Lab Format Nagi Builder
Lab Format Nagi Builder
300 DISTRICT
PROJECT NAME
JHAJJAR (PACKAGE NO ………………………)
Haryana State Road And Bridge Development Corporation Ltd.
LL %
PL %
PI %
Specified Limits
Remarks
LL %
PL %
PI %
Specified Limits
Remarks
Weight of material %
IS sieve % Cumulative %
retained Weight
(mm) weight retained Passing
(gms) retained
4.75
2.00
0.425
0.075
Soil Classification
( Vd - Vk )
Free Swell Index = x100%
Vk
5
6
FOUR LANING JHAJJAR TO FARUKHNAGAR KM 000 TO 21.300 DISTRICT
PROJECT NAME
JHAJJAR (PACKAGE NO ………………………)
Haryana State Road And Bridge Development Corporation Ltd.
CLIENT Haryana State Road And Bridge Development Corporation Ltd.
Consultant M/S L.N. MALVIYA INFRA PROJECT PVT. LTD.
Contractor M/S NAGI BUILDER PVT. LTD.
b=Wb/ γs
Volume of materials γ
gm/cc
Wet Density wd ₌
Ww / Y b
d/ (1+
Field Dry Density r γ d = w
W/100 )
% of Compaction obtained
Required Compaction:
Remarks :
Consultant Rep.
Contractor Rep.
7
FIELD DRY DENSITY (SAND REPLACEMENT METHOD)
IS: 2720 (Part 28)1974
8
FOUR LANING JHAJJAR TO FARUKHNAGAR KM 000 TO 21.300 DISTRICT
PROJECT NAME
JHAJJAR (PACKAGE NO ………………………)
9
(IS: 383-1970)
FOUR LANING JHAJJAR TO FARUKHNAGAR KM 000 TO 21.300 DISTRICT
PROJECT NAME
JHAJJAR (PACKAGE NO ………………………)
Haryana State Road And Bridge Development Corporation Ltd.
Location : Sampled By : :
12.5 … … 100
2.36 .. .. 0—5
Pan .. .. ..
Remarks :
10
Contractor Rep. Consultant Rep.
Location : Date :
Ingredients ( per m3 )
Cement---------------------- Quantity--------------------------------------
W/C Ratio------------------
Remarks :
11
Contractor Rep. Consultant Rep.
Average. %
Remarks :
12
Contractor Rep. Consultant Rep.
Avg.
SL. Cube Weight Density Load Strength
Strength Remarks
No No. (gms) (gm/cc) (KN) (N/mm2)
(N/mm2)
1
8
9
10
13
11
12
Sample No. :
Date of Sampling :
Source : Sampled By :
14
Specific gravity on oven dried basis C/(B-A) -
Source : Sampled By :
15
Weight of pycnometer filled with sample
gms
and filled with distilled water ( B)
Remarks:
FINENESS OF CEMENT
(IS:4031-Part I)
16
Cement Grade : Sampled By :
Remarks:
17
Contractor M/S NAGI BUILDER PVT. LTD.
CONSISTENCY OF CEMENT
INITIAL & FINAL SETTING TIME
Weight of %of Water Volume of Needle Penetration
Sr. No. Total Time
Cement (gm) Taken Water(ml) (mm)
Note : % of Water Taken for Initial & Final Setting Time = P*0.85 , P= Consistency of Cement
Description Unit Result Specification Limit
Final Setting Time : Time at which the needle makes an impression on the test block while
attachment fails to do so after adding of water to cement
18
FOUR LANING JHAJJAR TO FARUKHNAGAR KM 000 TO 21.300 DISTRICT
PROJECT NAME
JHAJJAR (PACKAGE NO ………………………)
Date of
Sample No. : :
Sampling
Date of
Source : :
Testing
Location : Tested By :
26.5 55 75
4.75 10 30
0.075 0 10
Remarks :
19
SIEVE ANALYSIS OF WET MIX MACADAM
MORT&H TABLE 400-11
Sample Date of
: :
No. Sampling
Date of
Source : :
Testing
Location : Tested By :
Weight of
Layer : :
sample (gms)
Weight of % Specified Limits
IS Sieve material % Weight Cumulative
% Passing
(mm) retained retained weight
Lower Upper
(gms) retained
45.00 95 100
22.40 60 80
11.20 40 60
4.75 25 40
2.36 15 30
0.600 8 22
20
0.075 0 8
Remarks :
21