CONTRACT NO. :
0034.PJ/DAN.02.02/UIPSBT/2018
PROJECT :
MAIN CONTRACTOR :
A
0034PJ.UIP SBT - RGT.PKR - C - II - 304
PROJECT NO. PLN DWG NO.
FOUNDATION DESIGN LOAD
FOUNDATION DESIGN
FOUNDATION TOWER Aa1 DOC NO :
SOIL CLASS 3
PEKERJAAN PONDASI TOWER T/L 150 KV
RENGAT - PANGKALAN KERINCI (SECTION 3) PARAMETER DISAIN SHEET 1 OF 8
I. PERATURAN
A. Peraturan Beton Bertulang Indonesia 1971(PBI, Indonesia Concrete Design Code, April 1979)
B. Peraturan Perencanaan Bangunan Baja Indonesia (PPBBI) 1984
II. REFERENSI
A. Support Reaction Tower Design
B. Grafik dan Tabel Perhitungan Beton Bertulang Berdasarkan SKSNI T-15-1991-03
C. Dasar-dasar Perencanaan Beton Bertulang Berdasarkan SKSNI T-15-1991-03
D. Foundation Analysis and Design (Joseph E. Bowles)
E. Foundation Design Principles and Practices (Donald P. Coduto)
A. BETON
Mutu beton K 225
Kuat tekan beton fcu = 187 Kg/cm²
Modulus elasticitas
· beban tetap Ecp = 87,460 Kg/cm²
· beban sementara Ect = 896,400 Kg/cm²
Berat jenis beton kering γcd = 2,400 Kg/m³
Berat jenis beton submerged γcw = 1,400 Kg/m³
Tegangan bonding ijin fbo = 13.67 Kg/cm²
Faktor reduksi kekuatan lentur Øf = 0.80
Fakto reduksi kekuatan geser Øs = 0.60
Faktor reduksi kekuatan tekan Øc = 0.65
B. BAJA TULANGAN
Modulus elastisitas Es = 2,100,000 Kg/cm²
- Mutu baja U 24 utk tulangan polos ( Ø 10 mm)
Tegangan leleh fy = 2,400 Kg/cm²
C. TANAH
V. FAKTOR KEAMANAN
Faktor keamanan terhadap tegangan tumpu (bearing) SFN = 2
Faktor kemanan terhadap kekuatan struktur beton SFC = 2
Faktor keamanan terhadap uplift SFO = 2
0 FOUNDATION TOWER Aa1 DOC NO :
SOIL CLASS 3
PEKERJAAN PONDASI TOWER T/L 150 KV
RENGAT - PANGKALAN KERINCI (SECTION 3) BEBAN, NOTASI & DIMENSI SHEET 2 OF 8
VI. BEBAN
h2
A ht
h1
A' Ht
longitudinal
B = Lebar pad
H = Tebal pad b
b = Lebar chimney
h1 = Tinggi chimney dari pad ke muka tanah b
h2 = Tinggi chimney dari muka tanah ke ujung atas
ht = Tinggi chimney = h1 + h2 Potongan A-A'
Ht = Kedalaman pondasi dari muka tanah= H + h1
B
Ht
α
B
Berat bersih beton Wc' = Vcc .(γcd - γsd) + Vcc' .γcd = 5,788 Kg
Lengan momen La = Ht + h2 = = 2,700 mm
Beban transversal Fx = 3,301 Kg
Beban longitudinal Fy = 5,175 Kg
Resultan beban horisontal Fr = (Fy2 + Fx2)0.5 = 6,138 Kg
Momen akibat beban horisontal Mr = Fr . La = 16,573 Kg m
Momen akibat tekanan tanah lateral
MLat =½.b.h1 (h1.γsd.Kp)(Ht - 2/3h1)+ B.H.(h1.γsd.Kp)(½H) +½.B.H.((Ht- = 3,247 Kg m
h1). γsd. Kp)(⅓H)
Beban momen horisontal > tekanan lateral tanah, momen horizontal residual bekerja pada pad.
