M/W.496/CTR/8692 Date 16.06.

2015

SOUTHERN RAILWAY

LETTER OF ACCEPTANCE

Divisional Railway Manager’s Office,


Works Branch, Chennai-3
M/W.496/CTR/8692 Date: 16.06.2015

To
M/s. Elite Engineers
No.23, Phase-I, Sathuvacharai,
Vellore-632009.

Sirs,

Sub : ARAKKONAM - JOLARPETTAI Section - Proposed additional spans


for Br.No.540 on both Down and Up lines ,Rebuilding of Br no 449 UP
& DN , Br.No:548Dn, 549Dn & 551 Down Line with RCC Box.

Ref: Your offer for item No.10 of NIT No.


MAS/ 03 of 2015(OT) dated 13.03.2015.
*******
1.Your offer for the tender under reference for the above mentioned work has been accepted by the
competent authority at a total cost of Rs.2,26,29,650/- (Rupees Two crore twenty six lakhs
twenty nine thousand six hundred and fifty only).

Item Accepted Rate and Amount


Description
no Rate (Rs) Amount (Rs)
Schedule A1 SW I &II Rs.28,00,163/-
1 +65% Rs.46,20,269/-
USSOR 2011 Rates
Schedule A2 SW I& II Rs.24,12,240/-
2 +40% Rs.33,77,136/-
USSOR 2011 Rates
Schedule A3 SW I& II Rs.94,42,900/-
3 +5% Rs.99,15,045/-
USSOR 2011 Rates

4 Schedule B ( Item No. 8d Deleted) Rs.47,17,200/-


Grand Total of Schedule - A1+A2+A3 & B Rs.2,26,29,650/-

2. Security Deposit for this work is Rs.11,31,483/- (Rupees Eleven lakhs thirty one thousand
four hundred and eighty three only), which shall be recovered at the rate of 10% of each bill
amount till the full Security Deposit is recovered. No interest will accrue on the Security Deposit
lodged by you with the Railways.
1
M/W.496/CTR/8692 Date 16.06.2015

3. Please remit within 30 (Thirty) days from the date of issue of this letter, a sum of Rs.11,31,483/-
(Rupees Eleven lakhs thirty one thousand four hundred and eighty three only), as “
Performance guarantee” in any of the following form with valid up to 60 days beyond Stipulated
date of completion of work.

(i) Cash Deposit.


(ii) Irrevocable Bank guarantee.
(iii) Government securities including state loan bonds at 5% below the market value.
(iv) Deposit receipts, Pay orders, Demand drafts and Guarantee Bonds. These forms of
Performance Guarantee could be either of the State Bank of India or of any of the
Nationalized Banks.
(v) Guarantee Bonds executed or Deposits Receipts tendered by all Scheduled Banks.
(vi) A Deposit in the Post office saving Bank.
(vii) A Deposit in the National saving certificates.
(viii)Twelve years National Defense certificates.
(ix) Ten years National Defense Deposits.
(x) National Defense Bonds.
(xi) Unit Trust certificates at 5% below the market value or at the face value whichever is less.

3a.Failing which, a penal interest of 15% per annum for the delay in submission of PG beyond 30
days from the date of issue of LOA will be levied up to 60 days.
3b. Any failure to submit the requisite PG even after 60 days from the date of issue of LOA, the
contract shall be terminated duly forfeiting EMD and the other dues, if any, payable against the
contract.
3c. The failed contractor shall be debarred from participating in re-tender.
3d. This Letter of Acceptance is the due notice for submission of PG and that no further
Communication will be sent to you reminding for submission of PG. In case of failure to
submit PG within the stipulated date, action taken under clause 16(4) of GCC is final and binding

4. An amount of Rs.2,72,610/- (Rupees Two lakhs seventy two thousand six hundred and ten
only), has been paid by you towards EMD vide DD.No.437280 dated 13.04.2015 issued by
Indian Bank, Vellore will be adjusted with security deposit.

5. You are further directed to contact ADEN/CTR/MAS for further directions and the work shall
commence within 7 (seven) days from the date of receipt of this letter.

6. Completion period of this work shall be 9 months.

7. The sales tax at source as per section 13 OF TNVAT 2006 Act will be deducted of source from
your running bills, as per extent instructions.

8. Please note that the Income Tax (Including surcharge and Education Cess charge) as notified
from time to time by the Govt. of India will be deducted at source from your bills.

