Presently working as a Junior Expert Engineer (NF-09) on CONTRACT NO.

ADB-65 (R)-2012
Procurement of Plant: Design, Supply, Installation, Testing & Commissioning of 500kV
Transmission Line 3rd Circuit Jamshoro-Moro-Dadu to Rahim Yar Khan (Job # 3206).

Working as a team lead in LOT-II: Moro-Goth Qazi Maher Section (232km).Responsible for erection
and inspection of towers (General check of tower material concerning tightening, position and
placement of braces, fillers). Also responsible for construction activities of all types of Conventional,
Pile and Pile cap foundations.
Responsible for all Erection activities such as assembly, erection, tightening, torque inspection,
Welding inspection and punching inspection of all types of towers according to approved drawings
and specifications.
Responsible for planning and supervision of stringing activities and quality assurance in its
accomplishment like number and position of spacers and dampers, installation of shield wire , OPGW,
amour rod, mid span-joint, arcing horn, corona rings, jumper terminal and use of insulators etc as
per design.
Keeping and maintaining Daily/Monthly progress reports, progress chart, construction foundation
pouring forms of Conventional/Pile/Pile cap foundations, checking of contractor’s monthly invoices
While each deliverable is being constructed, a group of management processes(Quality,
Time, risk, issue and communication management) are carried out to monitor and control
activities have been part of my daily job responsibilities.

Providing Assistance to Camp Incharge


and Deputy Project Manager regarding site activities in LOT-II.

Such mechanism should be devised in organization that all engineers may have a chance to be part of necessary
trainings as I am doing research in MS on Project safety keeping the case study of aforementioned project. I would
like to continue my responsibilities at transmission line, power plan/substation. I can perform better in the
capacity of both, project management group and site engineer.