Professional Documents
Culture Documents
SMR First Quarter January March 2017
SMR First Quarter January March 2017
e-mail address
CEO/President
Tel #: __Fax #:
Responsible Officer/s: e-mail address:
Plant Manager:
Tel #: Fax #: e-mail address: _
Name.
Pollution Control
Tel #: _____ Fax #:
Officer
e-mail address: _
____________ __________________
Name/Signature of CEO/President Name/Signature of PCO ()
UNIVERSAL STEEL SMELTING CO., INC.
Reference No:
DENR Permits/Licenses/Clearances
Environmental
Permits Date of Issue Expiry Date
Laws
A/C No.
P.D. 984
PO No.
ECC 1
PD 1586 ECC 2
ECC 3
DENR
Registry ID
CCO Registry
RA 6969 Importer
Clearance No
Permit to
Transport
A/C No.
RA 8749
PO No.
Operation
Operating hours/day Operating days/week # of shift/day
Average 20 6 2
Maximum 24 6 2
Operation/Production/Capacity:
Average Daily
303.815mt Total Output This Quarter 18,532.831mt
Production Output
Total Electric
Total Water Consumption
915.99m³ Consumption this Quarter 1,995,000kwh
this Quarter (m³)
(KwH)
Please use additional sheet/s if necessary
MODULE 2: RA 6969
For producers
Average Daily
N/A Total Output this Quarter N/A
Production Output
Quantity of Stock Quantity of Stock
Inventory (Start of N/A Inventory (End of N/A
Quarter) Quarter)
Name of Buyer Quantity Date of Purchase
N/A N/A N/A
Other Information:
Manner of handling storage on-site N/A Treatment on-site N/A
hazardous wastes storage off-site N/A Treatment off-site N/A
Chemical Substitute Yes (please attach copy if not submitted/included in previous report/s or had been revised) N/A
Plan No N/A
HW Generation:
Remaining HW from
HW HW Generated
HW No. HW Class HW Nature Previous Report
Cataloguing
Quantity Unit Quantity Unit
1101 Waste oil Lube oil Toxic 0.905773 Tons 0.0.008458 Tons
D407 Mercury Fluorescent Toxic 0.01437 Tons 0.001360 Tons
Waste Storage, Treatment and Disposal :( Please fill-up one table per HW)
HW No,: 1101 __________
HW Details Qty of HW Treated: 0 Unit: 0 ___
TSD Location: - ___
New/Additional
Investments in WTP
(Description)
Cost of New/Add
Investments
2
3
4
5
N/A
N/A
Summary of APSE/APCF
Process Equipment Location # of hrs. of operations
1. Bunker Oil Tank Mill Plant 1,416 hours
2.
3.
4.
Fuel Burning Quantity # of hrs. of
Location Fuel Used
Equipment Consumed operations
1. Gen Set 100kw Mill Plant Diesel 348 liters 15hrs
3.
4.
5.
6.
2.
3.
4.
Cost of Treatment
Month 1 Month 2 Month 3
Cost of Person employed,
N/A N/A N/A
(salary)
Total Consumption of
N/A N/A N/A
Water (cubic meters)
Total Cost of chemicals
used (e.g., activated N/A N/A N/A
carbon, KMnO4)
Total Consumption of
N/A N/A N/A
Electricity (KwH)
Administrative and
N/A N/A N/A
Overhead Costs
Cost of operating in-
N/A N/A N/A
house laboratory, if any
Improvement or
modification, if any. N/A N/A N/A
(Description)
Cost of improvement of
N/A N/A N/A
modification
May 31,
2016 222Nm³/day - - 8mg/Nm³ 4mg/Nm³ 93.1mg/Nm³ - -
be secured. √
1.
2.
3.
4.
5.
6.
Please use additional sheet/s if necessary.
Brief Description of
Solid Waste Solid waste management depends on physical form of waste and
Management Plan (e.g., characteristics; Separation is usually implemented. We also perform
waste reduction, recycling and reuse system like lubricating of chain conveyor for used oil.
segregation, recycling)
MODULE 6: OTHERS
Personnel/Staff Training
# of Personnel
Date Conducted Course/Training Description
Trained
September 1~4, 2015 Basic Training Course for Pollution 1
Control Officer
SUBSCRIBED AND SWORN before me, a Notary Public, this ________ day of
______________________, affiants is exhibiting to me their Community Tax
Receipts:
Name: CTR No. Issued at Issued on