9. You are also advised to chalk out a program of work and submit the same to this office if not
already submitted along with the tender.
2
M/W.496/CTR/8692 Date 16.06.2015

10. You are also advised to attend this office for signing up the agreement for this work within 30
(Thirty) days of issue of this letter.

11. You may please note that until a formal agreement is executed this letter of acceptance will be
binding contract between you and the Railways and this will be merged into the agreement to be
executed.

12. Any amount involved on account of vitiation in the present tender due to variation in the
agreement quantity during the execution of work will be recovered from the bills due to you.

13. Price Variation Clause is applicable only for those works where tender of value [contract
agreement value] is more than Rupees Fifty lakhs.

14. In case of disagreement of any clause in the LOA with the Agreement, the latter shall “prevail “

15. Kindly acknowledge the receipt of this letter.

Thanking you,

Yours faithfully,
Sd/-xxxx
S.Anbalagan
Divisional Engineer/CTR/Chennai.
For and behalf of the President of India.

Copy to: Sr.DFM/MAS, ADFM/ Bills/MAS, ADEN/CTR/MAS, SSE/Br./VLK, SSE/W/Br/PER


Contractor Bill section with copies of tender schedule.
Regional Labour commissioner (Central) Ministry of Employment and Rehabilitation,
Shastri Bhavan, 26 Haddows Road, Chennai 6.

The Labour Enforcement Officer (Central) IV Madras Office of the


Regional Labour commissioner, 35, Haddows road, Chennai –6.

Deputy Commissioner, Enforcement, Commercial Taxes, Greams


Road, Chennai 6. The Assistant Labour Commissioner (Central)

Madras II Division, Chennai 6. The Commercial Tax Officer, Egmore II,


Assessment Circle, Chennai-31.

The Chief Vigilance Officer, S.Rly. Park Town, Chennai –3. . [LOA details
uploaded on SR Website].

3
M/W.496/CTR/8692 Date 16.06.2015

SOUTHERN RAILWAY
NAME OF WORK:
ARAKKONAM - JOLARPETTAI Section - Proposed additional spans
for Br.No.540 on both Down and Up lines ,Rebuilding of Br no 449
UP & DN , Br. No:548Dn, 549Dn & 551 Down Line with RCC Box

ITEM no 686 OF LAW 2010-11 (Sanctioned by ADRM/II/MAS No M/W .73 / LAW/2010-11 /AJJ-
REF JTJ/47. Dt. 29.1.2015 )

item No:1110 Of LAW 2010-11(Sanctioned by ADRM/II/MAS No M/W71/LAW/2013-14/AJJ-


JTJ/31 Dt. 06.03.2015 )

ITEM no 690 OF LAW 2010-11 (Sanctioned by Sr.DEN/CO-ORDN/MAS No M/W. 73/LAW/10-


11/MAS-AJJ/51 Dt. 20.9.2011 )

Schedule -" A-1"


List of items of work that are covered by the Southern Railway Unified standard
schedule of rates 2011 for Chennai Division.

USSOR
S.no. Item Qty. Rate Unit Description of work
Amount
No.
ARAKKONAM - JOLARPETTAI Section - Proposed additional spans for Br.No.540 on both
Down and Up lines.
1 ,011011 800 103.32 1 cum 82656 Earth work in excavation as per approved
drawings and dumping at embankment
site or spoil heap, within railway land,
including 50m lead and 1.5m lift, the lead
to be measured from the centre of gravity
of excavation to centre of gravity of spoil
heap; the lift to be measured from natural
ground level and paid for in layers of 1.5m
each including incidental work, as per
specifications All kinds of soils

2 182031 40 187.35 1 cum 7494 Demolishing stone rubble masonry


including stacking of serviceable material
and disposal of unserviceable material
within 50m lead Dry masonry
3 031011 20 1611.29 1 cum 32226 Providing and laying in position cement
concrete of specified proportion
excluding cost of cement, centering and
shuttering - All works upto plinth level 1:3:6
(1 cement : 3 sand : 6 graded stone
aggregate 20mm nominal size):
4
M/W.496/CTR/8692 Date 16.06.2015

4 031023 20 1866.25 1 cum 37325 Providing and laying in position cement


concrete of specified proportion excluding
cost of cement, centering and shuttering -
All works upto plinth level 1:2:4 (1 cement
: 2 sand : 4 graded stone aggregate
20mm nominal size)

5 032031 50 1972.49 1 cum 98625 Providing and fixing at or near ground


level, Precast M 20 grade cement
concrete as per approved design and
setting in position with cement mortar 1:3
(1 cement : 3 coarse sand), including the
cost of required centering and shuttering
complete but excluding the cost of
cement (cast at site) In kerbs, edging etc.

