Field Inspection and Test Report

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 18

FIELD INSPECTION AND TEST REPORT

230KV GIS LCC FUNCTION TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:

FUNCTION TEST ITEM

DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 230KV GIS POWER SUPPLY CHECK
2 230KV INDICATION CHECK
3 230KV AUXILIARY CONTACT CHECK
4 230KV FUNCTION ALARM CHECK
5 230KV GIS FUNCTION CHECK

INSTRUMENT

DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE

NOTE:

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date
Page 1 of 1
FIELD INSPECTION AND TEST REPORT

230KV GIS LCC FUNCTION TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:

1. 230KV GIS POWER SUPPLY CHECK

NO FUNCTION DESCRIPTION OPERATED BY TERMINAL RESULT


MEASUREMENT SIGNAL PASS FAIL
1 AC Supply (External Supply 220-230VAC) 01BHC30 X1AC:3-X1AC:1
Heater Circuit & Lighting -F10
AC230V Socket -F12
-Check Heater in LCC Panel TH1 & TH2 X1AL:1 - X1AL:2
-Check Heater in CB Q50A 80112C Phase A in box Q50A
-Check Heater in CB Q50B 80112C Phase B in box Q50B
-Check Heater in CB Q50C 80112C Phase C in box Q50C
-Check Heater in DS-Q28 80111 in box Q28
-Check Heater in Work ES-Q34 80111CG in box Q34
-Check Heater in Work ES-Q35 80111AG in box Q35
-Check Heater in Work ES-Q38 80111BG in box Q38
-Check Lighting in LCC Panel S01 & S02 Lamp E1& E2
-Check Outlet in LCC Panel Outlet

2 DC Supply (External Supply 220VDC)


220VDC Supply Circuit 11BVC30 11BVC30#7 X1DC:1 - X1DC:3 V
X1DC:1 - Gnd. V
X1DC:3 - Gnd. V
-Indicator & Alarm Circuit -F2
220VDC Supply Circuit 11BVC30 11BVC30#4 X1DC:21 - X1DC:23 V
X1DC:21 - Gnd. V
X1DC:23 - Gnd. V
-Apparatus control and CB Close Circuit Power Supply -F7
220VDC Supply Circuit 11BVC30 11BVC30#8 X1DC:5 - X1DC:7 V
X1DC:5 - Gnd. V
X1DC:7 - Gnd. V
-CB Trip 1 Circuit -F3
220VDC Supply Circuit 11BVC30 11BVC30#6 X1DC:13 - X1DC:15 V
X1DC:13 - Gnd. V
X1DC:15 - Gnd. V `
-Gas monitoring -F5
220VDC Supply Circuit 11BVC30 11BVC30#9 X1DC:9 - X1DC:11 V
X1DC:9 - Gnd. V
X1DC:11 - Gnd. V
-CB Trip 2 Circuit -F4
220VDC Supply Circuit 11BVC30 11BVC30#5 X1DC:17 - X1DC:19 V
X1DC:17 - Gnd. V
X1DC:19 - Gnd. V
-DC/ES Motor Circuit -F6
-CB Motor Ph.A Circuit -F50A
-CB Motor Ph.B Circuit -F50B
-CB Motor Ph.C Circuit -F50C

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date
Page 1 of 1
FIELD INSPECTION AND TEST REPORT

230KV GIS LCC FUNCTION TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:

2. 230KV INDICATION CHECK

NO FUNCTION DESCRIPTION OPERATED BY INDICATOR LAMP RESULT


PASS FAIL
1 Circuit Breaker (-Q50) 80112C Manual Open -H50 G
Manual Close R
2 Disconnecting Switch (-Q28) 80111 Manual Open -H28 G
Manual Close R
3 Earthing Switch (-Q34) 80111CG Manual Open -H34 G
Manual Close R
4 Earthing Switch (-Q35) 80111AG Manual Open -H35 G
Manual Close R
5 Earthing Switch (-Q38) 80111BG Manual Open -H38 G
Manual Close R

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 1 of 1
FIELD INSPECTION AND TEST REPORT

230KV GIS LCC FUNCTION TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:

