
G.L. A/1-4 10.65 0.3 0.1 0.32
G.L. C/1-4 10.65 0.3 0.1 0.32
G.L.A-C/1 6.95 0.3 0.1 0.21
G.L.A-C/4 6.95 0.3 0.1 0.21
G.L. B/1-4 10.65 0.3 0.1 0.32
G.L. 2/A-C 6.95 0.3 0.1 0.21
G.L. 3/A-C 6.95 0.3 0.1 0.21
VOLUME (CU.M) 1.79
WALL FOOTING 2
location length width depth volume
interior 23.2 0.4 0.1 0.93
0.93
WALL FOOTING 1
location length width area(sq.m.)
G.L. A/1-4 10.35 0.4 4.14
G.L. C/1-4 10.35 0.4 4.14
G.L.A-C/1 6.65 0.4 2.66
G.L.A-C/4 6.65 0.4 2.66
13.6
SOG
length width area (sq.m.
10.65 6.95 74.02
74.02
TIE BEAM
location length width area (sq.m.)
G.L. A/1-4 10.35 0.2 2.07
G.L. C/1-4 10.35 0.2 2.07
G.L.A-C/1 6.65 0.2 1.33
G.L.A-C/4 6.65 0.2 1.33
G.L. B/1-4 10.35 0.2 2.07
G.L. 2/A-C 6.65 0.2 1.33
G.L. 3/A-C 6.65 0.2 1.33
11.53
WALL FOOTING 2
location length width area (sq.m.)
interior 21.15 0.4 8.46
8.46
CONCRETE
column footing
location length width depth
A/1 1.2 1.2 0.3 0.43
A/2 1.2 1.2 0.3 0.43
A/3 1.2 1.2 0.3 0.43
A/4 1.2 1.2 0.3 0.43
B/1 1.2 1.2 0.3 0.43
B/2 1.2 1.2 0.3 0.43
B/3 1.2 1.2 0.3 0.43
B/4 1.2 1.2 0.3 0.43
C/1 1.2 1.2 0.3 0.43
C/2 1.2 1.2 0.3 0.43
C/3 1.2 1.2 0.3 0.43
C/4 1.2 1.2 0.3 0.43
volume (cu.m.) 5.18
WALL FOOTING 1
location length width depth volume
G.L. A/1-4 9.45 0.4 0.2 0.76
G.L. C/1-4 9.45 0.4 0.2 0.76
G.L.A-C/1 6.05 0.4 0.2 0.48
G.L.A-C/4 6.05 0.4 0.2 0.48
VOLUME (CU.M) 2.48
TIE BEAM
location length width depth volume
G.L. A/1-4 9.45 0.3 0.20 0.57
G.L. C/1-4 9.45 0.3 0.20 0.57
G.L.A-C/1 6.05 0.3 0.20 0.36
G.L.A-C/4 6.05 0.3 0.20 0.36
G.L. B/1-4 9.45 0.3 0.20 0.57
G.L. 2/A-C 6.05 0.3 0.20 0.36
G.L. 3/A-C 6.05 0.3 0.20 0.36
3.15
SOG
length width depth volume
10.35 6.65 0.10 6.88
7.23
WALL FOOTING 2
location length width depth volume
interior 21.15 0.3 0.2 1.27
1.27
COLUMN
NO. OF COLUMN width length height volume (cu.m.)
