Daily Accomplishment Report: Period Covered: N/A
Daily Accomplishment Report: Period Covered: N/A
Daily Accomplishment Report: Period Covered: N/A
AM PM Manhours
No. JD Employee Name OT Hrs Total Hrs
IN OUT IN OUT Productive Hrs Idle Hrs
1 PROJECT ENGINEERDAN IVAN GARCIA 5:00 10:00 3:00 7:00 8.00 8.00
2 SITE ENGINEER JOHN CARLO NAVEA 5:00 10:00 3:00 7:00 8.00 8.00
3 SAFETY OFFICER JONEL MADANLO 5:00 10:00 3:00 7:00 8.00 8.00
4 LABOR 6 5:00 10:00 3:00 7:00 8.00 8.00
5 INSTALLER 9 5:00 10:00 3:00 7:00 8.00 8.00
6
8
9
10
11
1 Connecting of Railings
4200mm 468 pcs
Splice 156 pcs
Total Weather:
Remarks/ Comments: A.M. P.M.
Approved by:
Inspected by:
SITE PHOTOGRAPHS: