B FA 16/04/19 FOR PLN APPROVAL DC PMK

A FA 16/04/19 FOR PLN APPROVAL DC PMK


REV. STATUS DATE MODIFICATION CHK'D APP'D

PT. PLN (PERSERO)


UNIT INDUK PEMBANGUNAN
SUMATERA BAGIAN TENGAH

CONTRACT NO. :
0034.PJ/DAN.02.02/UIPSBT/2018
PROJECT :

PEMBANGUNAN T/L 150 kV


RENGAT - PANGKALAN KERINCI (SECTION 3)

MAIN CONTRACTOR :

PT. HORAS BANGUN PERSADA


DRAWING TITLE :

Foundation Design and Drawing for Foundation Class 3 Tower Type AA

SCALE : DRAWN : MTY DESIGN : HL CHK'D : DC APP'D : PMK


NTS DATE : 16/04/19 DATE : 16/04/19 DATE : 16/04/19 DATE : 16/04/19
SHEET CONTR'S DWG. NO. REV.

A
0034PJ.UIP SBT - RGT.PKR - C - II - 304
PROJECT NO. PLN DWG NO.
FOUNDATION DESIGN LOAD
FOUNDATION DESIGN
FOUNDATION TOWER Aa1 DOC NO :
SOIL CLASS 3
PEKERJAAN PONDASI TOWER T/L 150 KV
RENGAT - PANGKALAN KERINCI (SECTION 3) PARAMETER DISAIN SHEET 1 OF 8

I. PERATURAN
A. Peraturan Beton Bertulang Indonesia 1971(PBI, Indonesia Concrete Design Code, April 1979)
B. Peraturan Perencanaan Bangunan Baja Indonesia (PPBBI) 1984

II. REFERENSI
A. Support Reaction Tower Design
B. Grafik dan Tabel Perhitungan Beton Bertulang Berdasarkan SKSNI T-15-1991-03
C. Dasar-dasar Perencanaan Beton Bertulang Berdasarkan SKSNI T-15-1991-03
D. Foundation Analysis and Design (Joseph E. Bowles)
E. Foundation Design Principles and Practices (Donald P. Coduto)

III. PROPERTI MEKANIS MATERIAL

A. BETON
Mutu beton K 225
Kuat tekan beton fcu = 187 Kg/cm²
Modulus elasticitas
· beban tetap Ecp = 87,460 Kg/cm²
· beban sementara Ect = 896,400 Kg/cm²
Berat jenis beton kering γcd = 2,400 Kg/m³
Berat jenis beton submerged γcw = 1,400 Kg/m³
Tegangan bonding ijin fbo = 13.67 Kg/cm²
Faktor reduksi kekuatan lentur Øf = 0.80
Fakto reduksi kekuatan geser Øs = 0.60
Faktor reduksi kekuatan tekan Øc = 0.65

B. BAJA TULANGAN
Modulus elastisitas Es = 2,100,000 Kg/cm²
- Mutu baja U 24 utk tulangan polos ( Ø 10 mm)
Tegangan leleh fy = 2,400 Kg/cm²

- Mutu baja U 32 utk tulangan ulir ( Ø >13 mm)


Tegangan leleh fy = 3,200 Kg/cm²

C. TANAH

Berat jenis tanah kering γsd = 1,600 Kg/m³


Berat jenis tanah submerged γsw = 1,200 Kg/m³
Teg. tumpu ijin (Allwb bearing cap) qa = 1.00 kg/cm² qa = qc rata2/30
Frustrum angle f = 10 °
Sudut geser dalam φ = 10

Koefisien tegangan pasif Kp = tan2 (45° +φ/2) = = 1.420


IV. JENIS PONDASI

Jenis Pondasi pad dan chimney

V. FAKTOR KEAMANAN
Faktor keamanan terhadap tegangan tumpu (bearing) SFN = 2
Faktor kemanan terhadap kekuatan struktur beton SFC = 2
Faktor keamanan terhadap uplift SFO = 2
0 FOUNDATION TOWER Aa1 DOC NO :
SOIL CLASS 3
PEKERJAAN PONDASI TOWER T/L 150 KV
RENGAT - PANGKALAN KERINCI (SECTION 3) BEBAN, NOTASI & DIMENSI SHEET 2 OF 8

VI. BEBAN

Termasuk faktor keamanan 1.5 (tower design applied )