3. 230KV AUXILIARY CONTACT CHECK

NO FUNCTION DESCRIPTION TERMINAL OPEN RESULT CLOSE RESULT


PASS FAIL PASS FAIL
1 Aux Contact for Circuit Breaker -Q50 (80112C)
-Q50A -S1 Contact a "NO" -X50AA: 8-9
Contact a "NO" -X50AA: 22-23
Contact a "NO" -X50AA: 11-Oct
Contact b "NC" -X50AA: 10-12
Contact b "NC" -X50AA: 24-25
-S2 Contact a "NO" -X50: 100-103
Contact a "NO" -X50: 106-109
Contact a "NO" -X50: 112-115
Contact a "NO" -X50AB: 10-11
Contact b "NC" -X50AB: 8-9
Contact b "NC" -X50AB: 12-Oct
-S3 Contact a "NO" -X50: 118-121
Contact a "NO" -X50: 124-127
Contact a "NO" -X50: 130-133
Contact a "NO" -X50: 136-139
Contact b "NC" -X50: 136-142
Contact b "NC" -X50: 145-148
Contact b "NC" -X50: 151-154
Contact b "NC" -X50: 157-160
-S4 Contact a "NO" -X50: 175-178
Contact a "NO" -X50: 181-184
Contact a "NO" -X50: 187-190
Contact a "NO" -X50: 193-196
Contact b "NC" -X50: 193-199
Contact b "NC" -X50: 163-166
Contact b "NC" -X50: 169-172
Contact b "NC" -X50: 202-205
-SL1 Contact "NO" -X50AA: 15-16
Contact "NC" -X50AA: 13-14
Contact "NC" -X50AA: 17-18
Contact b "NC" -X50: 202-205
-Q50B -S1 Contact a "NO" -X50BA: 8-9
Contact a "NO" -X50BA: 22-23
Contact a "NO" -X50BA: 10-11
Contact b "NC" -X50BA: 10-12
Contact b "NC" -X50BA: 24-25
-S2 Contact a "NO" -X50: 101-104
Contact a "NO" -X50: 107-110
Contact a "NO" -X50: 113-116
Contact a "NO" -X50BB: 10-11
Contact b "NC" -X50BB: 8-9
Contact b "NC" -X50BB: 10-12

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 1 of 9
FIELD INSPECTION AND TEST REPORT

230KV GIS LCC FUNCTION TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:

NO FUNCTION DESCRIPTION TERMINAL OPEN RESULT CLOSE RESULT


PASS FAIL PASS FAIL
-S3 Contact a "NO" -X50: 119-122
Contact a "NO" -X50: 125-128
Contact a "NO" -X50: 131-134
Contact a "NO" -X50: 137-140
Contact b "NC" -X50: 137-143
Contact b "NC" -X50: 146-149
Contact b "NC" -X50: 152-155
Contact b "NC" -X50: 158-161
-S4 Contact a "NO" -X50: 176-179
Contact a "NO" -X50: 182-185
Contact a "NO" -X50: 188-191
Contact a "NO" -X50: 194-197
Contact b "NC" -X50: 164-167
Contact b "NC" -X50: 170-173
Contact b "NC" -X50: 203-206
Contact b "NC" -X50: 194-200
-SL1 Contact "NO" -X50BA: 15-16
Contact "NC" -X50BA: 13-14
Contact "NC" -X50BA: 17-18
Contact b "NC" -X50: 202-205
-Q50C -S1 Contact a "NO" -X50CA: 8-9
Contact a "NO" -X50CA: 22-23
Contact a "NO" -X50CA: 10-11
Contact b "NC" -X50CA: 10-12
Contact b "NC" -X50CA: 24-25
-S2 Contact a "NO" -X50: 102-105
Contact a "NO" -X50: 108-111
Contact a "NO" -X50: 114-117
Contact a "NO" -X50CB: 10-11
Contact b "NC" -X50CB: 8-9
Contact b "NC" -X50CB: 10-12
-S3 Contact a "NO" -X50: 120-123
Contact a "NO" -X50: 126-129
Contact a "NO" -X50: 132-135
Contact a "NO" -X50: 138-141
Contact b "NC" -X50: 138-144
Contact b "NC" -X50: 147-150
Contact b "NC" -X50: 153-156
Contact b "NC" -X50: 159-162
-S4 Contact a "NO" -X50: 177-180
Contact a "NO" -X50: 183-186
Contact a "NO" -X50: 189-192
Contact a "NO" -X50: 195-198
Contact b "NC" -X50: 165-168
Contact b "NC" -X50: 171-174
Contact b "NC" -X50: 204-207
Contact b "NC" -X50: 195-201
Responsibility Tested by Confirm by Witnessed by
Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 2 of 9
FIELD INSPECTION AND TEST REPORT

230KV GIS LCC FUNCTION TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:

NO FUNCTION DESCRIPTION TERMINAL OPEN RESULT CLOSE RESULT


PASS FAIL PASS FAIL
-SL1 Contact "NO" -X50CA: 15-16
Contact "NC" -X50CA: 13-14
Contact "NC" -X50CA: 17-18
Contact b "NC" -X50: 202-205

-K50D1A Contact 1 "NO" ; -K50D1B & -K50D1C = OP. -XSP50: 1-2


Contact 2 "NO" ; -K50D1B & -K50D1C = OP. -XSP50: 3-4
Contact 3 "NO" ; -K50D1B & -K50D1C = OP. -XSP50: 5-6
Contact 4 "NO" ; -K50D1B & -K50D1C = OP. -XSP50: 7-8
Contact 5 "NO" -XSP50: 17-18
Contact 6 "NO" -XSP50: 19-20
Contact 7 "NO" -XSP50: 21-22
Contact 8 "NO" -XSP50: 23-24
-K50DA Contact 1 "NO" ; -K50DB & -K50DC = OP. -X1D:10 ,-K50D:A1
Contact 2 "NO" -X50: 210-211
Contact 3 "NO" ; -K50DB & -K50DC = OP. -X50: 208-209
Contact 4 "NO" (SPARE)
Contact 5 "NO" (SPARE)
Contact 6 "NO" (SPARE)
Contact 7 "NO" (SPARE)
Contact 8 "NO" (SPARE)

