Session Plan: Upon Completion of This Module The Trainee Must Be Able To

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

SESSION PLAN

Sector : Information and Communications Technology


Qualification Title : COMPUTER SYSTEMS SERVICING NC II
Unit of Competency : INSTALL AND CONFIGURE COMPUTER SYSTEMS
Module Title : Installing and Configuring Computer Systems
Learning Outcomes:
Upon completion of this module the trainee must be able to:
1. Assemble computer hardware
2. Prepare installer
3. Install operating system and drivers for peripherals/ devices
4. Install application software
5. Conduct testing and documentation

A. INTRODUCTION

This module is designed to enhance the knowledge, skills and attitude of the trainees in Installing and Configuring Computer Systems.
After the session the trainee is expected to be competent and will receive a Certificate of Achievement (COA) upon completion.

B. LEARNING ACTIVITIES
LO1. Assemble computer hardware –WEEK 1
Learning Content Methods Presentation Practice Feedback Resources Time
Read Information Sheet 1.1-1
OHS Lecture / Modular 1 Hr.
OHS Written work Compare your answer to
Read information Sheet 1.1-2 1.1-1 Answer Key 1.1-1 CBLM
Hand Tools and
PPE’s Lecture / Modular Hand Tools and
1 Hr.
PPE’s
Written work
Read information Sheet 1.1-5
Compare your answer to
Lecture / Modular Procedure on Assembly and dis 1.1-2 CBLM
Answer Key 1.1-2
assembly of Computer system
Computer
Assembly and 2 Hrs.
Performance Task Hand Tools
Disassembly Job Sheet 1.1-1 Assemble
Perform Job Evaluation Checklist
Demonstration Disassemble Computer and Computer Set.
Sheet 1.1-1
Inventory 1.1-1 PPE’s

LO2. Prepare installer - WEEK 2


Learning Content Methods Presentation Practice Feedback Resources Time
USB bootable Read Information Sheet 1.2-1 Written work Compare your answer to
Device Lecture/ Modular Prepare USB Installer using DOS
Answer Key 1.2-1
CBLM
and Rufus 1.2-1
2 hr.
Performance Task
Task Sheet 1.2-1 Perform Task Checklist Computer
Demonstration Sheet 1.2-1
Create Bootable USB Flash Drive
1.2-1

LO3. Install operating system and drivers for peripherals/ devices

Read Information Sheet 1.3-1 Install


Written work Compare your answer to 1 hr.
Lecture/ Modular CBLM
Operating System 1.3-1 Answer Key 1.3-1

Performance Task 1 hr.


Task Sheet 1.3-1 Perform Task Checklist Computer
Demonstration Sheet 1.3-1 Flash Drive
Install Win 7 1.3-1
Install Operating
System Performance Task 1 hr.
Task Sheet 1.3-2 Perform Task Checklist Computer
Demonstration Sheet 1.3-2 Flash Drive
Install Win Server 2008 R2 1.3-2
Performance Task 1 hr.
Task Sheet 1.3-3 Perform Task Checklist Computer
Demonstration
Sheet 1.3-3 Flash Drive
Install Ubuntu Alongside win 7 1.3-3

Performance Task 1 hr.


Task Sheet 1.3-4 Perform Task Checklist Computer
Demonstration
Sheet 1.3-4 Flash Drive
Install Linux 1.3-4
LO4. Install application software - WEEK 3

Written work Compare your answer to


Lecture/ Modular Read Information Sheet 1.4-1 Anti- CBLM 1 hr.
virus, Drivers, MS Office 1.4-1 Answer Key 1.4-1

1 hr.
Job Sheet 1.4-1 Performance Task
Perform Job Checklist Installers
Demonstration Anti-virus, Drivers, MS Office Sheet 1.4-1 Computers
Application software 1.4-1
and driverss
LO5. Conduct testing and documentation
1. Devices / systems and/or installation is tested to determine whether it conforms to requirements
2. Stress test is conducted to ensure reliability of equipment in accordance with manufacturer’s instructions and system requirements
3. 5S and 3Rs are followed according to environmental policies
4. Documentation in relation to the test is forwarded to appropriate personnel and/or authority in accordance with requirements
C. ASSESSMENT PLAN
 Written Test
 Practical Demonstration
 Fortpolio
 Oral Questioning
 Interview
As each of the above activity is completed, the student will document the action performed (in writing, on tape, or in trainee record book/ journal) for assessment
purposes.

D. TEACHER’S SELF-REFLECTION OF THE SESSION

You might also like