Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 5

DAEJOO

MAINT
DAEJOO INDIA
MAC

CHECKING
S.NO CHECKING POINTS METHOD
PERIOD

1 CHECK MAIN AIR PRESSURE REFER GUAGE


2 CHECK BALANCE CYL AIR PRESSURE REFER GUAGE
3 CHECK CLUTCH-BRAKE AIR PRESSURE REFER GUAGE
4 CHECK SLIDE FOR LUBRICATION VISUAL & MANUAL
DAILY
5 CHECK ANY AIR LEAKAGE IN MACHINE & IN MAIN LINE OBSERVATION
6 CHECK THE FUNCTION OF SAFETY SENSOR VISUAL
7 CHECK FLY WHEEL DIRECTION VISUAL
8 CHECK BOTH HAND SWITCH FUNCTIONING OPERATION
9 CHECK HYDRAULIC OVERLOAD OIL LEVEL VISUAL
10 CHECK OIL LEVEL IN HYDRAULIC CLAMPING UNIT VISUAL
11 WEEKLY CHECK OIL LEVEL IN CRANK OPERATION
12 CHECK ALL EMERGENCY SWITCH VISUAL
13 CHECK ANY OIL OR GREASE LEAKAGE IN MACHINE AREA VISUAL
14 2CHECK 3CONTROLLER AND4 TRANSMITTER CONDITION
6 7 VISUAL
1 5
15 CHECK ALL PUSH BUTTON LED CONDITION'S OPERATION
16 MONTHLY CHECK CLUTCH BRAKE SOLINOID VALVE VISUAL
17 CHECK MOTOR BELT TENSION VISUAL
18 CHECK MAIN MOTOR NOISE LEVEL OBSERVATION
CHECK POINT PHOTOS
DAEJOO AUTOMOTIVE INDIA
MAINTENANCE DEPARTMENT
MACHINE DAILY CHECK SHEET

Jan-11
STANDARD I st WEEK II nd WEEK III rd WEEK
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
3.5 - 5.0 Kg/Cm 2

4.0 - 4.5 Kg/Cm2

2.9 - 4.3 Kg/Cm2


LUB OIL SPILLAGE
NO LEAKAGE
FUNCTIONING OK
ANTI CLOCK WISE DIRECTION
FUNCTIONING OK
OVER THE LOW LIMIT
OVER THE LOW LIMIT
FUNCTIONING OK
OVER THE LOW LIMIT
IF FOUND CLEAN
FUNCTIONING
8 OK 9 10
FUNCTIONING OK
FUNCTIONING OK
FUNCTIONING OK
NO ABNORMAL SOUND
Jan-11
III rd WEEK IV th WEEK V th WEEK
18 19 20 21 22 23 24 25 26 27 28 29 30 31

11 12
12

12
12

You might also like