-K50D1B Contact 1 "NO" ; -K50D1A & -K50D1C = OP. -XSP50: 1-2


Contact 2 "NO" ; -K50D1A & -K50D1C = OP. -XSP50: 3-4
Contact 3 "NO" ; -K50D1A & -K50D1C = OP. -XSP50: 5-6
Contact 4 "NO" ; -K50D1A & -K50D1C = OP. -XSP50: 7-8
Contact 5 "NO" -XSP50: 25-26
Contact 6 "NO" -XSP50: 27-28
Contact 7 "NO" -XSP50: 29-30
Contact 8 "NO" -XSP50: 31-32

-K50DB Contact 1 "NO" ; -K50DA & -K50DC = OP. -X1D:10 ,-K50D:A1


Contact 2 "NO" -X50: 210-211
Contact 3 "NO" ; -K50DA & -K50DC = OP. -X50: 208-209
Contact 4 "NO" (SPARE)
Contact 5 "NO" (SPARE)
Contact 6 "NO" (SPARE)
Contact 7 "NO" (SPARE)
Contact 8 "NO" (SPARE)

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 3 of 9
FIELD INSPECTION AND TEST REPORT

230KV GIS LCC FUNCTION TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:

NO FUNCTION DESCRIPTION TERMINAL OPEN RESULT CLOSE RESULT


PASS FAIL PASS FAIL
-K50D1C Contact 1 "NO" ; -K50D1A & -K50D1B = OP. -XSP50: 1-2
Contact 2 "NO" ; -K50D1A & -K50D1B = OP. -XSP50: 3-4
Contact 3 "NO" ; -K50D1A & -K50D1B = OP. -XSP50: 5-6
Contact 4 "NO" ; -K50D1A & -K50D1B = OP. -XSP50: 7-8
Contact 5 "NO" -XSP50: 33-34
Contact 6 "NO" -XSP50: 35-36
Contact 7 "NO" -XSP50: 37-38
Contact 8 "NO" -XSP50: 39-40

-K50DC Contact 1 "NO" ; -K50DA & -K50DB = OP. -X1D:10 ,-K50D:A1


Contact 2 "NO" -X50: 210-211
Contact 3 "NO" ; -K50DA & -K50DB = OP. -X50: 208-209
Contact 4 "NO" (SPARE)
Contact 5 "NO" (SPARE)
Contact 6 "NO" (SPARE)
Contact 7 "NO" (SPARE)
Contact 8 "NO" (SPARE)

-K50CA Contact 1 "NO" ; -K50CB & -K50CC = OP. -X1D:10 ,-K50C:A1


Contact 2 "NO" -X50: 212-213
Contact 3 "NO" -X50: 214-215
Contact 4 "NO" (SPARE)
Contact 5 "NO" (SPARE)
Contact 6 "NO" (SPARE)
Contact 7 "NO" (SPARE)
Contact 8 "NO" (SPARE)

-K50C1A Contact 1 "NC" ; -K50C1B & -K50C1C = OP. -XSP50: 9-10


Contact 2 "NC" ; -K50C1B & -K50C1C = OP. -XSP50: 11-12
Contact 3 "NC" ; -K50C1B & -K50C1C = OP. -XSP50: 13-14
Contact 4 "NC" ; -K50C1B & -K50C1C = OP. -XSP50: 15-16
Contact 5 "NC" -XSP50: 41-42
Contact 6 "NC" -XSP50: 43-44
Contact 7 "NC" -XSP50: 45-46
Contact 8 "NC" -XSP50: 47-48

-K50CB Contact 1 "NO" ; -K50CA & -K50CC = OP. -X1D:10 ,-K50C:A1


Contact 2 "NO" -X50: 212-213
Contact 3 "NO" -X50: 214-215
Contact 4 "NO" (SPARE)
Contact 5 "NO" (SPARE)
Contact 6 "NO" (SPARE)
Contact 7 "NO" (SPARE)
Contact 8 "NO" (SPARE)

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 4 of 9
FIELD INSPECTION AND TEST REPORT

230KV GIS LCC FUNCTION TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:

NO FUNCTION DESCRIPTION TERMINAL OPEN RESULT CLOSE RESULT


PASS FAIL PASS FAIL
-K50C1B Contact 1 "NC" ; -K50C1A & -K50C1C = OP. -XSP50: 9-10
Contact 2 "NC" ; -K50C1A & -K50C1C = OP. -XSP50: 11-12
Contact 3 "NC" ; -K50C1A & -K50C1C = OP. -XSP50: 13-14
Contact 4 "NC" ; -K50C1A & -K50C1C = OP. -XSP50: 15-16
Contact 5 "NC" -XSP50: 49-50
Contact 6 "NC" -XSP50: 51-52
Contact 7 "NC" -XSP50: 53-54
Contact 8 "NC" -XSP50: 55-56

-K50CC Contact 1 "NO" ; -K50CA & -K50CB = OP. -X1D:10 ,-K50C:A1


Contact 2 "NO" -X50: 212-213
Contact 3 "NO" -X50: 214-215
Contact 4 "NO" (SPARE)
Contact 5 "NO" (SPARE)
Contact 6 "NO" (SPARE)
Contact 7 "NO" (SPARE)
Contact 8 "NO" (SPARE)