Gaya untuk 1 tapak miring vertikal


Gaya tekan kritis (compression) Fzc = 40.671 Ton 39.719 Ton
Fzu =
Fx = 3.301 Ton
Fy = 5.175 Ton
Gaya angkat kritis (uplift) Fzc =
Fzu = 31.187 Ton 30.457 Ton
Fx = 3.748 Ton
Fy = 5.769 Ton
Gaya horisontal kritis Fzc = 57.213 Ton 55.874 Ton
Fzu = 53.637 Ton 52.382 Ton
Fx = 4.348 Ton
Fy = 2.123 Ton

VII. NOTASI transversal

h2

A ht
h1
A' Ht
longitudinal

B = Lebar pad
H = Tebal pad b
b = Lebar chimney
h1 = Tinggi chimney dari pad ke muka tanah b
h2 = Tinggi chimney dari muka tanah ke ujung atas
ht = Tinggi chimney = h1 + h2 Potongan A-A'
Ht = Kedalaman pondasi dari muka tanah= H + h1

VIII. PERHITUNGAN PONDASI


A. DIMENSI
Sudut bidang (face rake) ß = 8.8 °
Sudut ruang (hip rake) α = 9.1 °
Kedalaman pondasi dari muka tanah Ht = 2,200 mm
Tinggi chimney ht = 2,300 mm
Lebar chimney b = 500 mm
Lebar pad B = 4,000 mm
Tebal pad H = 400 mm
Tinggi chimney dari pad ke muka tanah h1 = 1,800 mm
Tinggi chimney dari muka tanah ke ujung atas h2 = 500 mm
Selimut beton bagian bawah tc = 50 mm
Selimut beton bagian atas/samping tc2 = 50 mm
Diameter tulangan d = 16 mm
0 FOUNDATION TOWER Aa1 DOC NO :
SOIL CLASS 3
PEKERJAAN PONDASI TOWER T/L 150 KV
RENGAT - PANGKALAN KERINCI (SECTION 3) CEK STABILITAS SHEET 3 OF 8

B. STABILITAS TERHADAP ANGKAT (UPLIFT)


Stabilitas terhadap daya uplift diperiksa menurut prinsip frustrum H tg α

B
Ht

α
B

Frustrum angle efektif= 10 ° 0.317

Volume beton di bawah muka tanah Vcc = 6.856 m³


Volume beton diatas muka tanah Vcc' = 0.127 m³
Volume total beton Vc = Vcc + Vcc' = 6.982 m³
Berat beton Wc = Vc .γcd = 16,758 Kg
Volume kerucut Vcon = 33.612 m³
Volume tanah dalam kerucut Vs = Vcon - Vcc = 26.756 m³
Berat tanah Ws = Vs .γsd = 42,810 Kg

Berat total utk melawan uplift Wtot = Ws + Wc = 59,568 Kg


Uplift maksimum (termasuk SF 2) Fzu vert = 30,457 Kg OK!
SF = 2.0
C. KAPASITAS BEARING

Berat bersih beton Wc' = Vcc .(γcd - γsd) + Vcc' .γcd = 5,788 Kg
Lengan momen La = Ht + h2 = = 2,700 mm
Beban transversal Fx = 3,301 Kg
Beban longitudinal Fy = 5,175 Kg
Resultan beban horisontal Fr = (Fy2 + Fx2)0.5 = 6,138 Kg
Momen akibat beban horisontal Mr = Fr . La = 16,573 Kg m
Momen akibat tekanan tanah lateral
MLat =½.b.h1 (h1.γsd.Kp)(Ht - 2/3h1)+ B.H.(h1.γsd.Kp)(½H) +½.B.H.((Ht- = 3,247 Kg m
h1). γsd. Kp)(⅓H)
Beban momen horisontal > tekanan lateral tanah, momen horizontal residual bekerja pada pad.
Momen horisontal residual = 13,326 Kg m
2
Tek. akibat beban vertikal & berat efektif pondasi (Fzc vert + Wc')/B2 = 0.284 Kg/cm
Tekanan akibat momen beban horisontal dan momen tekanan lateral tanah
[(Fx + Fy). La.].6/B3 - [½.b.h1 (h1.γsd.Kp)(Ht - 2/3h1)+ B.H.(h1.γsd.Kp)(½H)
+½.B.H.((Ht-h1). γsd. Kp)(⅓H)]6/B3 = 0.184 Kg/cm2
Tekanan total = 0.47 Kg/cm2
Kapasitas tumpu ijin (allowable bearing capacity) = 1.00 Kg/cm2
OK, tekanan total < allowable bearing capacity. SF = 2.13
0 FOUNDATION TOWER Aa1 DOC NO :

