BAGH RING ROAD PROJECT

CALCULATION OF SOIL SPRINGS:-


Pile dia. 0.76 meter
N-N depth 1 meter

Depth (m) Kh Kv Ktip Kh Kv Ktip Kh Kv Ktip Kv + Ktip


Below (KN/m3) (KN/m3) (KN/m3) (KN/m) (KN/m) (KN/m) (T/m) (T/m) (T/m) (T/m)
Scour
1
2 9,000 0 - 6,840.00 0.00 - 697.25 0.00 0 0.00
3 14,000 0 - 10,640.00 0.00 - 1,084.61 0.00 0 0.00
4 18,500 0 - 14,060.00 0.00 - 1,433.23 0.00 0 0.00
5 23,500 0 - 17,860.00 0.00 - 1,820.59 0.00 0 0.00
6 28,000 0 - 21,280.00 0.00 - 2,169.22 0.00 0 0.00
7 33,000 0 - 25,080.00 0.00 - 2,556.57 0.00 0 0.00
8 37,500 0 - 28,500.00 0.00 - 2,905.20 0.00 0 0.00
9 42,500 0 - 32,300.00 0.00 - 3,292.56 0.00 0 0.00
10 47,000 30,000 - 35,720.00 71,628.48 - 3,641.18 7,301.58 0 7,301.58
11 52,000 30,000 - 39,520.00 71,628.48 - 4,028.54 7,301.58 0 7,301.58
12 56,500 30,000 - 42,940.00 71,628.48 - 4,377.17 7,301.58 0 7,301.58
13 61,500 40,000 - 46,740.00 95,504.64 - 4,764.53 9,735.44 0 9,735.44
14 66,000 40,000 - 50,160.00 95,504.64 - 5,113.15 9,735.44 0 9,735.44
15 71,000 40,000 - 53,960.00 95,504.64 - 5,500.51 9,735.44 0 9,735.44
16 75,000 50,000 - 57,000.00 119,380.80 - 5,810.40 12,169.30 0 12,169.30
17 80,000 50,000 - 60,800.00 119,380.80 - 6,197.76 12,169.30 0 12,169.30
18 85,000 50,000 - 64,600.00 119,380.80 - 6,585.12 12,169.30 0 12,169.30
19 89,000 50,000 - 67,640.00 119,380.80 - 6,895.01 12,169.30 0 12,169.30
20 95,000 60,000 - 72,200.00 143,256.96 - 7,359.84 14,603.16 0 14,603.16
21 99,000 60,000 - 75,240.00 143,256.96 - 7,669.72 14,603.16 0 14,603.16
22 104,000 60,000 - 79,040.00 143,256.96 - 8,057.08 14,603.16 0 14,603.16
23 108,000 60,000 - 82,080.00 143,256.96 - 8,366.97 14,603.16 0 14,603.16
24 113,500 60,000 - 86,260.00 143,256.96 - 8,793.07 14,603.16 0 14,603.16
25 123,500 60,000 93,860.00 143,256.96 - 9,567.79 14,603.16 0 14,603.16
26 128,000 60,000 0 97,280.00 143,256.96 0.00 9,916.41 14,603.16 0 14,603.16