Momen horisontal residual = 13,326 Kg m
2
Tek. akibat beban vertikal & berat efektif pondasi (Fzc vert + Wc')/B2 = 0.284 Kg/cm
Tekanan akibat momen beban horisontal dan momen tekanan lateral tanah
[(Fx + Fy). La.].6/B3 - [½.b.h1 (h1.γsd.Kp)(Ht - 2/3h1)+ B.H.(h1.γsd.Kp)(½H)
+½.B.H.((Ht-h1). γsd. Kp)(⅓H)]6/B3 = 0.184 Kg/cm2
Tekanan total = 0.47 Kg/cm2
Kapasitas tumpu ijin (allowable bearing capacity) = 1.00 Kg/cm2
OK, tekanan total < allowable bearing capacity. SF = 2.13
0 FOUNDATION TOWER Aa1 DOC NO :
SOIL CLASS 3
PEKERJAAN PONDASI TOWER T/L 150 KV
RENGAT - PANGKALAN KERINCI (SECTION 3) CEK STABILITAS & PENULANGAN SHEET 4 OF 8
D. STABILITAS GULING
Gaya termasuk faktor keamanan 1.5
Gaya angkat (uplift) Fzu vert = 30,457 Kg
Gaya horisontal/transversal Fx = 3,748 Kg
Gaya horisontal/longitudinal Fy = 5,769 Kg
Momen guling Movt = Fzu vert . B/2+ (Fx + Fy).La = 86,610 Kgm
Momen lawan Msta = Wtot . B/2 + Mlat= 122,383 Kgm
Faktor keamanan Msta / Movt = 1.41 OK, pondasi stabil.
E. STABILITAS SLIDING
Faktor keamanan 2
µ= 0.4 (friction coefficient )
Gaya tahan horizontal Fsta=µ x Wtot = 23,827.20 Kg
Gaya horizontal/geser Fsli'= 9517.01 Kg
Fsta/Fsli ≥ 1.50
2.50 OK, pondasi stabil
F. DISAIN PAD
Penulangan pad
Penulangan lapis bawah (akibat compression)
Penulangan dua arah.
2
Tegangan maksimum σs1= 0.669 Kg/cm
Momen M1 = σs1 AM1 Y = 2,902,484 Kgcm
F = (B-b)/2
k perlu = M1/(øf. B. te²) = 2,902,484/(0.8 x 400 x 34.20²)
= 7.75 Kg/cm2
= 760.48 KN/m2
Panjang penyaluran
Panjang penyaluran dasar ldb = 0.02 Ab [fy/(fcu½)] = 295 mm
Minimum ldb = 0.06 db fy = 301 mm or 300 mm
Panjang penyaluran perlu ldb(rq) = 301 mm
Panjang penyaluran tersedia ldb(av) = 1,967 mm > panjang perlu OK.
0 FOUNDATION TOWER Aa1 DOC NO :
SOIL CLASS 3
PEKERJAAN PONDASI TOWER T/L 150 KV
RENGAT - PANGKALAN KERINCI (SECTION 3) PENULANGAN & CEK GESER SHEET 5 OF 8
B
Dari Table 5.1.b utk fc = 20 MPa dan fy = 320 MPa
ρ perlu = 0.00220 ρ minimum = 0.000875
ρ pakai = 0.0022
As perlu = ρ B te = 0.0022 x 400 x 34.2 = 30.096 cm² = 3,010 mm²
Penulangan 16 Ø 16 As = 32.17 cm² = 3,217 mm² . . . OK!
Penulangan disebar dalam: 1 lapis
Pakai 16 Ø 16
Cek jarak p.k.p = 259.0 mm
Jarak tulangan p.k.p = 190 mm dua arah
Jumlah tulangan 21 buah
Panjang penyaluran
Panjang penyaluran dasar ldb = 0.02 Ab [fy/(fcu½)] = 295 mm
Minimum ldb = 0.06 db fy = 301 mm or 300 mm
Panjang penyaluran perlu ldb(rq) = 301 mm
Panjang penyaluran tersedia ldb(av) = 1,942 mm > panjang perlu OK.
Cek bearing
Bearing tdk boleh melampaui øc(0.85 fcu A1 (A2/A1)0.5) or øc(0.85 fcu A1)(2)
2
A1 = 2,500 cm A2 = 160,000 cm2
(A2/A1)0.5 = 8.00
Batas bearing = 515,897 Kg
Gaya compression = Fzc + Wc' = 46,460 Kg < batas bearing, OK.
SOIL CLASS 3
PEKERJAAN PONDASI TOWER T/L 150 KV
RENGAT - PANGKALAN KERINCI (SECTION 3) CEK GESER SHEET 6 OF 8
Vn = Øs Vc = 0.6 x 90,897
= 54,538 kg > 37,679 kg . . . OK!
