Professional Documents
Culture Documents
Action Plan Duchessa 18-0003
Action Plan Duchessa 18-0003
Sr. no
Description PIC
1 Propose modification in DOCMAP C/E
Tech Supt /
3 Supply of material Purchaser
4 Approval from Class for proposed modification Tech Supt
5 Modification as per class approved drawings Tech Supt/CE
Modified system verification as per proposed drawing with Tech Supt to liase
6 class and endorsement. with Class
Training of on board staff for operation & Maintenance of
6 Chief Engineer
the system
7 Update drwgs & instruction manual on board C/E
Estimated completion
date date completion
10-Aug-18
15-Sep-18
30-Sep-18
15-Oct-18
31-Oct-18
10-Nov-18
15-Nov-18
15-Nov-18
20-Nov-18