Professional Documents
Culture Documents
REC Quality Monitoring For DDG Projects Under DDUGJY (Mini-Grid)
REC Quality Monitoring For DDG Projects Under DDUGJY (Mini-Grid)
DDUGJY (Mini-Grid)
1. Basic Details:
Parameters Details
Date of Inspection
Date of Inspection
Name of village
Census Code
Name of Block
Name of District
Name of State
1
2. CHECKLIST FOR INSPECTION OF MINIGRID SOLAR POWER PLANT SYSTEM
UoM/
Sl.
Item/Parameter Response Response
No.
Type
DC Side of Mini Grid
1 Is solar system working? Yes/No
2 If not working, since when? _Months
3 Comments (If not working)
4 If working, number of supply hours per day _Hours
5 Per day generation (Average) _Unit
6 Total no. of Solar Modules Nos
7 Capacity of each Solar Module Wp
8 Total capacity Wp
8 Name of Manufacturer of Solar Module Name
9 Photograph of name plate of module (1 sample) Photograph
Whether any snail trails/cracks can be observed on solar
Yes/No
10 cells?
11 Sample photograph of cell cracks/snail trails Photograph
Whether panels/modules in clean condition at time of
Yes/No
12 inspection?
13 Whether panels/modules are easily accessible for cleaning? Yes/No
14 Photograph of the dirty modules (For cleanliness aspect) Photograph
Photograph of any major shadow on the modules at the time
Photograph
15 of inspection
16 Check direction of panel (write correct direction)
17 Provision of movement of panel Yes/No
18 Photograph of steel structure holding solar panel Photograph
Photographs of cable termination and inside of the junction
Photograph
19 box.
Photograph of cable route between panel and inverter/battery
Photograph
20 showing dressing of cable with structure.
Check foundation of steel structure as per approved drawing.
Yes/NO
21 Describe discrepancy if any
2
UoM/
Sl.
Item/Parameter Response Response
No.
Type
cables in the tray, Cable laid on pipe/batton wiring
3
UoM/
Sl.
Item/Parameter Response Response
No.
Type
Whether Proper phase to phase clearances are maintained on
Yes/No
57 the line?
58 No. of Poles installed Nos
59 Whether proper binding of cable/conductor to the insulators? Yes/No
60 Total length of LT conductor/Cable Kms
Painting of pole to be checked. Comment on its
Photograph
61 painting/galvanisation
Check cement concrete foundation of poles. Check it with
reference to approved drawing. Dig-out one sample Yes/No
62 foundation at one of the four sides and check concreting.
Line is passing through water logging area and its foundation
Yes/No
63 is not grouted in cement concrete
64 Verticality of poles is not proper (Tilting of poles) Photograph
65 Proper painting/galvanizing is not done on steel structure Photograph
Households(HHs) Connection
66 How many connection are provided in the village? Nos
67 Whether each Household is metered? Yes/No
68 Whether each household’s meter is earthed properly? Yes/No
69 Whether Proper home wiring is done for each Household? Yes/No
If “No” for above points then no. of HHs where
Nos
70 connections/earthing/metering not done properly
Size of service cable is 2.5/4.0 mm2 twin core (unarmoured)
Yes/No
71 PVC insulated cables with aluminium conductors
4
UoM/
Sl.
Item/Parameter Response Response
No.
Type
beneficiaries
Whether any customer care number has been provided to
beneficiary for complaint registration, if yes provide the Yes/No
84 contact number.
85 No. of HHs not getting electricity due to system failure Nos
86 Date of installation Date
87 Date of commissioning Date
88 No. of Street lights installed Nos
89 Whether installation of Street lights are proper Yes/No
90 Photograph of the complete structure of street light Photograph
91 Whether all street lights are glowing/working properly Yes/No
Take Copy of design calculation of capacity of battery bank
Yes/No
92 and panel.
If it is “No” for above parameter then no. of Street lights not
Nos
93 working
5
3. CUSTOMER FEEDBACK
6
Check list for Documents at Project Implementing Agency level:
a) Solar panel
b) Battery
c) Invertor
d) Pole
e) Conductor/cable
f) Energy meter
Check remote monitoring mechanism of mini grid operation like daily generation, utilisation
and storage of power.
Check construction of control room-roof, flooring, wall finish, windows, and door.
Record room dimension.
Check and record sign board.
Check and record regular operation & maintenance mechanism established by Project
developer. Submit report