Professional Documents
Culture Documents
Das Consultants: Design of 1000KL Capacity OHT
Das Consultants: Design of 1000KL Capacity OHT
Das Consultants: Design of 1000KL Capacity OHT
Inclined slab
Inclined slab thickness = Ist 0.25 m
Inclined slab height = Ish 2.25 m 3.182
Angle of inclination = 45 deg 45 deg
Inclined length of the slab = 3.182 m
Staging Details
(Top of footing to c/l of bottom ring
Height of staging = hs 30 m beam)
2
Net SBC of the soil assumed = 8.65 t/m
TANK DETAILS
Capacity of tank = v 1000 kL
Volume calculations
Free board proposed 0.45 m (Proposed)
volume of cylindrical portion πx (td /4)x (swh+trd+mrd)
2
153.939 846.665
(πx ish/12) x (td + ds + td x ds)
2 2
volume of concical portion 256.826
πx (bdh /3)x (3R2 - bdh)
2
deduct for vol. of bott. dome portion 82.729
side wall height (swh) = 5.3 m (between top and middle ring beams)
Total net volume = va 1020.76 kL
Hence the side wall height proposed is adequae
Total dead load due to tank portion up to the bottom ring beam level
= 150.901 x 25 = 3772.53 kN
Load due to water = 1020.76 x 10 = 10207.6 kN
Load due to staging:
Columns = 33 x 10 x 0.283 x 25
= 2334.75 kN
Tie beam =
3.276 x 10 x 8 x 0.135 x 25
= 884.52 kN
Angle between columns = 36 deg
Length of each beam = 3.276 m
STAAD Space frame Analysis has been performed considering the staging and with a rigid link at top.
The diflection of staging for unit horizontal load applied at the top of rigid link is
with 10 kN load 0.00188 m (From STAAD analysis)
The lateral stiffness (ks) = 5307.86 kN/m
(Ah)c = 0.0235
Mi * = 16126 kNm
Similarly Overturming moment in convective mode
Mc* = (Ah)c mc (hc* + hs) g
4110.6 kNm
Staging details
Height of staging above GL = 16 m
Foundation level = 3 m (Below GL)
No. of columns proposed = 6 m
Dia of columns = 0.65 m
No. of bracings = 4 nos.
Spacing of bracings = 4 m
Length of beam in bracings = 3.14 m
Design of raft :
Clear Dia of staging = 10.0 m
Column size = 0.6 m
Effective dia of staging = 10.6 m
Assume projection beyond C/L of column = 3.8
Dia of raft provided d 18.2 m
Overall depth of raft dr 1.200 m
Dia of bottom bars db 20 mm
spacing of bottom bars arranged as mesh space 150 mm 170
Dia of tob bars dbi 20 mm
spacing of top bars arranged as mesh spacei 150 mm
Effective depth provided(de) de 1115 mm
2
moment = coeff. X Pa /100
Radial moment:
Radial moment at shaft = -663.146 + -159.755 = -822.901 kNm
Moment at centre = -67.7313 + 0 = -67.7313 kNm
Circumfrential moment:
Moment at cantileve tip = -203.035 + -25.9156 = -228.95 kNm
Moment at centre = -341.761 + -39.2772 = -381.038 kNm
Circumfrential moment:
Moment at cantileve tip = -343.426 kNm/m
Moment at centre = -571.557 kNm/m
Overall depth provided = 1200 mm
Effective depth = 1200 - 75 - 10
= 1115 mm
2
Mu/bd = 0.993 say 1.00
DAS CONSULTANTS
Civil & Structural Engineers
DOCUMENT NO. DATE
PROJECT NAME: HI-TECH CYCLE VALLEY
1000kl-30m 12-Jun-2019
DESIGN OF TANK
2
Allowable stress in concrete under bending cbc 10 N/mm
2
weight of top dome& finishings (tt x 25 + 0.50) wt 3.625 kN/m
DAS CONSULTANTS
Civil & Structural Engineers
DOCUMENT NO. DATE
PROJECT NAME: HI-TECH CYCLE VALLEY
1000kl-30m 12-Jun-2019
Summary
Top ring beam breadth trb 0.35 m
Top ring beam depth trd 0.35 m
Dia of steel bars trds 16 mm
Number of bars tmb 8 no.s
Area of steel is provided safe astp 1609 mm2
Hoop tension in the top ring beam ht 163.834 kn/m
Tensile stress in the concrete tensile stress with in limits tss 1.206 N/mm2
Privide 2L - Y10 dia stirrups @ 150 mmc/c
Note: Average of 1.00 and 0.9x swh is considered as the maximum design moment
Maximum Design negative moment = 9.945 kNm/m
2
Total Pressure due to hydrodynamic effects = 3.878 kN/m
Summary
Thickness of side wall at top ti 0.2 m
Thickness of side wall at bottom thk is adequate hoop tii 0.2 m
Dia of vertical steel on water face vsd 12 mm
spacing bars wfs 150 mm
Dia of vertical steel on outer face vsdi 12 mm
spacing of bars ofs 150 mm
Dia of hoop steel bars hsd 12 mm
spacing of bars on each face sphs 115 mm
2
vertical steel on water face wsas 754 mm
vertical steel on outer face osas 754 mm2
vertical steel at mid height mhasi 754 mm2
Total hoop steel for two faces has 1968 mm2
Area of hoop steel provided two faces hasp 1968 mm2
2
Hoop tensile stress in concrete tsc 0.691 N/mm
Maximum hoop tension hopt 252.837 kN/m
Maximum moment on water face 9.945 kNm
2
Maximum bending tensile stress in concrete btsc 1.492 N/mm
Depth of middle ring beam tensile stress with in limits Mrd 0.3 m
Breadth of middle ring beam tensile stress is=1.36 Mrb 0.45 m
Balcony with bw 0.35 m
Dia of hoop steel bars provided hsbia 25 mm
Number of hoop bars proided nhb 8 8
2
Area of hoop steel provided hopsp 3926.99 mm
Total hoop tension due to vertical load and water thopt 458.944 kN
Hoop tensile stres in concrete hati 1.36 n/mm2
stirrups provide 2L-Y10mm dia @200 mm c/c
Calculation
Load from top dome = mt x cos(φ) = 23.405 kN/m
Load due to self weight of ring beam = = 3.063 kN/m
Load due to side wall = 26.5 kN/m
Weight of top dome, ring beam, side wall and middle ring beam = 2212.57 kN
Weight of water over inclined shell
Bending (t) stress in the conical shell 6*bms*10^3/(ist*1000)^2 bts 5.762 N/mm2
Hoop tensile stress in the conical shell
2
tcmax*1000/(ist*1000*1000+(m-1)*1000/(hssp)*pi()*(hsdi)^2/4*2) hts 0.42 N/mm
Provide 16 mm dia bars @ 148 mm c/c
however provide @ 125 mm c/c
2
Ast provided= 1609 mm
Design of Staging:
DAS CONSULTANTS
Civil & Structural Engineers
DOCUMENT NO. DATE
PROJECT NAME: HI-TECH CYCLE VALLEY
1000kl-30m 12-Jun-2019