-K50C1C Contact 1 "NC" ; -K50C1A & -K50C1B = OP. -XSP50: 9-10


Contact 2 "NC" ; -K50C1A & -K50C1B = OP. -XSP50: 11-12
Contact 3 "NC" ; -K50C1A & -K50C1B = OP. -XSP50: 13-14
Contact 4 "NC" ; -K50C1A & -K50C1B = OP. -XSP50: 15-16
Contact 5 "NC" -XSP50: 57-58
Contact 6 "NC" -XSP50: 59-60
Contact 7 "NC" -XSP50: 61-62
Contact 8 "NC" -XSP50: 63-64

2 Aux Contact for Disconnecting Switch (-Q28) 80111


-Q28 -S1 Contact ao "NO" -X28A: 7-8
Contact bc "NC" -X28A: 7-10
Contact ac "NO" -X28A: 15-16
Contact bo "NC" -X28A: 15-18
Contact ac "NO" -X28: 11-12
Contact bo "NC" -X28: 11-14
Contact ac "NO" -X28: 19-20
Contact bo "NC" -X28: 19-22
Contact ac "NO" -X28: 9-21
Contact bo "NC" -X28: 13-17
Contact ao* "NO" -X28: 29-30
Contact bo* "NC" -X28: 31-32

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 5 of 9
FIELD INSPECTION AND TEST REPORT

230KV GIS LCC FUNCTION TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:

NO FUNCTION DESCRIPTION TERMINAL OPEN RESULT CLOSE RESULT


PASS FAIL PASS FAIL
-K28C1 Contact 1 "NO" -X28: 33-34
Contact 2 "NO" -X28: 35-36
Contact 3 "NO" -X28: 37-38
Contact 4 "NO" -X28: 39-40
Contact 5 "NC" -X28: 49-50
Contact 6 "NC" -X28: 51-52
Contact 7 "NC" -X28: 53-54
Contact 8 "NC" -X28: 55-56

-K28D1 Contact 1 "NO" -X28: 41-42


Contact 2 "NO" -X28: 43-44
Contact 3 "NO" -X28: 45-46
Contact 4 "NO" -X28: 47-48
Contact 5 "NC" -X28: 57-58
Contact 6 "NC" -X28: 59-60
Contact 7 "NC" -X28: 61-62
Contact 8 "NC" -X28: 63-64

3 Aux Contact for Earthing Switch (-Q34) 80111CG


-Q34 -S1 Contact ao "NO" -X34A: 7-8
Contact bc "NC" -X34A: 7-10
Contact ac "NO" -X34A: 15-16
Contact bo "NC" -X34A: 15-18
Contact ac "NO" -X34: 11-12
Contact bo "NC" -X34: 11-14
Contact ac "NO" -X34: 19-20
Contact bo "NC" -X34: 19-22
Contact ac "NO" -X34: 9-21
Contact bo "NC" -X34: 13-17
Contact ac "NO" -X34: 23-24
Contact bo "NC" -X34: 25-26
Contact ac "NO" -X34: 27-28
Contact bo "NC" -X34: 29-30
Contact bo "NC" -X34: 31-32

-K34C1 Contact 1 "NO" -X34: 33-34


Contact 2 "NO" -X34: 35-36
Contact 3 "NO" -X34: 37-38
Contact 4 "NO" -X34: 39-40
Contact 5 "NC" -X34: 49-50
Contact 6 "NC" -X34: 51-52
Contact 7 "NC" -X34: 53-54
Contact 8 "NC" -X34: 55-56

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 6 of 9
FIELD INSPECTION AND TEST REPORT

230KV GIS LCC FUNCTION TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:

NO FUNCTION DESCRIPTION TERMINAL OPEN RESULT CLOSE RESULT


PASS FAIL PASS FAIL
-K34D1 Contact 1 "NO" -X34: 41-42
Contact 2 "NO" -X34: 43-44
Contact 3 "NO" -X34: 45-46
Contact 4 "NO" -X34: 47-48
Contact 5 "NC" -X34: 57-58
Contact 6 "NC" -X34: 59-60
Contact 7 "NC" -X34: 61-62
Contact 8 "NC" -X34: 63-64

4 Aux Contact for Earthing Switch (-Q35) 80111AG


-Q35 -S1 Contact ao "NO" -X35A: 7-8
Contact bc "NC" -X35A: 7-10
Contact ac "NO" -X35A: 15-16
Contact bo "NC" -X35A: 15-18
Contact ac "NO" -X35: 11-12
Contact bo "NC" -X35: 11-14
Contact ac "NO" -X35: 19-20
Contact bo "NC" -X35: 19-22
Contact ac "NO" -X35: 9-21
Contact bo "NC" -X35: 13-17
Contact ac "NO" -X35: 23-24
Contact bo "NC" -X35: 25-26
Contact ac "NO" -X35: 27-28
Contact bo "NC" -X35: 29-30
Contact bo "NC" -X35: 31-32

-K35C1 Contact 1 "NO" -X35: 33-34


Contact 2 "NO" -X35: 35-36
Contact 3 "NO" -X35: 37-38
Contact 4 "NO" -X35: 39-40
Contact 5 "NC" -X35: 49-50
Contact 6 "NC" -X35: 51-52
Contact 7 "NC" -X35: 53-54
Contact 8 "NC" -X35: 55-56

-K35D1 Contact 1 "NO" -X35: 41-42


Contact 2 "NO" -X35: 43-44
Contact 3 "NO" -X35: 45-46
Contact 4 "NO" -X35: 47-48
Contact 5 "NC" -X35: 57-58
Contact 6 "NC" -X35: 59-60
Contact 7 "NC" -X35: 61-62
Contact 8 "NC" -X35: 63-64

