Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

APPLICATION FOR DEMAND OF WATER FOR INDUSTRIAL USE FROM

GWIL/SSNNL/WATER RESOURCES DEPARTMENT

1. Name of the applicant, address and e-mail ID


2. Name of the industry
3. Location of the industry
a. Survey No.
b. Taluka
c. District
d. Village
4. Letter of approval for industry from Department of Industries (Please attach a copy)
5. Daily requirement of water (cubic meter/liter)
a. For industrial purpose
b. For drinking purpose
6. Documents supporting water requirement (Please attach a copy)
7. Details of the present source from which industry is taking water (including well, bore ground
water)
a. Approved quantity in m3 / day (please attach copy of order)
b. Date of execution of agreement
c. Quantity of water drawn in m3 / day (average)
d. Details of outstanding recovery (INR)
1. Principal
2. Penalty
3. Delay payment charges
4. Total
8. Location from which industry is planning to take water
a. Name of source and its location
b. Village/ taluka / district
9. Acceptance of rate of payment and other terms and conditions (as approved by the Dept. /
Govt. of Gujarat time to time)
10. Details of storage capacity for 30 days of water requirement
11. Whether industry has asked for the permission of water for the present project. If yes, please
mention details. (Please furnish details of other division, circle under SSNNL/GWIL/Irrigation
department)
a. If industry has got permission with other name, (please attach copy)
b. If the permission is cancelled, then give details (please attach copy)
c. If any court case filed with SSNNL/GWIL/Water Resources Dept. or other authority
regarding recovery of water charges (Please attach copy)
Information and application for Water Supply Connection to
Industries through Investment Facilitation Portal
Checklist & Timeline
Application for Water Connection

Time line: 60 days from the date of application


Required documents:
A: For Industrial Use of water
1. Application in prescribed the format
(Website: http://guj-nwrws.gujarat.gov.in/forms/ApplicationForm01.aspx )
2. Approval from Industries Commissioner
3. Copy of’ Memorandum of Articles and Association ‘of the Applicant
(Industry/Institution)
4. Documents supporting water requirement as per industrial process
5. Document mentioning approved quantity of the present source
6. Index plan showing Source of water to the exact location of the Industrial unit
/Institute
7. Draft of agreement for withdrawal of water
(Website: http://guj-nwrws.gujarat.gov.in/downloads/gr_10022015_p.pdf)
8. Copy of the receipt of the payment of security deposit/DD through E-treasury
( equivalent to the water charges of 90 day’s water requirement)
9. Document showing the proof of land ownership (7-12 form or Lease deed )
10. Status of GPCB approval alongwith validity date.
11. Status of Factory License approval along with validity date.
12. Undertaking of Applicant to abide by the Rules and Regulations and to pay all the
charges decided time to time.
13. Documents if permission of water for the present project was taken before
- If industry has got permission with other name
- If the permission is cancelled, then give details
- If any court case filed with Water Resources Dept/ SSNNL/GWIL. or other
authority regarding recovery of water charges
B. Additional documents required for withdrawal of water for Drinking purpose:
1. Water requirement 70 liter per capita per day as per prevailing norms vide Govt GR
Dtd.03/02/2007. (website: http://guj-nwrws.gujarat.gov.in/downloads/GR_
watercharges.pdf)
2. Calculation of Census certified by Govt authority.
3. in case of supplying water by applicant Company/institution to the nearby villages the
Certificate of beneficiary Gram Panchayat/Nagar Palica along with authentication of
census.

Processing fee applicable: At Present ‘Nil’ but will be applicable whenever decided.
Further water charges and necessary other charges to be paid when informed.

Process Flow:

Applicant applies for Applicant selects Applicant fills the


a new water the water source application form, uploads
connection on IFP from among the 8 the required documents
mentioned and pays the prescribed
fee

All the The concerned officer will The application will go to


communication to upload the status to the the designated officer of
the applicant will be IFP which will be relayed the respective
via the IFP to the applicant department to be
processed manually

You might also like