Site Requirement (Version 1)
Site Requirement (Version 1)
Site Requirement (Version 1)
Power Reticulation
1 Eletrical cable around Hoarding to supply DB board
2 DB board ( Box )
3 Breakers for DB board
4 Sockets per DB board
5 Preparing DB board
6 Connection fittings
7 Installation Cable & Db board alongside Hoarding
8 Cable for crane connection ( 2nos )
9 Cable for connecting site establishment
10 Power to Gate post
11 Light& sockets inside Gate Post
12 Fog light to entrance at Gate Post ( 5nos )
13 Fog lights around establishment ( 5nos )
14 Materials for extension cable
15 Preparing of extension cable
16 Earth Rods
Water Reticulatiuon
1 Polypipe 20mm TBC
2 Conncetors
3 Taps
4 Valve along side reticulation
5 Pump for reticulation
6 Pump for site Establishment
7 Water connection to Wheel wash
8 Power jet for wheel wash
9 Connection of power & water for wheel wash
10 Horse for each zone
Connections fitings Start Date Completion Date Remarks
TBC
14
On site and as per drawing
32 monophase missing
1 complete board missing with breakers
TBA
TBA
Cables to be procured
okay
okay
okay
1
6
Okay
Okay
14 Numbers
15 Waterpoints
TBA by Anand
15 Taps
TBA by Anand
TBA by Anand
TBA by Anand
TBA by Anand
TBA by Anand
TBA by Anand
Planned Date
14 triphase missing
22.06.2019
12.07.2019
22.06.2019