6 041011 20 1927.58 1 cum 38552 Providing and laying in position M-20


Grade concrete for reinforced concrete
structural elements, but excluding cost of
centering, shuttering, reinforcement and
Admixtures in recommended proportion
(as per IS:9103) to accelerate, retard
setting of concrete, improve workability
without impairing strength and durability
as per direction of Engineer in charge All
work upto plinth level including raft
foundation of washable aprons, HS tank,
pile cap, footings of FOB and Platform
shelter etc

7 043015 25 2670.33 1 cum 66758 Providing, hoisting and fixing in position


upto floor two level M-20 Grade precast
RCC work including setting in cement
mortar 1:3 (1 cement : 3 coarse sand) and
finishing smooth with 6mm thick cement
plaster 1:3 (1 cement : 3 fine sand) on
exposed surfaces complete including cost
of centering, shuttering, finishing,
admixtures in recommended proportion
(as per IS:9103) to accelerate, retard
setting of concrete, improve workability
without impairing strength and durability,
excluding cost of cement and steel
reinforcement, as per approved plan &
direction of Engineer Incharge In slabs for
drain covers, manhole covers, flue tops
etc.
5
M/W.496/CTR/8692 Date 16.06.2015

8 194010 130 1496.36 1 cum 194527 Providing and laying in position machine
mixed, machine vibrated and machine
batched Design Mix Cement Concrete
M35 grade (Cast in-Situ) in bottom/top
slab, side walls, toe wall and sumps
haunch filling head walls or any other
component using 20mm graded crushed
stone aggregate and coarse sand of
approved quality of cast in-situ RCC box
of size upto 5m (bigger inside dimension)
including finishing, Admixtures in
recommended proportions (as per
IS:9103), if approved in Mix design, to
accelerate, retard setting of concrete,
improve workability without impairing
strength and durability, complete as per
drawings and technical specifications as
directed by Engineer in charge. Payment
for cement, reinforcement and shuttering
shall be paid extra.

9 195038 600 247.20 1 sqm 148320 Centring and shuttering including strutting,
propping etc. and removal of form for In
Bottom/top slab, side walls, toe wall and
sumps haunch filling head walls or any
other component:

10 222040 120 1148.15 1 cum 137778 Supply and laying of coarse sand
including consolidation, supply of all
materials, labour, lead, lift, tools, plants,
crossing of tracks as per drawing and
technical specification as directed by the
Engineer in charge in case loose slush is
encountered at site of foundation before
casting the foundation or before laying
the filtering media

SW-II Proposed Rebuilding Of Br. No:548Dn, 549Dnand 551Dn in AJJ-JTJ Section Down Line with
RCC Box

11 011011 300 103.32 1 cum 30996 Earth work in excavation as per approved
drawings and dumping at embankment
site or spoil heap, within railway land,
including 50m lead and 1.5m lift, the lead
to be measured from the centre of gravity
of excavation to centre of gravity of spoil
heap; the lift to be measured from natural
ground level and paid for in layers of 1.5m
each including incidental work, as per
specifications All kinds of soils

6
M/W.496/CTR/8692 Date 16.06.2015

12 011012 100 303.29 1 cum 30329 Earth work in excavation as per approved
drawings and dumping at embankment
site or spoil heap, within railway land,
including 50m lead and 1.5m lift, the lead
to be measured from the centre of gravity
of excavation to centre of gravity of spoil
heap; the lift to be measured from natural
ground level and paid for in layers of 1.5m
each including incidental work, as per
specifications Ordinary Rock (not requiring
blasting)

13 011013 50 363.30 1 cum 18165 Earth work in excavation as per approved


drawings and dumping at embankment
site or spoil heap, within railway land,
including 50m lead and 1.5m lift, the lead
to be measured from the centre of gravity
of excavation to centre of gravity of spoil
heap; the lift to be measured from natural
ground level and paid for in layers of 1.5m
each including incidental work, as per
specifications Hard Rock (requiring
blasting)