12 0.3 0.30 4.40 4.75
4.75
BEAM
location length base height volume
B1
G.L. A-C/4 6.05 0.2 0.4 0.48
G.L. A-C/3 6.05 0.2 0.4 0.48
G.L. A-C/2 6.05 0.2 0.4 0.48
G.L. A-C/1 6.05 0.2 0.4 0.48
G.L. A/1-4 9.45 0.2 0.4 0.76
G.L. B/1-4 9.45 0.2 0.4 0.76
G.L. C/1-4 9.45 0.2 0.4 0.76
IB
ALL 31.95 0.15 0.2 0.96
5.16
COLUMN FOOTING
LENGTH (M.) NO.OF RSB NO.OF FTG. DIAMETER UNIT WEIGHT
1.2 12 12 0.016 7850
(TRANSVERSE BAR)
LOCATION LENGTH DIAMETER NO. OF BAR UNIT WEIGHT
A-B/4 0.4 0.01 12 7850
B-C/4 0.4 0.01 7 7850
A-B/1 0.4 0.01 12 7850
B-C/1 0.4 0.01 7 7850
A/1-4 0.4 0.01 27 7850
C/1-4 0.4 0.01 27 7850
WALL FTG. 2
(LONGITUDINAL BAR)
LOCATION LENGTH DIAMETER NO. OF BAR UNIT WEIGHT
21.15 0.012 4 7850
(TRANSVERSE BAR)
LOCATION LENGTH DIAMETER NO. OF BAR UNIT WEIGHT
0.6 0.012 53 7850
LAT. TIES
LOCATION HEIGHT OF COL. LENGTH OF BAR NO. OF LAT. TIES DIAMETER
4.5 1.2 38 0.01
STIRRUPS
LOCATION LENGTH OF MAIN BLENGTH OF STIRRUPDIAMETER NO. OF STIRRUPS
G.L. A-B/1 4.45 1 0.010 15.00
G.L. B-C/1 2.8 1 0.010 7.00
G.L. A-B/2 4.45 1 0.010 15.00
G.L. B-C/2 2.8 1 0.010 7.00
G.L. A-B/3 4.45 1 0.010 15.00
G.L. B-C/3 2.8 1 0.010 7.00
G.L. A-B/4 4.45 1 0.010 15.00
G.L. B-C/4 2.8 1 0.010 7.00
G.L. A/1-2 2.65 1 0.010 6.00
G.L. A/2-3 5.2 1 0.010 19.00
G.L. A/3-4 3.4 1 0.010 10.00
G.L. B/1-2 2.65 1 0.010 6.00
G.L. B/2-3 5.2 1 0.010 19.00
G.L. B/3-4 3.4 1 0.010 10.00
G.L. C/1-2 2.65 1 0.010 6.00
G.L. C/2-3 5.2 1 0.010 19.00
G.L. C/3-4 3.4 1 0.010 10.00
SOG
ALONG SHORT SPAN
LENGTH NO. OF BARS DIAMETER S.W.
6.95 27 0.01 7850
ALONG LONG SPAN
LENGTH NO. OF BARS DIAMETER S.W.
10.65 18 0.01 7850
STIRRUPS
LOCATION LENGTH OF BAR DIAMETER NO. OF BAR UNIT WEIGHT
G.L. A'-C'/2' 0.8 0.010 33.00 7850
G.L. A'/1'-2 0.8 0.010 2.00 7850
G.L. A'/2-3 0.8 0.010 17.00 7850
G.L. A'/3-4 0.8 0.010 8.00 7850
G.L. A'-A/2 0.8 0.010 1.00 7850
G.L. A'-A/3 0.8 0.010 1.00 7850
G.L. A'-A/4 0.8 0.010 1.00 7850
G.L. A'/1'-2 0.8 0.010 2.00 7850
G.L. A'/2-3 0.8 0.010 17.00 7850
G.L. A'/3-4 0.8 0.010 8.00 7850
G.L. A'-A/2 0.8 0.010 1.00 7850
G.L. A'-A/3 0.8 0.010 1.00 7850
G.L. A'-A/4 0.8 0.010 1.00 7850
ROOF BEAM
MAIN BAR (TOP & BOTTOM BARS)
NO. OF MAIN BAR
LOCATION SPAN DIAMETER LEFT SUPPORT MID SPAN
G.L. A-B/1 4.45 0.016 3 2
G.L. B-C/1 2.8 0.016 3 2
G.L. A-B/2 4.45 0.016 3 2
G.L. B-C/2 2.8 0.016 3 2
G.L. A-B/3 4.45 0.016 3 2
G.L. B-C/3 2.8 0.016 3 2
G.L. A-B/4 4.45 0.016 3 2
G.L. B-C/4 2.8 0.016 3 2
G.L. A/1-2 2.65 0.016 3 2
G.L. A/2-3 5.2 0.016 3 2
G.L. A/3-4 3.4 0.016 3 2
G.L. B/1-2 2.65 0.016 3 2
G.L. B/2-3 5.2 0.016 3 2
G.L. B/3-4 3.4 0.016 3 2
G.L. C/1-2 2.65 0.016 3 2
G.L. C/2-3 5.2 0.016 3 2
G.L. C/3-4 3.4 0.016 3 2
STIRRUPS
PERPENDICULAR
LOCATION DIAMETER SPAN SPAN (ALONG) NO. OF BARS
OFFICE
ALONG SHORT 0.012 4.15 3.1 22.00
ALONG LONG 0.012 3.1 4.15 12.00
LOCK-UP
ALONG SHORT 0.012 3.1 2.5 17.00
ALONG LONG 0.012 2.5 3.1 10.00
PANTRY, DRESSNG
RM. & F.E.
ALONG SHORT 0.012 4.15 4.9 22.00
ALONG LONG 0.012 4.9 4.15 18.00
MULTI-PURPOSE
CONFE. RM.