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 7 of 9
FIELD INSPECTION AND TEST REPORT

230KV GIS LCC FUNCTION TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:

NO FUNCTION DESCRIPTION TERMINAL OPEN RESULT CLOSE RESULT


PASS FAIL PASS FAIL
5 Aux Contact for Earthing Switch (-Q38) 80111BG
-Q38 -S1 Contact ao "NO" -X38A: 7-8
Contact bc "NC" -X38A: 7-10
Contact ac "NO" -X38A: 15-16
Contact bo "NC" -X38A: 15-18
Contact ac "NO" -X38: 11-12
Contact bo "NC" -X38: 11-14
Contact ac "NO" -X38: 19-20
Contact bo "NC" -X38: 19-22
Contact ac "NO" -X38: 9-21
Contact bo "NC" -X38: 13-17
Contact ac "NO" -X38: 23-24
Contact bo "NC" -X38: 25-26
Contact ac "NO" -X38: 27-28
Contact bo "NC" -X38: 29-30
Contact bo "NC" -X38: 31-32

-K38C1 Contact 1 "NO" -X38: 33-34


Contact 2 "NO" -X38: 35-36
Contact 3 "NO" -X38: 37-38
Contact 4 "NO" -X38: 39-40
Contact 5 "NC" -X38: 49-50
Contact 6 "NC" -X38: 51-52
Contact 7 "NC" -X38: 53-54
Contact 8 "NC" -X38: 55-56

-K38D1 Contact 1 "NO" -X38: 41-42


Contact 2 "NO" -X38: 43-44
Contact 3 "NO" -X38: 45-46
Contact 4 "NO" -X38: 47-48
Contact 5 "NC" -X38: 57-58
Contact 6 "NC" -X38: 59-60
Contact 7 "NC" -X38: 61-62
Contact 8 "NC" -X38: 63-64

6 Aux Contact for selector switch (S10)


Remote Contact 39-40 "NO" -X1A: 84-85
Contact 27-28 "NO" -X1A: 86-87
Contact 29-30 "NO" -X1A: 88-89
Local Contact 9-10 "NC" -X1A: 94-95
Contact 11-12 "NC" -X1A: 96-97
Contact 3-4 "NC" -X1A: 98-99

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 8 of 9
FIELD INSPECTION AND TEST REPORT

230KV GIS LCC FUNCTION TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:

NO FUNCTION DESCRIPTION TERMINAL OPEN RESULT CLOSE RESULT


PASS FAIL PASS FAIL
7 Aux Contact for selector switch (S12)
Maint. Contact 41-42 "NO" -X1A: 108-109
Contact 43-44 "NO" -X1A: 110-111
Contact 45-46 "NO" -X1A: 112-113
Normal Contact 25-26 "NC" -X1A: 114-115
Contact 27-28 "NC" -X1A: 116-117
Contact 29-30 "NC" -X1A: 118-119
Contact 31-32 "NC" -X1A: 120-121

8 Aux Contact for DC Supply MCB


- F2 Contact 11-12 "NC" -X1A: 74-75
- F3 Contact 11-12 "NC" -X1A: 72-73
- F4 Contact 11-12 "NC" -X1A: 70-71
- F5 Contact 11-12 "NC" -X1A: 76-77
- F6 Contact 11-12 "NC" -X1A: 78-79
- F7 Contact 11-12 "NC" -X1A: 68-69
- F50A Contact 21-22 "NC" -X50: 25-26
- F50B Contact 21-22 "NC" -X50: 27-28
- F50C Contact 21-22 "NC" -X50: 29-30

9 Aux Contact for 125V DC Circuit supply fail


- K1DC Contact 31-32 "NC" -X1A: 50-51
- K2DC Contact 31-32 "NC" -X1A: 52-53
- K3DC Contact 31-32 "NC" -X1A: 54-55
- K4DC Contact 31-32 "NC" -X1A: 56-57
- K5DC Contact 31-32 "NC" -X1A: 58-59
- K6DC Contact 31-32 "NC" -X1A: 60-61
- K7DC Contact 31-32 "NC" -X1A: 62-63

10 Aux Contact for Heating/Lighting Supply Fail


-K1AC Contact 21-22 "NC" -X1A: 64-65
-F10 Contact 21-22 "NC" -X1A: 66-67

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 9 of 9
FIELD INSPECTION AND TEST REPORT

230KV GIS LCC FUNCTION TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:

4. 230KV FUNCTION ALARM CHECK

NO FUNCTION DESCRIPTION OPERATED BY ANNUNCIATOR RESULT


PASS FAIL
-AN1
1 DC Supply T2+/- Fail -K2DC -CH1
2 DC Supply C+/- Fail -K1DC -CH2
3 DC Supply S+/- Fail -K4DC -CH3
4 DC Supply M+/- Fail -K7DC -CH4
5 DC Supply T1+/- Fail -K3DC -CH5
6 CB MOTOR MCB OPEN -F50A, -F50B, -F50C -CH6
7 HEAT./LIGH. SUPPLY FAIL -K1AC, -F10 -CH7
8 DC Supply MS+/- Fail -K6DC -CH8
9 G0 LEVEL 1 -KG0A -CH9
10 G1 LEVEL 1 -KG1A1 -CH10
11 G2 LEVEL 1 -KG2A1 -CH11
12 G4 LEVEL 1 -KG4A1 -CH12
13 G5 LEVEL 1 -KG5A1 -CH13
14 G7 LEVEL 1 -KG7A1 -CH14
15 G9 LEVEL 1 -KG9A1 -CH15
16 G61 LEVEL 1 -KG61A1 -CH16
-AN2
1 PHASE A SF6 FAIL -K1GA -CH17
2 PHASE B SF6 FAIL -K1GB -CH18
3 PHASE C SF6 FAIL -K1GC -CH19
4 CB TRIP -K1CTB -CH20
5 CB PHASE DISCREPANCY -K50X, -K50Y -CH21
6 SYNCHRO RELAY FAIL -F25 -CH22
7 DS/ES/CB INTERMEDIATE POSITION -K2R -CH23
8 ABNOMAL OPERATING TIME -K3ST -CH24
9 G62 LEVEL 1 -KG62A1 -CH25
10 G0 LEVEL 2 -KG0C -CH26
11 G61 LEVEL 2 -KG61A2 -CH27
12 G62 LEVEL 2 -KG62A2 -CH28
13 G1, G2, G4, G5, G7, G9 LEVEL 2 -KG1A2, -KG2A2, -KG4A2, -KG5A2, -KG7A2, -KG9A2 -CH29
14 G1 LEVEL 3 -KG1A3 -CH30
15 G4 LEVEL 3 -KG4A3 -CH31
16 G9 LEVEL 3 -KG9A3 -CH32

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date
Page 1 of 1
FIELD INSPECTION AND TEST REPORT

230KV GIS LCC FUNCTION TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:

5. 230KV GIS FUNCTION CHECK


CB(-Q50) 80112C Normal OPERATED
CONDITION STATUS
NO Lockout Equipment Permissive Permissive Equipment CHECK
S12 S10 -S25BY -S51 Q28 Q38 Q34 Q35 Any Object COMMAND CB 80112C
Relay DETAIL B From GEN From RLY DETAIL A
1 Normal Local On Nomal Not OP On - Close Close - Open - Open S25CO:On S50 Close Not Close
25 Not OP
2 Normal Local On By Pass Not OP On - Close Close - Open - Open - S50 Close Closed
3 Normal Local On Nomal Not OP On - Close Close - Open - Open S25CO:On S50 Close Closed
25 OP, CB Open

4 Normal Remote On By Pass Not OP On - Close Close - Open - Open CB Open S50 Close Not Closed
5 Normal Remote - - Not OP On Open Close Close - Open - Open CB Open Remote C. Not Closed
6 Normal Remote - - Not OP On Close Open Close - Open - Open CB Open Remote C. Not Closed
7 Normal Remote - - Not OP On Open Open Close - Open - Open CB Open Remote C. Not Closed
8 Normal Remote - - Not OP On Close Close Close - Open - Open CB Open Remote C. Closed
9 Normal Remote - - OP On Close Close Close - Open - Open CB Open Remote C. Not Closed
10 Normal Remote - - Not OP Off Close Close Close - Open - Open CB Open Remote C. Not Closed
11 Normal Remote - - Not OP On Close Close Close - Open - Close CB Open Remote C. Not Closed
12 Normal Remote - - Not OP On Close Close Open - Open - Open CB Open Remote C. Not Closed
13 Normal Local - - - On - Close Close - Open Open - CB Open S50 Close Not Closed
14 Normal Local - - - On - Close Open - Close Open - CB Open S50 Close Not Closed
15 Normal Local - - - On - Close Open - Open Close - CB Open S50 Close Not Closed
16 Normal Local - - - On - Close Open - Open Open - CB Open S50 Close Not Closed
17 Normal Local - - - On - Close Close - Close Close - CB Open S50 Close Closed
18 Normal Local - - - Off - Close Close - Close Close - CB Open S50 Close Not Closed
19 Normal Local - - - On - - - - - - - CB Close S50 Open Open TC1,TC2
20 Normal Remote - - - On - - - - - - - CB Close S50 Open Not Open
21 Normal Remote - - - On - - - - - - - CB Close Remote O. Open TC1,TC2
22 Normal Local - - - On - - - - - - - CB Close Remote O. Not Open
22 Normal Local - - - On - - Close - Open Open - CB Close Pri. RLY O. Open TC1,TC2
22 Normal Local - - - On - - Open - Open Open - CB Close Pri. RLY O. Not Open
22 Normal Local - - - On - - Close - Open Open - CB Close BU. RLY O. Open TC1,TC2
22 Normal Local - - - On - - Open - Open Open - CB Close BU. RLY O. Not Open
22 Normal Local - - - On - - Close - Open Open - CB Close Pole Discrepancy Open TC1,TC2
22 Normal Local - - - On - - Open - Open Open - CB Close Pole Discrepancy Not Open

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 1 of 2
FIELD INSPECTION AND TEST REPORT

230KV GIS LCC FUNCTION TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:

