Professional Documents
Culture Documents
Hitung Flexibel Pavement No.5
Hitung Flexibel Pavement No.5
Hitung Flexibel Pavement No.5
1. Rumus Δ PSI
log10
4,2 - 1,5
Log10W18 = ZR*S0 + 9.36*log10(SN+1) - 0.20 + + 2.32*log10MR - 8.07
1094
0,4 +
(SN+1)5.19
2. Data Masukan
W18 = 49.78 x 10^ 6 Δ PSI = IP0 - IPt = 4.60 - 3.00 = 1.60
R = 95 % --> ZR = -1.645 Subgrade CBR = 6.8 %
S0 = 0.45 MR = 1,680.7598*(CBR)^0.747564
IP0 = 4.60 = 1,680.7598 x 6.8 ^ 0.74756
IPt = 3.00 = 7,045 psi
Ruas kanan dengan mengisi nilai SN sehingga hasilnya sama dengan ruas kiri
SN = 6.728 inches = 17.09 cm
maka: 1.60
log10
4,2 - 1,5
-1.645 x 0.45 + 9.36 x log10(SN+1) - 0.20 + + 2.32 x log10( 7,045 ) - 8.07 = 7.697 @ 7.697
1094
0,4 +
(SN+1)5.19
file:///conversion/tmp/scratch/427497213.xls
5. Penentuan Tebal Lapisan
17.09 = 0.42 x 4 + 0.40 x 6 x 1.0 + 0.38 x 6 x 1.0 + 0.14 x 25 x 1.0 + 0.11 x D5 x 1.0
4 cm AC-WC
6 cm AC-BC
6 cm ATB
25 cm Batu pecah
111 cm
70 cm Sirtu
7 %
Subgrade CBR
file:///conversion/tmp/scratch/427497213.xls
file:///conversion/tmp/scratch/427497213.xls
No. 3 Menghitung tebal perkerasan lentur masing-masing lapisan dengan Metoda AASHTO 1993
1. Rumus Δ PSI
log10
4,2 - 1,5
Log10W18 = ZR*S0 + 9.36*log10(SN+1) - 0.20 + + 2.32*log10MR - 8.07
1094
0,4 +
(SN+1)5.19
2. Data Masukan
W18 = 30.00 x 10^ 6 Δ PSI = IP0 - IPt = 4.60 - 3.00 = 1.60
R = 95 % --> ZR = -1.645 MR = 6,000 psi
S0 = 0.45
IP0 = 4.60
IPt = 3.00
Ruas kanan dengan mengisi nilai SN sehingga hasilnya sama dengan ruas kiri
SN = 6.613 inches = 16.80 cm
maka: 1.60
log10
4,2 - 1,5
-1.645 x 0.45 + 9.36 x log10(SN+1) - 0.20 + + 2.32 x log10( 6,000 ) - 8.07 = 7.477 @ 7.477
1094
0,4 +
(SN+1)5.19
5. Penentuan Tebal Lapisan
10 cm Laston
30 cm Base A
85 cm
45 cm SBase B
0 %
Subgrade CBR
Table 4.1. Standard Normal Deviate (ZR) Values