14 011051 450 13.18 1 cum 5931 Extra for lead of earth work above initial
lead of 50m in all kind of soils and rocks
For every 50 m or part thereof - lead over
50m and upto 150m

15 012050 50 649.63 1 cum 32482 Supplying and filling sand in plinth and
under floors including watering, ramming,
consolidating and dressing complete

16 252020 100 230.00 1 cum 23000 Supply of Moorum

17 031010, 50 1575.63 1 cum 78782 Providing and laying in position cement


031012 concrete of specified proportion
excluding cost of cement, centering and
shuttering - All works upto plinth level :1:3:6
1:3:6 (1 cement : 3 sand : 6 graded stone
aggregate 40mm nominal size)

18 031020 40 1866.25 1 cum 74650 Providing and laying cement concrete, up


031023 to plinth in retaining walls, walls (any
thickness) including attached plasters,
columns, pillars, posts, struts, buttresses,
string or lacing courses, parapets, coping,
bed blocks, anchor blocks, plain window
sills, fillets etc, excluding the cost of
cement and of shuttering, centering. 1:2:4
(1 cement : 2 sand : 4 graded stone
aggregate 20mm nominal size)

7
M/W.496/CTR/8692 Date 16.06.2015

19 041011 30 1927.58 1 cum 57827 Providing and laying in position M-20


Grade concrete for reinforced concrete
structural elements, but excluding cost of
centering, shuttering, reinforcement and
Admixtures in recommended proportion
(as per IS:9103) to accelerate, retard
setting of concrete, improve workability
without impairing strength and durability
as per direction of Engineer in charge All
work upto plinth level including raft
foundation of washable aprons, HS tank,
pile cap, footings of FOB and Platform
shelter etc.
20 041012 30 2135.97 1 cum 64079 Providing and laying in position M-20
Grade concrete for reinforced concrete
structural elements, but excluding cost of
centering, shuttering, reinforcement and
Admixtures in recommended proportion
(as per IS:9103) to accelerate, retard
setting of concrete, improve workability
without impairing strength and durability
as per direction of Engineer in charge All
works in buildings above plinth level upto
floor two level

21 043015 200 2670.33 1 cum 534066 Providing, hoisting and fixing in position
upto floor two level M-20 Grade precast
RCC work including setting in cement
mortar 1:3 (1 cement : 3 coarse sand) and
finishing smooth with 6mm thick cement
plaster 1:3 (1 cement : 3 fine sand) on
exposed surfaces complete including cost
of centering, shuttering, finishing,
admixtures in recommended proportion
(as per IS:9103) to accelerate, retard
setting of concrete, improve workability
without impairing strength and durability,
excluding cost of cement and steel
reinforcement, as per approved plan &
direction of Engineer Incharge In slabs for
drain covers, manhole covers, flue tops
etc.
22 042040 600 7.57 1 sqm 4542 Supplying and applying shuttering oil for
mould releasing, having (flash point 54°C
and specific gravity 0.88±0.02) for
concrete formwork to be applied either
by brush or with spray machine to the
entire satisfaction of Engineer Incharge
23 195031 120 144.80 1 Sqm 17376 Centring and shuttering including strutting,
propping etc. and removal of form for
:RCC Raft Foundation & Pile cap
24 195032 150 247.20 1 Sqm 37080 Centring and shuttering including strutting,
propping etc. and removal of form for
:Abutment, pier, wing walls and return walls

8
M/W.496/CTR/8692 Date 16.06.2015

25 195038 500 247.20 1 Sqm 123600 Centring and shuttering including strutting,
propping etc. and removal of form for :
Bottom/top slab, side walls, toe wall and
sumps haunch filling head walls or any
other component
26 194010 550 1496.36 1 cum 822998 Providing and laying in position machine
mixed, machine vibrated and machine
batched Design Mix Cement Concrete
M35 grade (Cast in-Situ) in bottom/top
slab, side walls, toe wall and sumps
haunch filling head walls or any other
component using 20mm graded crushed
stone aggregate and coarse sand of
approved quality of cast in-situ RCC box
of size upto 5m (bigger inside dimension)
including finishing, Admixtures in
recommended proportions (as per
IS:9103), if approved in Mix design, to
accelerate, retard setting of concrete,
improve workability without impairing
strength and durability, complete as per
drawings and technical specifications as
directed by Engineer in charge. Payment
for cement, reinforcement and shuttering
shall be paid extra.