G. DISAIN CHIMNEY
h1 = 1,800 mm
h2 h2 = 500 mm
ht = 2,300 mm
ht b= 500 mm
2
h1 Agr = 2,500 cm
Ø= 19 mm
cov = 50 mm
dlink = 10 mm
Cek kelangsingan
k= 1.00 lc = 2,300 mm i= 288.68 mm
λ = k lc/i = 7.97 < 34, OK
SOIL CLASS 3
PEKERJAAN PONDASI TOWER T/L 150 KV
RENGAT - PANGKALAN KERINCI (SECTION 3) DISAIN CHIMNEY & STUB SHEET 7 OF 8
Panjang penyaluran
As tot = 3402.34 mm2
As req = 2800.00 mm2
½
ldb = Ø. fy/[4(fcu )] dan tdk kurang dari ldb min = 0.04 Ø. Fy
ldb = 348 mm ldb min = 243 mm
Koefisien modifikasi As req / As tot = 0.82
Panjang perlu 0.82 x 348 = 285.36 mm
Panjang tersedia = H - tc - 2 d = 318 mm > panjang perlu, OK
Sengkang
fy = 2,400 Kg/cm² fcu = 186.75 Kg/cm²
Ø= 10 mm Av = 157.08 mm² sengkang penuh
b= 500 mm d= 445 mm
A-3-3
A-3-2
A-3-1
A-3-4
A-3-6
A-3-5
0 FOUNDATION TOWER Aa1 DOC NO :
SOIL CLASS 3
PEKERJAAN PONDASI TOWER T/L 150 KV
RENGAT - PANGKALAN KERINCI (SECTION 3) BAR BENDING SCHEDULE SHEET 8 OF 8
Tower AA A-3
BAR BENDING SCHEDULE
JUMLAH UNTUK SATU LEG BERAT (KG)
KODE DIA QTY PJG BENTUK UNIT TOTAL
TLG
A-3-1 19 12 2,799 6.240 74.88
250 2,549
4 LEG
KODE DIA PANJANG QTY/ TOTAL BERAT BERAT/ BERAT TOTAL
UNIT QTY SATUAN PTG TOTAL 1 TOWER
TLG (mm) (mm) (kg/m) (kg) (kg) (kg)
A-3-1 19 2,799 12 48 2.23 6.24 74.88 299.52
A-3-2 10 1,760 11 44 0.62 1.09 11.99 47.96
A-3-3 10 595 4 16 0.62 0.37 1.48 5.92
A-3-4 16 4,084 42 168 1.58 6.45 270.90 1,083.60
A-3-5 16 4,652 42 168 1.58 7.35 308.70 1,234.80
A-3-6 16 1,147 6 24 1.58 1.81 10.86 43.44
BERAT TOTAL 678.81 2,715.24
FOUNDATION DRAWING
ATTACHMENT
I ' .
I
I~ PT PlN (P""",) UNIT INDUK PEM BANGUNAN SUMATERA BAGIAN TENGAH
Komplek Citra Garden Square Blok R1 no. 7-11 dan R2 no. 1-3
I . . . JI. Purwodadi Panam, Kel.Sidomulyo Barat, kota Pekanbaru, Propinsi Riau. Kode Pos : 28294
I . Phone. : (0761) 6704881, Faximile. : (0761) 6704882
o SNI 03-1726-2002
Bangunan Gedung
2) Dalam hal penyelidikan tanah te1ah dilaksanakan oleh Pemberi Pekerjaan. Penyedia
Barang/Jasa harns memastikan bahwa data penyelidikan tanah sesuai dengan kondisi
lapangan dan dapat digunakan dalam mendesain pondasi. Pengecekan atas
penyelidikan tanah harus dilakukan oleh Penyedia Barang/Jasa dan hasilnya
diserahkan kepada DireksiIPengawas Pekerjaan untuk mendapatkan persetujuan.
! '!
Apabila data penyelidikan tanah tidak tersedia, Penyedia Barang/Jasa harus
melakukan penyelidikan tanah sesuai dengan klausul penyelidikan tanah.
3) Jenis-Jenis Pondasi yang digunakan di dalam kontrak ini dibagi menjadi 8(delapan)
kelas pondasi berdasarkan kondisi tanah sebagai berikut:
Pondasi kelas 1 (satu) diperuntukkan untuk kondisi tanah yang sangat bagus, tidak
berbatu dan tidak mengandung air tanah. Pondasi tipe ini berupa concrete pad &
chimney dengan daya dukung yang diijinkan lebih dari atau sarna dengan
2.50 kg/cm2 dan kurang dari 5 kg/cm2, sudut frustrum 20° dan berat tanah
diperkirakan 1600 kg/m3.
Pondasi kel3E: 2 (dun) dipcruntukkan untuk untuk kondi~i Lanah yang bagus, tidak
berbatu dan tidak mengandung air tanah. Pondasi tipe ini berupa conr.n~tp. [lad ~
chimney dengan daya dukung yang diijinkan lebih dari atau sarna dengan
1.20 kg/cm2 dan kurang dari 2.50 kg/cm2, sudut frustrum 15° dan berat tanah
diperkirakan 1600 kg/m 3.