SOIL CLASS 3
PEKERJAAN PONDASI TOWER T/L 150 KV
RENGAT - PANGKALAN KERINCI (SECTION 3) CEK STABILITAS & PENULANGAN SHEET 4 OF 8

D. STABILITAS GULING
Gaya termasuk faktor keamanan 1.5
Gaya angkat (uplift) Fzu vert = 30,457 Kg
Gaya horisontal/transversal Fx = 3,748 Kg
Gaya horisontal/longitudinal Fy = 5,769 Kg
Momen guling Movt = Fzu vert . B/2+ (Fx + Fy).La = 86,610 Kgm
Momen lawan Msta = Wtot . B/2 + Mlat= 122,383 Kgm
Faktor keamanan Msta / Movt = 1.41 OK, pondasi stabil.

E. STABILITAS SLIDING
Faktor keamanan 2
µ= 0.4 (friction coefficient )
Gaya tahan horizontal Fsta=µ x Wtot = 23,827.20 Kg
Gaya horizontal/geser Fsli'= 9517.01 Kg
Fsta/Fsli ≥ 1.50
2.50 OK, pondasi stabil

F. DISAIN PAD

Tebal pad H = 400 mm


Tebal efektif te = 342 mm

Penulangan pad
Penulangan lapis bawah (akibat compression)
Penulangan dua arah.
2
Tegangan maksimum σs1= 0.669 Kg/cm
Momen M1 = σs1 AM1 Y = 2,902,484 Kgcm
F = (B-b)/2
k perlu = M1/(øf. B. te²) = 2,902,484/(0.8 x 400 x 34.20²)
= 7.75 Kg/cm2
= 760.48 KN/m2

B Dari Table 5.1.b utk fc = 20 MPa dan fy = 320 MPa


ρ perlu = 0.0022 ρ minimum = 0.000875
Y ρ pakai = 0.0022
As perlu = ρ B te = 0.0022 x 400 x 34.2 = 30.096 cm²
= 3,010 mm²
Penulangan 16 Ø 16 As = 32.17 cm²
3,217 mm² . . . OK!

Penulangan disebar dalam: 1 lapis


Pakai 16 Ø 16
Cek jarak p.k.p = 259.0 mm
Jarak tulangan p.k.p = 190 mm dua arah
AM1
Jumlah tulangan 21 buah

Panjang penyaluran
Panjang penyaluran dasar ldb = 0.02 Ab [fy/(fcu½)] = 295 mm
Minimum ldb = 0.06 db fy = 301 mm or 300 mm
Panjang penyaluran perlu ldb(rq) = 301 mm
Panjang penyaluran tersedia ldb(av) = 1,967 mm > panjang perlu OK.
0 FOUNDATION TOWER Aa1 DOC NO :

SOIL CLASS 3
PEKERJAAN PONDASI TOWER T/L 150 KV
RENGAT - PANGKALAN KERINCI (SECTION 3) PENULANGAN & CEK GESER SHEET 5 OF 8

Penulangan lapis atas (akibat uplift)


Penulangan dua arah.
2
Tegangan maksimum σs2= 0.471 Kg/cm
Momen M2 = 2,043,453 Kgcm

F = (B-b)/2 k perlu = M2/(øf. B. te²) = 2,043,453/(0.8 x 400 x 34.20²)


= 5.46 Kg/cm2
= 535.41 KN/m2

B
Dari Table 5.1.b utk fc = 20 MPa dan fy = 320 MPa
ρ perlu = 0.00220 ρ minimum = 0.000875
ρ pakai = 0.0022
As perlu = ρ B te = 0.0022 x 400 x 34.2 = 30.096 cm² = 3,010 mm²
Penulangan 16 Ø 16 As = 32.17 cm² = 3,217 mm² . . . OK!
Penulangan disebar dalam: 1 lapis
Pakai 16 Ø 16
Cek jarak p.k.p = 259.0 mm
Jarak tulangan p.k.p = 190 mm dua arah
Jumlah tulangan 21 buah

Panjang penyaluran
Panjang penyaluran dasar ldb = 0.02 Ab [fy/(fcu½)] = 295 mm
Minimum ldb = 0.06 db fy = 301 mm or 300 mm
Panjang penyaluran perlu ldb(rq) = 301 mm
Panjang penyaluran tersedia ldb(av) = 1,942 mm > panjang perlu OK.