ALONG SHORT 0.012 2.5 4.9 14.00
ALONG LONG 0.012 4.9 2.5 18.00
LOBBY
ALONG SHORT 0.012 1.85 4.15 11.00
ALONG LONG 0.012 4.15 1.85 15.00
PORCH
ALONG SHORT 0.012 1.85 2.5 11.00
ALONG LONG 0.012 2.5 1.85 10.00
BOTTOM BARS
SPAN LENGTH OF BAR NO. OF BARS DIAMETER
S-1
TOP BARS
PANTRY, DRESSNG
RM. & F.E.
ALONG SHORT 0.012 0.7 4.9 5.00
ALONG LONG 0.012 4.9 0.7 26.00
MULTI-PURPOSE
CONFE. RM.
ALONG SHORT 0.012 0.7 4.9 5.00
ALONG LONG 0.012 4.9 0.7 26.00
LOBBY
ALONG SHORT 0.012 0.7 1.85 5.00
ALONG LONG 0.012 1.85 0.7 11.00
PORCH
ALONG SHORT 0.012 0.7 1.85 5.00
ALONG LONG 0.012 1.85 0.7 11.00
BOTTOM BARS
SPAN LENGTH OF BAR NO. OF BARS DIAMETER
MASONRY 107.14
PLUMBING
SANITARY SEWER
LINE
100mm dia PVC Pipes 10.35
75mm dia PVC Pipes
50mm dia PVC Pipes
25mm dia PVC Pipes 14
Water Line
20mm dia PVC Pipes 20
CONCRETE
TIE BEAM
LENGTH WIDTH AREA (SQ.M.) VOLUME (CU.M.)
35.8 0.3 0.30 3.22
STIRRUPS
LOCATION LENGTH LENGTH OF STIRRUPNO. OFSTIRRUPS
A-B/4 4.45 1.4 33
B-C/4 2.8 1.4 25
A-B/1 4.45 1.4 33
B-C/1 2.8 1.4 25
A/1-2 2.65 1.4 24
A/2-3 5.2 1.4 37
A/3-4 3.4 1.4 28
C/1-2 2.65 1.4 24
C/2-3 5.2 1.4 37
C/3-4 3.4 1.4 28
IMPORTED FILL
LOCATION LENGTH WIDTH
OFFICE 3.1 2.7
LOCK-UP 3.95 3.1
PANTRY 4.15 0.85
DRESSING RM. 4.15 1.5
NEAR E. EXIT 4.15 0.96
LOBBY 4.15 3.39
TOILET 2.5 1.2
CONFE. RM. 3.7 2.5
PORCH 2.5 2.35
BACKFILLING
23.61 CU.M.
SOIL POISONING
COLUMN FOOTING
LENGTH WIDTH NO. OF FTG.
1.2 1.2 12
WALL FOOTING 1
LENGTH WIDTH AREA (SQ.M.)
35.8 0.4 14.32
WALL FOOTING 2
LENGTH WIDTH (2) AREA (SQ.M.)
12.4 0.2 2.48
TIE BEAM
LENGTH WIDTH AREA (SQ.M.)
35.8 0.3 10.74
SLAB
LOCATION LENGTH WIDTH
OFFICE 3.1 2.7
LOCK-UP 3.95 3.1
PANTRY 4.15 0.85
DRESSING RM. 4.15 1.5
NEAR E. EXIT 4.15 0.96
LOBBY 4.15 3.39
TOILET 2.5 1.2
CONFE. RM. 3.7 2.5
PORCH 2.5 2.35
TOTAL AREA
CONCRETE
*BELOW FLOOR SLAB
COLUMN
location length width HEIGHT
A/1 0.3 0.3 1
A/2 0.3 0.3 1
A/3 0.3 0.3 1
A/4 0.3 0.3 1
B/1 0.3 0.3 1
B/2 0.3 0.3 1
B/3 0.3 0.3 1
B/4 0.3 0.3 1
C/1 0.3 0.3 1
C/2 0.3 0.3 1
C/3 0.3 0.3 1
C/4 0.3 0.3 1
RES.2
WEIGHT (KG.)
272.74
272.74
WEIGHT (KG.)
11.85
7.46
11.85
7.46
28.37
28.37
95.35
WEIGHT (KG.)
2.96
1.73
2.96
1.73
6.66
6.66
22.69
WEIGHT (KG.)
75.11
75.11
WEIGHT (KG.)
28.23
28.23
DEV. LENGTH
1049.8
WEIGHT (KGS.)
28.09
17.68
28.09
17.68
28.09
17.68
28.09
17.68
16.73
32.83
21.47
16.73
32.83
21.47
16.73
32.83
21.47
396.16
WEIGHT (KGS.)