Pondasi kelas 5 (lima) diperuntukkan pada daerah berair dimana kondisi air
permukaan tinggi seperti daerah yang curah hujan tinggi (high water level) , atau
kondisi air tanah dangkal tetapi pondasi terendam air atau kondisi tanah jelek dan
berair. Pondasi tipe ini berupa concrete pad & chimney yang diperlebar atau
menggunakan Raft Foundation dengan daya dukung yang diijinkan lebih dari atau
sarna dengan 0.50 kg/cm 2 dan kurang dari 0.70 kg / cm2, sudutfrustrum 0° dan
berat tanah diperkirakan 1950 kg/m3 (basah) untuk kondisi compress dan 950
kg/m 3 untuk kondisi Uplift.
Pondasi kelas 6 (enam) diperuntukkan pada daerah tanah yang sangat lembek
(berlurnpur). Pondasi ini merupakan pondasi dalam (pile foundation}, dengan daya
dukung yang diperbolehkan kurang dari 0.5 kg/crn2. Pondasi ini dapat
menggunakan tiang pancang (precast concrete pile) atau Bored Pile dengan
persetujuan Engineer dan atau Direksi Pekerjaan.
Concrete Pile harus didesain untuk dapat digunakan pada kondisi air tanah
dangkal sehingga pondasi terendam air atau kondisi tanah jelek dan berair. Jenis
Pondasi Pile dapat dibagi 2(dua) dalam penerapannya, yaitu :
Pondasi Kelas 6a, dimana dari masing-masing kaki pondasi tidak terhubung
satu sama lain.
Pondasi Kelas 6b, dimana dari rnasing-masing kaki pondasi terhubung satu
sarna lain baik dengan Balok (Beam) atau dengan penggabungan slab pondasi.
(h) Pondasi Kelas 7 (Tujuh )
BABIV.3.9- Hal. 4
~!'
... I j :r..=.,
r ,\
~
PT PLN (Persero) UNIT INDUK PEMBANGUNAN Sl'~~~TERA BAGIAN TENGAH
Komplek Citra Garden Square Siok R1 no. 7-11 dan Rt~. 1-3
::Jr. JI. PJrwodadi Panam, Kel.Sidomulyo Sarat, kota Pekanbaru, Propinsi Riau . Kode Pos : 28294
Phone. : (0761) 6704881, Faximile. : (0761) 6704882
I
FOJNDATION CLASS 1 2 3 4a 4b 5 6 7
Allowable bearirg ~ (kg'on") 2.5 !o,O <5 1.2 !o,O < 2.5 0.7 !o,O < 1.2 5<0<8 0>8 0.5 !o,O < 0.7 0<0.5 0.7!o'o<5
I
Soil parameters
Suqect to detailed soil suqect to detailed soil St.tject to detailed soil Slbject to detailed soil &.tied to detailed soil Suqect to detailed soil &.tied to detailed soil &.tied to detailBd soil
investigation investigation investigation investigation investigation investigation investigation investigation
Soillrock ulit weight kg/m' 1600 1600 1600 2000 ") 2500 '*) 1950/950 *) 1950/950 *) 950 ') I
Water table BebMoundation level BebMoundation tevel BebMoundation level Be/o<Moundation level Belowfoundation level Variable Variable Prove foundation level
Concrete Lt1it weight kg/m' 2400 2400 2400 2400 2400 2400/1400 *) 2400 11400 *) 1400 *)
BABIV.3.9- Hal. 5
r!::1
, ,i
PT PLN (P"'.'o) UNIT INDUK PEMBANGUNAN SUMATERA BAGIAN TENGAH
' Komplek Citra Garden Square Blok R1 no. 7-11 dan R2 no. 1-3
" j JI. Purwodadi Panam, Kel.Sidomulyo Barat, kota Pekanbaru, Propinsi Riau. Kode Pos : 28294
1. Semua Pondasi harns dirancang untuk menahan beban uplift terbesar, beban compress
dan beban horizontal yang berasal dari support reaksi tower dengan menggunakan
faktor keamanan berdasarkan kondisi nonnal dan kondisi broken wire.
2. Semua Pondasi harns dirancang berdasarkan parameter tanah yang didapatkan dari
laporan penyelidikan tanah.
3. Gambar yang teriampir dalam dokumen ini mernpakan gambar referensi. Sehingga
Penyedia BaranglJasa harns memasukkan Calculation Sheet untuk perhitungan desain
pondasi & Approval Drawing. Setiap calculation sheet dan Approval Drawing
(
disampaikan kepada PerencanaIPembuat DesainfDireksi Pekerjaan untuk
mendapatkan persetujuan, dan segala jenis pondasi yang digunakan untuk masing
masing tower harns disetujui dan diputuskan berdasarkan desain yang paling
ekonomis.
4. Penurnnan (Settlement) pada pondasi, harns dicek pada pondasi kelas 3, 5, 6 dan 7w
berdasarkan data penyelidikan tanah.