Cek bearing
Bearing tdk boleh melampaui øc(0.85 fcu A1 (A2/A1)0.5) or øc(0.85 fcu A1)(2)
2
A1 = 2,500 cm A2 = 160,000 cm2
(A2/A1)0.5 = 8.00
Batas bearing = 515,897 Kg
Gaya compression = Fzc + Wc' = 46,460 Kg < batas bearing, OK.

Cek geser satu arah D te


Tebal efektif te = 342.0 mm
Muffing m= 0 mm
Lebar yang termasuk bidang geser D= 1,408.0 mm
Gaya geser yg bekerja pd bdg geser Vu = σs1. D. B = 37,679 Kg
X
Momen yang terjadi pada bidang geser kritis, Mu = 4,669 Kgcm
Vu te/Mu = 276 diambil faktor pengali 1
2
As = 3,217 mm fcu = 18.31 MPa
ρw = 0.002

Vc = 1/7( fcu0.5 + 120 ρw Vu te/Mu) B te


bidang geser
Vc = 1/7(18.3^0.5 + 120 x 0.002 x 1) 4000 x 342
Vc = 891 kN = 90,897 Kg
0 FOUNDATION TOWER Aa1 DOC NO :

SOIL CLASS 3
PEKERJAAN PONDASI TOWER T/L 150 KV
RENGAT - PANGKALAN KERINCI (SECTION 3) CEK GESER SHEET 6 OF 8

dan Vc < 0.30( fcu0.5) B te


< 0.3(18)^0.5 x 4,000 x 342.00
< 1,756 kN = 179,073 Kg

Vn = Øs Vc = 0.6 x 90,897
= 54,538 kg > 37,679 kg . . . OK!

Cek geser dua arah


Tebal efektif pad te = 342 mm
Lebar bidang geser kritis bo = b + te
= 842.0 mm
Panjang keliling Bv = 4 bo Bv = 3,368 mm
Tekanan yg terjadi pd tanah σs1 = 0.67 kg/cm²
Gaya geser pada bidang geser Vu = σs1 (B² - bo²)
= 102,297 kg 0.5 te b1 0.5 te
Vc = (1 + 2/βc)(1/6√fcu)Bv te bo
βc = 1
Vc = (1 + 2/βc)(1/6√fcu)Bv te 29,573 kN = 3,015,594 Kg
tapi Vc tidak boleh lebih dari
Vc = (1/3√fcu)Bv te
= 1,643 kN = 167,533 Kg
Vc = (αs te/Bv + 2)(1/12 √fcu)Bv te
= 2490.04 kN = 253,913 Kg
Vn = Øs Vc = 0.6 x 167,533
100,520 Kg < Vu punching shear!

G. DISAIN CHIMNEY
h1 = 1,800 mm
h2 h2 = 500 mm
ht = 2,300 mm
ht b= 500 mm
2
h1 Agr = 2,500 cm
Ø= 19 mm
cov = 50 mm
dlink = 10 mm

Cek kelangsingan
k= 1.00 lc = 2,300 mm i= 288.68 mm
λ = k lc/i = 7.97 < 34, OK

Momen, Mr - Mlat= 16,983 Kgm


Aksial compression, Pu= 54,229 Kg
Total momen, Mu = 16,983 Kgm

Pu/(Ø Agr. 0.85. fcu) = 0.21 > 0.1


et = Mu/ Pu = 0.313 m = 313 mm
et/b = 0.626
[Pu/(Ø Agr. 0.85. fcu)].(et/b) = 0.0658
jarak serat atas ke tulangan d' = 70 mm
d'/b = 0.139 ≈ 0.1
0 FOUNDATION TOWER Aa1 DOC NO :

SOIL CLASS 3
PEKERJAAN PONDASI TOWER T/L 150 KV
RENGAT - PANGKALAN KERINCI (SECTION 3) DISAIN CHIMNEY & STUB SHEET 7 OF 8

Dari grafik 6.2.d r= 0.014 β = 0.8


ρ = r. β = 0.0112 ρ minimum = 0.01
2
As tot = ρ . Agr = 2,800 mm → 10 bar
Pakai 4 buah per sisi Total = 12 buah
2
As tot = 3,402 mm

Jarak minimum antara tulangan 1.5 Ø = 28.5 mm or 40 mm


Cek jarak p.k.p 120 mm > 1.5 Ø, OK
Cek utk penjangkaran min., As needed = 0.005 Ag = 1250 mm2 < As tot OK