115.69
WEIGHT (KGS.)
118.19
233.88
WEIGHT (KGS.)
54.61
11.68
30.94
19.57
4.42
4.42
4.42
11.68
30.94
19.57
4.42
4.42
4.42
205.50
WEIGHT (KGS.)
16.28
0.99
8.38
3.95
0.49
0.49
0.49
0.99
8.38
3.95
0.49
0.49
0.49
45.87
MAIN BAR
RIGHT SUPPORT LENGTH OF BARS SPECIFIC WEIGHT WEIGHT
3 22.25 7850 35.12
3 14 7850 22.10
3 22.25 7850 35.12
3 14 7850 22.10
3 22.25 7850 35.12
3 14 7850 22.10
3 22.25 7850 35.12
3 14 7850 22.10
3 13.25 7850 20.91
3 26 7850 41.04
3 17 7850 26.83
3 13.25 7850 20.91
3 26 7850 41.04
3 17 7850 26.83
3 13.25 7850 20.91
3 26 7850 41.04
3 17 7850 26.83
495.20
7850 212.54
7850 220.53
433.08
S.W. WEIGHT
7850 87.01
7850 101.08
188.08
W1 7.2
W2 3.15
W3 1.05
TOTAL AREA W4 0.2
25.80 W3,W3,D3,W4,W4 W5 0.2
22.17 W2,W4,W5,W5,D1 D1 4.32
12.16 W1 D3 1.935
16.01 W2,W5
76.14
80% , PAPALITAN YUNG DIMENSION
NATIONA
Northern and Cent
ABSTRACT OF P
Period Covered
ITEM
I.
A
II.
A
D
E
III.
A
1
2
3
4
5
6
7
B
1
2
3
4
5
6
7
IV.
A
B
V.
A
1
2
3
B
1
C
D
1
2
3
4
5
6
7
E
1
2
3
4
5
F
1
2
G
VI.
A
1
2
3
4
B
1
C
D
E
1
2
3
4
5
6
7
8
VII.
A
B
C
D
E
NATIONAL HOU
Northern and Central Luzo
ABSTRACT OF PHYSIC
Period Covered : Ma
DESCRIPTION
GENERAL REQUIREMENTS
Mobilization and Demobilization
Provision of transporting equipment and manpower from contractor's
depot to the project site and vice versa.
TEMFACIL (Including electrical and water consumption)
Supply materials and labor for the erection and dismantling of plant/
backyard and NHA field office, installation of power and water
system.
Personal Protective Equipment (NHA staff, workers & contractor)
Supply all materials for personal and protective equipment for safety
and health of personnel.
Permits & Licenses
Provisional sum for the application of building permits and other
licenses necessary for the construction of the building.
Sub-Total - General Requirements
GENERAL EARTHWORKS
Clearing and Grubbing
Supply all labor, equipment and tools in the clearing of the
site, cleared of rubbish, roots and other perishable and
objectionable matters to suitable subgrade.
Excavation
Supply all labor, equipment and tools needed for the excavation of
of footings, wall footings and tie beams to the specified lines and grades
as specified/shown in plans.
Gravel Bedding (Supply, Place and Compact)
Supply all materials, labor, tools, and equipment needed for
the spreading and compaction of gravel filling materials to the
specified lines and grades as shown in plans.
Backfill and Compact Trenches with Excavated Materials
Supply all labor, equipment and tools needed for the
backfilling and compaction of selected excavated materials
to lines and grades prior to placement of gravel bedding and
concrete pouring.
Imported Earthfill
Supply all materials, labor, tools and equipment needed for
the spreading and compaction of filling materials to the specified location
all in accordance to the specified lines and grades shown in plans.
Soil Poisoning
Supply all materials, labor and tools needed for the soil poisoning of
foundation.
Sub-Total - General Earthworks
CONCRETE WORKS
Supply all materials, labor, equipment and tools needed for
the placing of ready mix concrete on slab on fill, footing, wall
footings, tie beams, beams, column, roof deck, reinforcing bars, tie wires, spacers,
formworks and other incidentals necessary as specified/shown in plans.
Concreting Including Formworks
Column Footing
Wall Footing
Tie Beam
Slab on Fill
Columns
Beams
Suspended Slab/Roof Deck
Contract Duration :
Contract Cost :
PHYSICAL ACCOMPLISHMENT
CONTRACT
UNIT QTY. UNIT COST TO DATE PREVIOUS
COST
QTY. COST QTY.
228,461.61 72,961.43
236,889.88 189,777.200
- 189,777.200