GOAF
4G ACCEPTANCE REPORT
ENODEB ID 338434
AREA SLUZ
APPROVED BY:
SITE GOAF
Site Configuration:
NE Name MME Name Site Type Site ID
GOAF TURISMO POOL 1 Outdoor Macro 338434
Huawei Technologies hereby certifies that the relevant parts of the Works referred to in this Conditional Acceptance Certificate
complies with the Network Rollout Procurement Agreement, in particular the Specifications and this has successfully passed the
SSV Acceptance Tests on the particular new site Basis.
Counter Signatures:
Name: Allan Geronimo Yin Xing Name: Macky Johnie Samonte Erwin Roque
Date: Date:
This document records the performance test result of new site GOAF of the Globe LTE FDD network to verify if the newly build
site performance achieves the performance requirements. All KPIs are divided into several parts, including RRC Connection Suc-
cess Rate, ERAB Setup Success Rate, PS Call Drop Rate, Intra-Frequency Handover Success Rate, User DL/UL Peak Throughput,
Average DL/UL Throughput that are pre-defined in the LTE KPI Proposal for SSV acceptance.
The document is highly confidential and is strictly to be used only by Globe and Huawei. This SSV Acceptance Report is made
according to the agreement document describing the area and the applicable design rules and values. This document will be
submitted in Hardcopy and Softcopy included supporting data. Information contained in this document shall not be disclosed to
any other party unless it is expressly authorized by Globe and Huawei.
1 INTRODUCTION .........................................................................................................................................8
2 TOOLS USED ..............................................................................................................................................9
3 DRIVE TEST METHODOLOGY ...................................................................................................................10
MOBILITY TEST 1 – LAPTOP 1 ........................................................................................................................10
MOBILITY TEST 2 – LAPTOP 1 ........................................................................................................................10
STATIONARY TEST – LAPTOP 1 ......................................................................................................................10
4 CELL INFORMATION and CROSS SECTOR VERIFICATION ........................................................................11
5 DRIVE TEST PLOTS ...................................................................................................................................12
5.1 Drive Test Pre-Define Route ....................................................................................................................12
5.2 Drive Test Plots and Graphs ....................................................................................................................13
5.3 Stationary Test Locations ........................................................................................................................22
5.4 Speed Test Screenshot Results ...............................................................................................................23
6 OSS REPORT .............................................................................................................................................29
6.1 NMS / OSS KPI Summary .........................................................................................................................29
7 DRIVE TEST STATISTIC..............................................................................................................................29
7.1 Drive Test Measurements .......................................................................................................................29
7.2 Mobility Handover Test ...........................................................................................................................29
7.3 Stationary Test Measurements ...............................................................................................................30
8 DRIVE TEST LOG FILES .............................................................................................................................30
8.1 Drive Test Log Files Round 1 Laptop 1 ....................................................................................................30
9 KPI OPTIMIZATION ACTIVITIES ................................................................................................................30
10 CONCLUSION and SUMMARY .................................................................................................................31
11 ABBREVIATION ........................................................................................................................................32
12 APPENDIX ................................................................................................................................................33
12.1As-built Antenna Photo ...........................................................................................................................33
12.2Modulation Scheme ................................................................................................................................36
12.3OSS KPI Graph..........................................................................................................................................37
LIST OF TABLE
Table 1-A: Site Details....................................................................................................................................... 8
Table 2-A: List of Tools ..................................................................................................................................... 9
Table 3-A: Mobility Test 1 Set-up Laptop 1 .................................................................................................... 10
Table 3-B: Mobility Test 2 Set-up Laptop 1 .................................................................................................... 10
Table 3-C: Stationary Test Set-up Laptop 1 .................................................................................................... 10
Table 4-A: Parameters and Cross Sector Checking ........................................................................................ 11
Table 4-B: Antenna Details ............................................................................................................................. 11
Table 6-A: OSS KPI Result ............................................................................................................................... 29
Table 7-A: Mobile Drive Test KPI Result ......................................................................................................... 29
Table 7-B: Mobile Drive Test Handover Result .............................................................................................. 29
Table 7-C: Stationary Test KPI Result ............................................................................................................. 30
Table 8-A: Drive Test Log Files Round 1 Laptop 1 .......................................................................................... 30
Table 9-A: Physical Changes Summary ........................................................................................................... 30
Table 9-B: Parameter Changes Summary....................................................................................................... 30
Site GOAF has finished integration on September 23, 2018. BFT test is conducted on September 23, 2018. Site GOAF
integration date is officially broadcast on September 23, 2018. While SSV drive testing is conducted on May 31, 2019.
DL/UL Bandwidth 10/5 MHz 10/5 MHz 10/5 MHz 10/5 MHz 10/5 MHz 10/5 MHz
CROSS SECTOR OK OK OK
Table 4-A: Parameters and Cross Sector Checking
Mobile Test
Target KPI DT Result Unit Comment
Key Performance Indicator
Call Setup Fallback (MO) Reference 100 %
Average DL Throughput 7.5Mbps 26.644 Mbps PASSED
SINR >= -3dB Reference 100 %
RSRP > -115dBm Reference 89 %
Table 7-A: Mobile Drive Test KPI Result
GOAF-1/11 Test Loc1 2 -75.5 27.00 26 40 PASSED 54.81 30.0 PASSED 18.18 5.0 PASSED
GOAF-2/12 Test Loc2 2 -84.38 27.00 27 40 PASSED 48.47 30.0 PASSED 19.59 5.0 PASSED
GOAF-3/13 Test Loc3 1 -81.75 29.00 23 40 PASSED 51.96 30.0 PASSED 19.53 5.0 PASSED
Table 7-C: Stationary Test KPI Result
Current Proposed
No Site Name Source Cell Name Target Cell Name Parameter
Value Value
1
2
3
4
5
Table 9-B: Parameter Changes Summary