Panjang penyaluran
As tot = 3402.34 mm2
As req = 2800.00 mm2
½
ldb = Ø. fy/[4(fcu )] dan tdk kurang dari ldb min = 0.04 Ø. Fy
ldb = 348 mm ldb min = 243 mm
Koefisien modifikasi As req / As tot = 0.82
Panjang perlu 0.82 x 348 = 285.36 mm
Panjang tersedia = H - tc - 2 d = 318 mm > panjang perlu, OK

Sengkang
fy = 2,400 Kg/cm² fcu = 186.75 Kg/cm²
Ø= 10 mm Av = 157.08 mm² sengkang penuh
b= 500 mm d= 445 mm

Resultan gaya geser Fr = 8,184 Kg


Kapasitas geser beton Vn = Øs Vc = Øs 1/6( fcu0.5) b d
= 0.6 . 1/6(18.3)^0.5 x 500 x 445
= 9,522 kg
Gaya geser utk sengkang Vs = Fr - Vn = -1,338 Kg
Jarak perlu s = (Av fy. d)/Vs = -1,254 mm
Sengkang minimum s = (3 Av fy)/ d = 2,541 mm atau 285 mm
Jarak dipakai = 200 mm
Pakai sengkang Ø10 - 200

A-3-3

A-3-2

A-3-1

A-3-4
A-3-6
A-3-5
0 FOUNDATION TOWER Aa1 DOC NO :

SOIL CLASS 3
PEKERJAAN PONDASI TOWER T/L 150 KV
RENGAT - PANGKALAN KERINCI (SECTION 3) BAR BENDING SCHEDULE SHEET 8 OF 8

Tower AA A-3
BAR BENDING SCHEDULE
JUMLAH UNTUK SATU LEG BERAT (KG)
KODE DIA QTY PJG BENTUK UNIT TOTAL
TLG
A-3-1 19 12 2,799 6.240 74.88
250 2,549

A-3-2 10 11 1760 395 395 1.090 11.99


395
90
395
A-3-3 10 4 595 0.370 1.48
100 100
395
A-3-4 16 42 4,084 6.450 270.90
100 100
3,884

A-3-5 16 42 4,652 7.350 308.70


100
284 284
3,884
A-3-6 16 6 1,147 225 1.810 10.86
236
225

JUMLAH TOTAL 678.81

Berat penulangan = 97.22 Kg/m3 beton

4 LEG
KODE DIA PANJANG QTY/ TOTAL BERAT BERAT/ BERAT TOTAL
UNIT QTY SATUAN PTG TOTAL 1 TOWER
TLG (mm) (mm) (kg/m) (kg) (kg) (kg)
A-3-1 19 2,799 12 48 2.23 6.24 74.88 299.52
A-3-2 10 1,760 11 44 0.62 1.09 11.99 47.96
A-3-3 10 595 4 16 0.62 0.37 1.48 5.92
A-3-4 16 4,084 42 168 1.58 6.45 270.90 1,083.60
A-3-5 16 4,652 42 168 1.58 7.35 308.70 1,234.80
A-3-6 16 1,147 6 24 1.58 1.81 10.86 43.44
BERAT TOTAL 678.81 2,715.24
FOUNDATION DRAWING
ATTACHMENT
I ' .
I
I~ PT PlN (P""",) UNIT INDUK PEM BANGUNAN SUMATERA BAGIAN TENGAH
Komplek Citra Garden Square Blok R1 no. 7-11 dan R2 no. 1-3
I . . . JI. Purwodadi Panam, Kel.Sidomulyo Barat, kota Pekanbaru, Propinsi Riau. Kode Pos : 28294
I . Phone. : (0761) 6704881, Faximile. : (0761) 6704882

Bab IV.3.9: Pondasi Tower Transmisi BUI<U B

PPBGI1987 Pedoman Perencanaan Bangunan Tahan Gempa


Indonesia 1987

SK SNI T-15-1991-03 Tatacara Perhitungan Struktur untuk Bangunan


Gedung

SNI 03-3976-1995 Tatacara Pengadukan dan Pengecoran Beton

SK SNIM-62-199O--D3 Metoda Pembuatan dan Perawatan Benda Uji Beton di


Laboratorium

SNIT-15-1990 F Tata Cara Pembuatan Rencana Campuran Beton


Normal

SNI 03-2847-2002 Tata Cara Perhitungan Structure Beton untuk

o SNI 03-1726-2002
Bangunan Gedung

Perencanaan ket:ilianan gempa untuk struktur


bangunan.