CB(Q0A) 80212 MAINTENANCE OPERATED & MAINTENANCE CONDITION


CONDITION STATUS
NO Equipment Permissive CHECK
S12 S10 STC12 S51 Q28 Q38 Q34 Q35 Any Object COMMAND CB 80112C
DETAIL B From Protective RLY
1 Maint Local - 3Ph. On - - - - Close CB Open S50 Close Closed 3Ph.
2 Maint Local - Ph.A On - - - - Close CB Open S50 Close Closed Ph.A
3 Maint Local - Ph.B On - - - - Close CB Open S50 Close Closed Ph.B
4 Maint Local - Ph.C On - - - - Close CB Open S50 Close Closed Ph.C
5 Normal Local TC1 3Ph. On Open - Close Close - CB Close S50 Open Open TC1 3Ph.
6 Normal Local TC1 Ph.A On Open - Close Close - CB Close S50 Open Open TC1 Ph.A
7 Normal Local TC1 Ph.B On Open - Close Close - CB Close S50 Open Open TC1 Ph.B
8 Normal Local TC1 Ph.C On Open - Close Close - CB Close S50 Open Open TC1 Ph.C
9 Normal Local TC2 Ph.A On Open - Close Close - CB Close S50 Open Not Operated
10 Normal Local TC2 Ph.B On Open - Close Close - CB Close S50 Open Not Operated
11 Normal Local TC2 Ph.C On Open - Close Close - CB Close S50 Open Not Operated
12 Maint Local TC1 3Ph. On - - - - - CB Close S50 Open Open TC1 3Ph.
13 Maint Local TC1 Ph.A On - - - - - CB Close S50 Open Open TC1 Ph.A
14 Maint Local TC1 Ph.B On - - - - - CB Close S50 Open Open TC1 Ph.B
15 Maint Local TC1 Ph.C On - - - - - CB Close S50 Open Open TC1 Ph.C
16 Maint Local TC2 3Ph. On - - - - - CB Close S50 Open Open TC2 3Ph.
17 Maint Local - 3Ph. Off - - - - Close CB Open S50 Close Not Closed
18 Maint Local - Ph.A Off - - - - Close CB Open S50 Close Not Closed
19 Maint Local - Ph.B Off - - - - Close CB Open S50 Close Not Closed
20 Maint Local - Ph.C Off - - - - Close CB Open S50 Close Not Closed
21 Maint Local TC1 3Ph. Off - - - - - CB Close S50 Open Not Open
22 Maint Local TC1 Ph.A Off - - - - - CB Close S50 Open Not Open
23 Maint Local TC1 Ph.B Off - - - - - CB Close S50 Open Not Open
24 Maint Local TC1 Ph.C Off - - - - - CB Close S50 Open Not Open
25 Maint Local TC2 3Ph. Off - - - - - CB Close S50 Open Not Open

Equipment DETAIL A
IF(DETAIL A==Close) {ES11BAA30GS600 & ESxx & ESxx & ESxx & ES11BBt10GS600 & ES11BBT10GS601=Close}
IF(DETAIL A==Open) {ES11BAA30GS600 & ESxx & ESxx & ESxx & ES11BBt10GS600 & ES11BBT10GS601=Open}
Equipment DETAIL B
IF(DETAIL B==On) {Spring Charged=ready, Pumping Prev. Reel. Ph.A&Ph.B&Ph.C=ready, SF6 = High}
IF(DETAIL B==Off) {Spring Charged=Not ready, Pumping Prev. Reel. Ph.A&Ph.B&Ph.C= Not ready, SF6 = Low}

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 2 of 2
FIELD INSPECTION AND TEST REPORT

230KV GIS LCC FUNCTION TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:

5. 230KV GIS FUNCTION CHECK


DS(Q28) 80111 OPERATED
NO CONDITION STATUS CHECK
S12 S10 Q38 Q35 Q50 Q34 800411 800411A 800411G 801411 COMMAND Q28 80111
1 Normal Local Close Open Open Open Open Close Open Close S28 Close Not Closed
2 Normal Local Open Closed Open Open Open Close Open Close S28 Close Not Closed
3 Normal Local Open Open Close Open Open Close Open Close S28 Close Not Closed
4 Normal Local Open Open Open Close Open Close Open Close S28 Close Not Closed
5 Normal Local Open Open Open Open Open Close Open Close S28 Close Closed
6 Normal Local - - Close - - - - - S28 Open Not Open
7 Normal Local - - Open - - - - - S28 Open Open
8 Normal Local Close Close Open - - - - - S28 Close Close
9 Normal Local Close Close Close Close - - - - S28 Open Not Open
10 Normal Local Close Close Open Close - - - - S28 Open Open
11 Normal Local Open Open Open Open Close Open Open Close S28 Close Not Closed
12 Normal Local Open Open Open Open Close Open Open Open S28 Close Closed
13 Normal Remote - - Close - - - - - Remote Not Open
14 Normal Remote - - Open - - - - - Remote Open
15 Normal Remote Close Open Open Open Open Close Open Close Remote Not Closed
16 Normal Remote Open Closed Open Open Open Close Open Close Remote Not Closed
17 Normal Remote Open Open Close Open Open Close Open Close Remote Not Closed
18 Normal Remote Open Open Open Close Open Close Open Close Remote Not Closed
19 Normal Remote Open Open Open Open Open Close Open Close Remote Closed
20 Normal Remote - - Open - - - - - Remote Open
21 Normal Remote Open Open Open Open Close Open Open Close Remote Not Closed
22 Normal Remote Open Open Open Open Close Open Open Open Remote Closed
23 Maint Remote - - Open - - - - - Remote Not Open
24 Maint Local - - - - - - - - S28 Open Open
25 Maint Remote - - - - - - - - Remote Not Closed
26 Maint Local - - - - - - - - S28 Close Closed