2800163
(Items Twenty six only)

Add accepted rate of +65% over SRUSSOR 2011 Rs.18,20,106/-


Total of Schedule A1 Rs.46,20,106/-

9
M/W.496/CTR/8692 Date 16.06.2015

SOUTHERN RAILWAY
NAME OF WORK:
ARAKKONAM - JOLARPETTAI Section - Proposed additional spans
for Br.No.540 on both Down and Up lines ,Rebuilding of Br no 449
UP & DN , Br. No:548Dn, 549Dn & 551 Down Line with RCC Box

ITEM no 686 OF LAW 2010-11 (Sanctioned by ADRM/II/MAS No M/W .73 / LAW/2010-11 /AJJ-
REF JTJ/47. Dt. 29.1.2015 )

item No:1110 Of LAW 2010-11(Sanctioned by ADRM/II/MAS No M/W71/LAW/2013-14/AJJ-


JTJ/31 Dt. 06.03.2015 )

ITEM no 690 OF LAW 2010-11 (Sanctioned by Sr.DEN/CO-ORDN/MAS No M/W. 73/LAW/10-


11/MAS-AJJ/51 Dt. 20.9.2011 )

Schedule " A -2 "


List of items of work that are covered by the Unified standard schedule of rates
2011 for Chennai Division.

S.no BSR Item No. Qty. Rate Unit Amount Description of work

1 033061 456 5290 1 MT 2412240 Supply and using cement at


worksite OPC 43 Grade:

TOTAL 2412240
(Items ONE only)

Add accepted rate of +40% over SRUSSOR 2011 Rs.9,64,896/-


Total of Schedule A2 Rs.33,77,136/-

10
M/W.496/CTR/8692 Date 16.06.2015

SOUTHERN RAILWAY
NAME OF WORK:
ARAKKONAM - JOLARPETTAI Section - Proposed additional spans
for Br.No.540 on both Down and Up lines ,Rebuilding of Br no 449
UP & DN , Br. No:548Dn, 549Dn & 551 Down Line with RCC Box

ITEM no 686 OF LAW 2010-11 (Sanctioned by ADRM/II/MAS No M/W .73 / LAW/2010-11 /AJJ-
REF JTJ/47. Dt. 29.1.2015 )
item No:1110 Of LAW 2010-11(Sanctioned by ADRM/II/MAS No M/W71/LAW/2013-14/AJJ-
JTJ/31 Dt. 06.03.2015 )

ITEM no 690 OF LAW 2010-11 (Sanctioned by Sr.DEN/CO-ORDN/MAS No M/W. 73/LAW/10-


11/MAS-AJJ/51 Dt. 20.9.2011 )

Schedule " A-3 "


List of items of work that are covered by the Unified standard schedule of rates
2011 for Chennai Division.

BSR Item
S.no Qty. Unit Description of work
No. Rate Amount
1 045014 178 53050 1 MT 9442900 Supplying reinforcement for R.C.C.
work including straightening, cutting,
bending, placing in position and
binding all complete High yield
strength deformed bars-

TOTAL 9442900
(Items ONE only)

Add accepted rate of +5% over SRUSSOR 2011 Rs.4,72,145/-


Total of Schedule A3 Rs.99,15,045/-

11
M/W.496/CTR/8692 Date 16.06.2015

SOUTHERN RAILWAY
NAME OF WORK
ARAKKONAM - JOLARPETTAI Section - Proposed additional spans
for Br.No.540 on both Down and Up lines ,Rebuilding of Br no 449 UP
& DN , Br. No:548Dn, 549Dn & 551 Down Line with RCC Box

REF ITEM no 686 OF LAW 2010-11 (Sanctioned by ADRM/II/MAS No M/W .73 / LAW/2010-11 /AJJ-
JTJ/47. Dt. 29.1.2015 )
item No:1110 Of LAW 2010-11(Sanctioned by ADRM/II/MAS No M/W71/LAW/2013-14/AJJ-
JTJ/31 Dt. 06.03.2015 )

ITEM no 690 OF LAW 2010-11 (Sanctioned by Sr.DEN/CO-ORDN/MAS No M/W. 73/LAW/10-


11/MAS-AJJ/51 Dt. 20.9.2011 )

SCHEDULE- 'B'
List of items of work that are not covered by the Unified standard schedule of rates
2011 for Chennai Division

S.No DESCRIPTION OF WORK

1 Removing the existing P.way with PSC/wooden/steel sleepers with all fittings and fastenings
and stacking alongside the track without causing any damage and stacking the same in
countable manner and relaying the same as directed by the Engineer in charge with all
lead and lift etc., complete. (All labour, tools, materials, , are to be supplied by the
contractor only at his own cost.)