4. KLASIFIKASI KELAS PONDASI


1) Penyedia Barang/Jasa bertanggungjawab penuh untuk menentukanjenis pondasi pada
setiap tower dan dicantumkan pada Foundation Schedule dan harns diperiksa dan
disetujui oleh Direksi PekerjaaniPerencanalPembuat Desain.

2) Dalam hal penyelidikan tanah te1ah dilaksanakan oleh Pemberi Pekerjaan. Penyedia
Barang/Jasa harns memastikan bahwa data penyelidikan tanah sesuai dengan kondisi
lapangan dan dapat digunakan dalam mendesain pondasi. Pengecekan atas
penyelidikan tanah harus dilakukan oleh Penyedia Barang/Jasa dan hasilnya
diserahkan kepada DireksiIPengawas Pekerjaan untuk mendapatkan persetujuan.
! '!
Apabila data penyelidikan tanah tidak tersedia, Penyedia Barang/Jasa harus
melakukan penyelidikan tanah sesuai dengan klausul penyelidikan tanah.

3) Jenis-Jenis Pondasi yang digunakan di dalam kontrak ini dibagi menjadi 8(delapan)
kelas pondasi berdasarkan kondisi tanah sebagai berikut:

(a) Pondasi Kelas 1 (Satu)

Pondasi kelas 1 (satu) diperuntukkan untuk kondisi tanah yang sangat bagus, tidak
berbatu dan tidak mengandung air tanah. Pondasi tipe ini berupa concrete pad &
chimney dengan daya dukung yang diijinkan lebih dari atau sarna dengan
2.50 kg/cm2 dan kurang dari 5 kg/cm2, sudut frustrum 20° dan berat tanah
diperkirakan 1600 kg/m3.

(b) Pondasi Kelas 2 (Dua)

Pondasi kel3E: 2 (dun) dipcruntukkan untuk untuk kondi~i Lanah yang bagus, tidak
berbatu dan tidak mengandung air tanah. Pondasi tipe ini berupa conr.n~tp. [lad ~
chimney dengan daya dukung yang diijinkan lebih dari atau sarna dengan
1.20 kg/cm2 dan kurang dari 2.50 kg/cm2, sudut frustrum 15° dan berat tanah
diperkirakan 1600 kg/m 3.

BAB IV.3.9- Hal. 2


':Jr.
f
PT PLN (P.,~,o) UNIT INDUK PEMBANGUNAN SUMATERA BAGIAN TENGAH
" Komplek Citra Garden Square Siok R1 no. 7-11 dan R2 no. 1-3
I. . i ~ JI. Purwodadi Panam, Kel.Sidomulyo Barat, kota Pekanbaru, Propinsi Riau. Kode Pos : 28294
i .. . Phone. : (0761) 6704881, Faximile. : (0761) 6704882

Bab IV.3.9: Pondasi Tower Transmisi BUKU B

(c) Pondasi Kelas 3 (Tiga)

Pondasi kelas 3 (tiga) diperuntukkan untuk kondisi tanah normal, tidak


mengandung air tanah. Pondasi tipe ini berupa concrete pad & chimney dengan
daya dukung yang diijinkan lebih dari atau sarna dengan 0.70 kg/cm 2 dan kurang
dari 1.20 kg / cm2, sudut frustrum 10° dan berat tanah diperkirakan 1600 kg/m3.

(d) Pondasi Kelas 4a (Empat "a")

Pondasi kelas 4a (empat "a") diperuntukkan untuk kondisi tanah berbatuan


lunak/soft rock (hatu non homogen), tidak mengandung air tanah. Pondasi tipe ini
berupa concrete pad & chimney dengan daya dukung yang diijinkan lebih dari 5
kg/cm2 hingga 8 kg/cm 2, sudut frustrum 0° dan berat tanah diperkirakan 2000
kg/m 3.
( . _\
\ _j (e) Pondasi Kelas 4 (Empat)

Pondasi kelas 4b (empat "b") diperuntukkan untuk kondisi tanah berbatuan


massif/hard rock (batu homogen), tidak mengandung air tanah. Pondasi tipe ini
berupa konstruksi pondasi berb~ntuk block at au pondasi dengan angkur dengan
daya dukung yang diijinkan lebih dari 8 kg/cm2, sudut frustrum 30° dan berat
tanah diperkirakan 2500 kg/m 3.

