Water Supply Projects II. Environmental Impact and Management Plan Monitoring Parameters/ Implementation Remarks
Water Supply Projects II. Environmental Impact and Management Plan Monitoring Parameters/ Implementation Remarks
Grassland
Limit land clearing as
Mangrove much as possible
Wetland Provide temporary
Others, specify fencing for vegetation
that will be retained
Promote restoration of
damaged or destroyed
vegetation where possible
(e.g., tree planting)
Yes
No
Implement proper
collection, labeling and
storage of hazardous
waste
Provide receptacles / bins
for solid wastes
WATER
Competition in Size of population using Implement rainwater Regular monitoring for
presence/absence of
water use receiving surface water: harvesting and similar
complaints
Depletion of water measures as an alternative
resources ≤ 1,000 persons source of water Regular coordination
>1,000 and ≤ 5,000 Observe water with concerned agencies
persons conservation Regular monitoring for
measures; occurrences of water
>5,000 persons Careful selection of project shortages
Available/nearest water
source.
site to avoid disruption of Others, specify
traditional water uses
Deep well Obtain Water Permit from
Water district/LGU NWRB
Surface water Improve efficiency of water
Others, specify supply and distribution
system
Implement community
ponds and similar
measures as alternative
water source for non-
domestic uses
Possible Monitoring Parameters/
Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation REMARKS
Impacts
Cost of preventive/mitigating as well as monitoring integrated in the construction
/operation cost
Increase, when practical,
storage capacities of water
supply structures
for resilience to
greater climate
variations and
extremes
Others, specify
Increased Is the project site located in an Use appropriate design Regular monitoring for
occurrence of Area identified by MGB/PAG- for project facilities presence/absence of
flooding ASA as flood prone? Implement appropriate complaints
drainage system Regular coordination
Yes Regularly remove debris with concerned agencies
No and other materials that Regular monitoring for
may obstruct water flow increased frequency of
Use appropriate flooding
technology (e.g., raised Others, specify
hand-pumps) to protect
drinking water from flood
contamination
Others, specify
Possible Monitoring Parameters/
Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation REMARKS
Impacts
Cost of preventive/mitigating as well as monitoring integrated in the construction
/operation cost
AIR / NOISE
Air quality degradation Distance to nearest Properly operate and Regular monitoring for
community: maintain all emission presence/absence of
sources (e.g. vehicles, complaints
0 to less than 0.5 km pumps, generator, etc)
0.5 to 1 km Install, when Regular (ocular) inspection of:
More than 1 km
applicable, the
appropriate air pollution
Absence of white or black
smoke from vehicles,
control device/s generator, etc.
Strictly enforce good Presence of truck cover
housekeeping practices during
Control vehicle speed deliveries
to lessen suspension of
road dust
Conduct water
spraying to suppress
dust sources and
minimize discomfort to
nearby residents
Use covered vehicles to
deliver materials that
may generate dust
Others, Specify
Nuisance due to Distance to nearest Properly operate and Regular monitoring for
noise generation community: maintain all noise presence/absence of
sources (e.g., vehicles, complaints
0 to less than 0.5 km pumps, generator, etc.)
Regular monitoring of
0.5 to 1 km Install, when applicable, buffer zones
the appropriate noise
More than 1 km control device/s
Possible Monitoring Parameters/
Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation REMARKS
Impacts
Cost of preventive/mitigating as well as monitoring integrated in the construction
/operation cost
(e.g., mufflers,
silencer, sound
barriers, etc.)
Implement appropriate
operating hours
Provide adequate
buffer and/or planting
trees
Others, specify
PEOPLE
Displacement of Size of population of host Provide Regular monitoring for
residents in the barangay: relocation/disturbance presence/absence of
project site and compensation packages complaints
≤ 1,000 persons
within its vicinity
>1,000 and ≤ 5,000
Prioritize local residents for Regular coordination with
Displacement of employment LGU
Indigenous Peoples persons
Promptly pay local taxes and
Enhanced employment >5,000 persons other financial obligations Others, specify
and/or livelihood Regular coordination with
opportunities Classification of host LGU
Reduced employment barangay:
Conduct prior consultation
and/or livelihood
and coordination to minimize
opportunities
Urban disruption of daily domestic
Increased revenues for
Rural activities and to ensure
LGU
respect for IP rights and
Disruption/ Available services within/near cultural practices
Competition in
delivery of public
the host barangay: Ensure participation of IPs in
services (e.g., Schools (e.g., consultations and dialogues
education, peace elementary, high Provide appropriate
school, college) traffic/warning signs, lighting,
Possible Monitoring Parameters/
Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation REMARKS
Impacts
Cost of preventive/mitigating as well as monitoring integrated in the construction
/operation cost
and order, etc.) Health facilities (e.g., etc.
Enhanced delivery of clinics, hospitals, etc.) Others, specify
public services (e.g.,
education, peace and
Peace and order (e.g.,
police outpost, Brgy. Tanod,
order, etc.) etc.)
Increase in traffic Recreation and sports
volume and facilities
worsening of traffic
flow Others, specify