UNIT QTY RATE


metre 190 RATE IN FIGURES
of
track Rupees Paise
2 0 0 0 0
RATE IN WORDS (in CAPITAL LETTERS)

Rupees CRORES

LAKHS
THOUSANDS
T W O HUNDREDS
Z E R O TENS
Z E R O ONCE

Z E R O PAISE
Rs.38,000/- (Rupees Thirty eight thousand only)

12
M/W.496/CTR/8692 Date 16.06.2015

2 Removing existing ballast, screening and collecting the same in to gunny/polythene bags
and stacking at the nominated locations and dumping the same while linking of track under
LB/PB up to formation level and as directed by the Engineer in charge with all lead and lift
etc., complete.

UNIT QTY RATE


metre 190 RATE IN FIGURES
of
track Rupees Paise
2 0 0 0 0
RATE IN WORDS (in CAPITAL LETTERS)

Rupees CRORES

LAKHS

THOUSANDS

T W O HUNDREDS

Z E R O TENS

Z E R O ONCE

Z E R O PAISE

Rs.38,000/- (Rupees Thirty eight thousand only)


3 Cutting of 52 kg/60 kg rails in running track with hacksaw cutting equipment to the correct
vertical plane duly re-spacing the sleepers wherever necessary with contractor's own rail
cutting equipment under line block condition with all lead and lift etc. Complete and a
directed by the Engineer in charge.

UNIT QTY RATE


Per Cut 52 RATE IN FIGURES

Rupees Paise
1 0 0 0 0
RATE IN WORDS (in CAPITAL LETTERS)
Rupees CRORES
LAKHS
THOUSANDS

O N E HUNDREDS

Z E R O TENS
Z E R O ONCE
Z E R O PAISE

Rs.5,200/- (Rupees Five thousand and two hundred only)

13
M/W.496/CTR/8692 Date 16.06.2015

4 Drilling 32mm dia fish holes in 52kg/60 kg rails to correct spacing and size in running track in
order to fix fish bolts and nuts with all lead and lift complete etc., and as directed by the
Engineer in charge.

UNIT QTY RATE


Per 96 RATE IN FIGURES
Hole
Rupees Paise

5 0 0 0
RATE IN WORDS (in CAPITAL LETTERS)

Rupees CRORES

LAKHS

THOUSANDS

HUNDREDS

F I V E TENS

Z E R O ONCE

Z E R O PAISE

Rs.4,800/-(Rupees Four thousand and eight hundred only)


5 Trucking out of precast RCC boxes and slabs from the nearby location to the bridge site by
trailor /truck of suitable capacity without causing any damage to rcc box including loading
,leading ,unloading with all labour, lead and lift etc complete as directed by engineer in charge
-

UNIT QTY RATE


per 550 RATE IN FIGURES
metric Rupees Paise
tonne
5 0 0 0
RATE IN WORDS (in CAPITAL LETTERS)
Rupees CRORES
LAKHS
THOUSANDS
HUNDREDS
F I V E TENS
Z E R O ONCE
Z E R O PAISE

Rs.27,500/- (Rupees Twenty seven thousand and five


hundred only)

14
M/W.496/CTR/8692 Date 16.06.2015

6 Earthwork excavation to the required depth & width under line block/power block for placing
the RCC base slabs and RCC box by using heavy machines such as Poclain, JCB's,
Tipper/tractor of required numbers and capacity and as directed by the Engineer in charge
including using the controlled blasting/ rock breaker if required. Machineries required should be
mobilised to work spot with contractors own means of transport and as directed by the Engineer
in charge with all lead and lift etc., complete. (Rate includes the hire charges of Poclain, JCB,
Compressor, concrete breaker, controlled blasting as required, trailer/tipper, etc., and as
directed by the Engineer in charge).