(f) Pondasi Kelas 5 (Lima)

Pondasi kelas 5 (lima) diperuntukkan pada daerah berair dimana kondisi air
permukaan tinggi seperti daerah yang curah hujan tinggi (high water level) , atau
kondisi air tanah dangkal tetapi pondasi terendam air atau kondisi tanah jelek dan
berair. Pondasi tipe ini berupa concrete pad & chimney yang diperlebar atau
menggunakan Raft Foundation dengan daya dukung yang diijinkan lebih dari atau
sarna dengan 0.50 kg/cm 2 dan kurang dari 0.70 kg / cm2, sudutfrustrum 0° dan
berat tanah diperkirakan 1950 kg/m3 (basah) untuk kondisi compress dan 950
kg/m 3 untuk kondisi Uplift.

(g) Pondasi Kelas 6 (Enam)

Pondasi kelas 6 (enam) diperuntukkan pada daerah tanah yang sangat lembek
(berlurnpur). Pondasi ini merupakan pondasi dalam (pile foundation}, dengan daya
dukung yang diperbolehkan kurang dari 0.5 kg/crn2. Pondasi ini dapat
menggunakan tiang pancang (precast concrete pile) atau Bored Pile dengan
persetujuan Engineer dan atau Direksi Pekerjaan.

Concrete Pile harus didesain untuk dapat digunakan pada kondisi air tanah
dangkal sehingga pondasi terendam air atau kondisi tanah jelek dan berair. Jenis
Pondasi Pile dapat dibagi 2(dua) dalam penerapannya, yaitu :

Pondasi Kelas 6a, dimana dari masing-masing kaki pondasi tidak terhubung
satu sama lain.

BAB IV.3.9- Hal. 3


I~I pr PLN (P.,,",o) UNIT INOUK PEMSANGUNAN SUMAlERA SAGIAN TENGAH
... ' ~ Komplek Citra Garden Square Blok R1 no. 7-11 dan R2 no. 1-3
:" i JI. Purwodadi Panam, Kel.Sidomulyo Barat, kota Pekanbaru, Propinsi Riau. Kode Pos : 28294
~• .c - Phone.: (0761) 6704881, Faximile. : (0761) 6704882

Bab IV.3.9: Pondasi Tower Transmisi BUKU B

Pondasi Kelas 6b, dimana dari rnasing-masing kaki pondasi terhubung satu
sarna lain baik dengan Balok (Beam) atau dengan penggabungan slab pondasi.
(h) Pondasi Kelas 7 (Tujuh )

Pondasi kelas 7 (tujuh) diperuntukkan untuk kondisi tanah normal, tetapi


mengandung air tanah. Pondasi tipe ini berupa concrete pad & chimney dengan
daya dukung yang diijinkan lebih dari atau sarna dengan 0.70 kg/em 2 dan kurang
dari 5.00 kg / em2 , sudutfrustrum 0° dan berat tanah diperkirakan 950 kg/rn 3 baik
untuk kondisi compress maupun kondisi Uplift.

BABIV.3.9- Hal. 4
~!'
... I j :r..=.,

r ,\

~
PT PLN (Persero) UNIT INDUK PEMBANGUNAN Sl'~~~TERA BAGIAN TENGAH
Komplek Citra Garden Square Siok R1 no. 7-11 dan Rt~. 1-3
::Jr. JI. PJrwodadi Panam, Kel.Sidomulyo Sarat, kota Pekanbaru, Propinsi Riau . Kode Pos : 28294
Phone. : (0761) 6704881, Faximile. : (0761) 6704882

Bab 1''1.3.9: Pondasi Tower Transmisi BUKU B

I
FOJNDATION CLASS 1 2 3 4a 4b 5 6 7

Cora'ete Pad &


Cora'ete Pad & Cora'ete Pad & Cora'ete Pad & Cora'ete Pad & Block and .An.::hJr
Foundati01 Types
Oi'nrey Oi'nrey Oi'nrey FCU1datioo
Oi'nrey or Raft Pile Foundation Cora'ete Pad & Oi'n~
Oi'nrey . EnargePad & Oi'nne;,

Approximcte soil/rock description Very Good Soil Good Soil


Normal soil ccndition nc Soft rod< ccndition (nor
gDU'ldWclter tx:mcgeneoJs rod<)
Hard rod< condition
~rod<»)
Bad soil conditionno
gDU'ld Wclter
VeI'j bad soil ccndition Normal soil condition
gDU'ldWclter
wi1