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 1 of 1
FIELD INSPECTION AND TEST REPORT

230KV GIS LCC FUNCTION TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:

5. 230KV GIS FUNCTION CHECK


ES(Q34) 80111CG OPERATED
NO CONDITION STATUS CHECK
S12 S10 Q28 LINE VT DS89R CB52SST1-1 CB52SST2-1 CB52ET-1 CB11BBT10GT200 CB11BBT10GT201 COMMAND Q34 80111CG
1 Normal Local Close Off Open Not service Not service Not service Not service Not service S34 Close Not Closed
2 Normal Local Open On Open Not service Not service Not service Not service Not service S34 Close Not Closed
3 Normal Local Open Off Close Not service Not service Not service Not service Not service S34 Close Not Closed
4 Normal Local Open Off Close In service Not service Not service Not service Not service S34 Close Not Closed
5 Normal Local Open Off Close Not service In service Not service Not service Not service S34 Close Not Closed
6 Normal Local Open Off Close Not service Not service In service Not service Not service S34 Close Not Closed
7 Normal Local Open Off Close Not service Not service Not service In service Not service S34 Close Not Closed
8 Normal Local Open Off Close Not service Not service Not service Not service In service S34 Close Not Closed
9 Normal Local Close On Close In service In service In service In service In service S34 Close Not Closed
10 Normal Local Open On Open Not service Not service Not service Not service Not service S34 Close Closed
11 Normal Local Close Off Open Not service Not service Not service Not service Not service S34 Open Not Open
12 Normal Local Open On Open Not service Not service Not service Not service Not service S34 Open Not Open
13 Normal Local Open Off Close Not service Not service Not service Not service Not service S34 Open Not Open
14 Normal Local Open Off Close In service Not service Not service Not service Not service S34 Open Not Open
15 Normal Local Open Off Close Not service In service Not service Not service Not service S34 Open Not Open
16 Normal Local Open Off Close Not service Not service In service Not service Not service S34 Open Not Open
17 Normal Local Open Off Close Not service Not service Not service In service Not service S34 Open Not Open
18 Normal Local Open Off Close Not service Not service Not service Not service In service S34 Open Not Open
19 Normal Local Close On Close In service In service In service In service In service S34 Open Not Open
20 Normal Local Open On Open Not service Not service Not service Not service Not service S34 Open Open
21 Maint Local - - - - - - - - S34 Close Closed
22 Maint Local - - - - - - - - S34 Open Open

ES(Q35) 80111AG OPERATED


NO CONDITION STATUS CHECK
S12 S10 Q28 Q50 LINE VT COMMAND Q35 80111AG
1 Normal Local Closed Open ON S35 Closed Not Closed
2 Normal Local Open Closed ON S35 Closed Not Closed
3 Normal Local Closed Closed ON S35 Closed Not Closed
4 Normal Local Open Open ON S35 Closed Closed
5 Normal Local Closed Open ON S35 Open Not Open
6 Normal Local Open Closed ON S35 Open Not Open
7 Normal Local Closed Closed ON S35 Open Not Open
8 Normal Local Open Open ON S35 Open Open
9 Normal Local Closed Open OFF S35 Closed Not Closed
10 Normal Local Open Closed OFF S35 Closed Not Closed
11 Normal Local Closed Closed OFF S35 Closed Not Closed
12 Normal Local Open Open OFF S35 Closed Not Closed
13 Normal Local Closed Open OFF S35 Open Not Open
14 Normal Local Open Closed OFF S35 Open Not Open
15 Normal Local Closed Closed OFF S35 Open Not Open
16 Normal Local Open Open OFF S35 Open Not Open
17 Maint Local - - - S35 Closed Closed
18 Maint Local - - - S35 Open Open

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 1 of 1
FIELD INSPECTION AND TEST REPORT

230KV GIS LCC FUNCTION TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.: 11ADA01
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.:

5. 230KV GIS FUNCTION CHECK


ES(Q38) 80111BG OPERATED
NO CONDITION STATUS CHECK
S12 S10 Q28 800411 800411A 801411 COMMAND Q38 80111BG
1 Normal Local Closed Open Open Open S38 Close Not Closed
2 Normal Local Open Closed Open Open S38 Close Not Closed
3 Normal Local Open Open Closed Open S38 Close Not Closed
3 Normal Local Open Open Open Closed S38 Close Not Closed
3 Normal Local Closed Closed Closed Closed S38 Close Not Closed
4 Normal Local Open Open Open Open S38 Close Closed
5 Normal Local Closed Open Open Open S38 Open Not Open
6 Normal Local Open Closed Open Open S38 Open Not Open
7 Normal Local Open Open Closed Open S38 Open Not Open
8 Normal Local Open Open Open Closed S38 Open Not Open
8 Normal Local Closed Closed Closed Closed S38 Open Not Open
4 Normal Local Open Open Open Open S38 Open Open
9 Maint Local - - - - S38 Close Closed
10 Maint Local - - - - S38 Open Open

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 1 of 1