UNIT QTY RATE


per 42 RATE IN FIGURES
metre Rupees Paise
of
1 2 0 0 0 0 0
barrel
RATE IN WORDS (in CAPITAL LETTERS)
length
Rupees CRORES
LAKHS
T W E L V E THOUSANDS
Z E R O HUNDREDS
Z E R O TENS
Z E R O ONCE
Z E R O PAISE

Rs.5,04,000/- (Rupees Five lakhs and four thousand only)


7 Lifting and laying in position and erection of RCC boxes/slab available at site , in the location to
correct alignment by using contractor's road crane of required capacity or by any other
approved means and as directed by the engineer in charge with all lead and lift etc complete.
(Rate includes the hire charges of required capacity of road crane with scroler wheel type or
similar type including standby)

UNIT QTY RATE


per 2250 RATE IN FIGURES
metric Rupees Paise
tonne
1 7 9 0 0 0
RATE IN WORDS (in CAPITAL LETTERS)
Rupees CRORES
LAKHS
O N E THOUSANDS
S E V E N HUNDREDS
N I N E TENS
Z E R O ONCE
Z E R O PAISE

Rs.40,27,500/- (Rupees Forty lakhs twenty seven thousand five hundred


only)

15
M/W.496/CTR/8692 Date 16.06.2015

8(a) Supply and placing in position of sand/earth bags to retain the earth between RCC box and
formation and the same should be stacked in position at nominated locations without
causing any infringement to the running traffic with all lead and lift etc., complete and as
directed by the Engineer in charge. (All labour, materials, tools and plants, etc., are to be
supplied by the tenderer/contractor only at his own cost. Required sand/earth will be
supplied by the Railway's at free of cost.)

UNIT QTY RATE


per 5600 RATE IN FIGURES
Bag Rupees Paise
2 0 0
RATE IN WORDS (in CAPITAL LETTERS)
Rupees CRORES
LAKHS
THOUSANDS
HUNDREDS
TENS
T W O ONCE
Z E R O PAISE
Rs.11,200/- (Rupees Eleven thousand and two hundred only)

8(b) Assembling, linking and laying of 52Kg rails on class II PSC sleepers to correct spacing of
M+7 density with all fittings and fastenings to correct gauge and fixing of rails to correct
position including greasing of ERCs and aligning and lifting to proposed alignment and level
up to 100mm high and levelling using peg driven at site with initial rough packing, boxing,
dressing, profiling to correct profile etc. complete with available ballast with all lead and lift
etc. All labour and tools including cutting equipment and other consumable stores are to be
supplied by Contractor/Tenderer only at his own cost and risk

UNIT QTY RATE


m 180 RATE IN FIGURES
length Rupees Paise
of
2 0 0 0 0
track
RATE IN WORDS (in CAPITAL LETTERS)
Rupees CRORES
LAKHS

THOUSANDS
T W O HUNDREDS
Z E R O TENS
Z E R O ONCE
Z E R O PAISE

Rs.36,000/- (Rupees Thirty six thousand only)

16
M/W.496/CTR/8692 Date 16.06.2015

8 (c) Demolishing exg brick arch bridge under LB including earth work to places boxes.

UNIT QTY RATE


per 50 RATE IN FIGURES
metre Rupees Paise
5 0 0 0 0
RATE IN WORDS (in CAPITAL LETTERS)
Rupees CRORES
LAKHS
THOUSANDS
F I V E HUNDREDS
Z E R O TENS
Z E R O ONCE
Z E R O PAISE
Rs.25,000/- (Rupees Twenty five thousand only)
8(d) Demolishing exg brick arch bridge under LB including earth work to places boxes.

UNIT QTY RATE


per 50 RATE IN FIGURES
metre Rupees Paise

RATE IN WORDS (in CAPITAL LETTERS)


Rupees CRORES
LAKHS
THOUSANDS
DELETED HUNDREDS
TENS
ONCE
PAISE

[Items Eight only)

Total of Schedule – B Rs.47,17,200/-


Total of Schedule – A1 Rs.46,20,269/-
Total of Schedule – A2 Rs.33,77,136/-
Total of Schedule – A3 Rs.99,15,045/-
Total of Schedule A1+A2+A3 & B Rs.2,26,29,650/-
(Rupees Two crores twenty six lakhs twenty nine thousand six
hundred and fifty only)