Allowable bearirg ~ (kg'on") 2.5 !o,O <5 1.2 !o,O < 2.5 0.7 !o,O < 1.2 5<0<8 0>8 0.5 !o,O < 0.7 0<0.5 0.7!o'o<5
I

Design Upcift frustrumangle 20° 15° 10° 0° 30° 0° 0° 0° I

Soil parameters
Suqect to detailed soil suqect to detailed soil St.tject to detailed soil Slbject to detailed soil &.tied to detailed soil Suqect to detailed soil &.tied to detailed soil &.tied to detailBd soil
investigation investigation investigation investigation investigation investigation investigation investigation

Soillrock ulit weight kg/m' 1600 1600 1600 2000 ") 2500 '*) 1950/950 *) 1950/950 *) 950 ') I

Water table BebMoundation level BebMoundation tevel BebMoundation level Be/o<Moundation level Belowfoundation level Variable Variable Prove foundation level

Concrete Lt1it weight kg/m' 2400 2400 2400 2400 2400 2400/1400 *) 2400 11400 *) 1400 *)

Note: 1. *) Used when calculation counter weight against uplift force. I


2. **) FOl.r'da1ion Rod< (block and ard-or) shall be use:lagainst uplift forDe.
3. AppfICable of soil investigation data obtaned fromDutch Cone Pmetranete'Test. Shall bedeductedusinga redu:::tion factor of 2().4() (assunptioo), sWject to Ergneersapproval.
---­ - - - -

BABIV.3.9- Hal. 5
r!::1
, ,i
PT PLN (P"'.'o) UNIT INDUK PEMBANGUNAN SUMATERA BAGIAN TENGAH
' Komplek Citra Garden Square Blok R1 no. 7-11 dan R2 no. 1-3
" j JI. Purwodadi Panam, Kel.Sidomulyo Barat, kota Pekanbaru, Propinsi Riau. Kode Pos : 28294

< . . Phone.: (0761) 6704881, Faximile. : (0761) 6704882

Bab IV.3.9: Pondasi Tower Transmisi BUKU B

5. PERENCANAAN DESAlN PONDASI


Penyedia Barang dan Jasa harns bertanggung jawab untuk mendesain pondasi yang aman
untuk setiap tower.

1. Semua Pondasi harns dirancang untuk menahan beban uplift terbesar, beban compress
dan beban horizontal yang berasal dari support reaksi tower dengan menggunakan
faktor keamanan berdasarkan kondisi nonnal dan kondisi broken wire.

2. Semua Pondasi harns dirancang berdasarkan parameter tanah yang didapatkan dari
laporan penyelidikan tanah.

3. Gambar yang teriampir dalam dokumen ini mernpakan gambar referensi. Sehingga
Penyedia BaranglJasa harns memasukkan Calculation Sheet untuk perhitungan desain
pondasi & Approval Drawing. Setiap calculation sheet dan Approval Drawing
(
disampaikan kepada PerencanaIPembuat DesainfDireksi Pekerjaan untuk
mendapatkan persetujuan, dan segala jenis pondasi yang digunakan untuk masing­
masing tower harns disetujui dan diputuskan berdasarkan desain yang paling
ekonomis.

4. Penurnnan (Settlement) pada pondasi, harns dicek pada pondasi kelas 3, 5, 6 dan 7w
berdasarkan data penyelidikan tanah.

5. Kondisi geologi untuk semua pondasi harns diperiksa sebelum dirancang.

6. Faktor Keamanan (Safety Factor) untuk perhitungan pondasi:

Stabilitas terhadap Guling (Overturning StiLbility) 2.00


Stabilitas terhadap Geser (Sliding Stability) 2.00
Stabiltas terhadap Uplift 2.00

Kapasitas Bearing untuk pondasi dalam :


(
• Tahanan Ujung 3.00

• Tahanan Gesek (Friction of pile) 5.00

6. PEKERJAAN TANAH PONDASI

6.1. Land Clearing


1. Pekerjaan Land Clearing adalah pembersihan lapangan atau area yang akan dikerjakan
agar diperoleh kondisi lahan yang bersih dan siap digarap untuk pekerjaan
selanjutnya.

2. Land Clearing meliputi pembersihan humus, ilalang, rnmput-rnmputan dengan


ketebalan 30 em dan sernua jenis pohon yang ada di area pekerjaan.

3. Dalam pekerjaan ini disamping pembersihan juga membuang hasilland clearing ke


.}
tempat pernbuangan atau atas pengawas pekerjaan .

BABIV.3.9- Hal. 6