Field Quality Plan
Field Quality Plan
Field Quality Plan
iv. Yield
Stress/Proof
Stress
v Percentage
Elongation.
vi. Bend/Rebend One sample per lot of 20 IS:432, IS: 1139, MPPTCL Review of
Test M.T. or part thereof for each IS 1786 and approved manufacturers Test
size of Steel as per IS 432. MPPTCL Laboratory. certificates by
IS:1139, For Steel as per IS : specification. MPPTCL.
1786 under 10mm -16mm,1
sample for each 10 M.T. or
part thereof, 10-16 mm 1
sample for each 10 MT or
part thereof.
vii. Reverse Bend One sample per IS:432 , and Manufacturer/ Review of
Test for HDS lot of 3 M.T. or MPPTCL MPPTCL manufacturers Test
Wire. part thereof for specification. approved certificates as well as
each size. Laboratory. Lab. Test result by
MPPTCL.
i. Check of centre line of pile Each Pile IS:2911 and MPPTCL Joint Inspection Checklist to be
group Group. approved pile foundation by MPPTCL and prepared and signed
drawings/ specification contractor jointly.
ii Check pile location Each Pile IS:2911 and MPPTCL Joint Inspection Checklist to be
approved pile foundation by MPPTCL and prepared and signed
drawings/ specification contractor jointly.
iii. Standard penetration test and As per IS:2911 and MPPTCL MPPTCL Approval by
Pile load test MPPTCL approved pile foundation approved lab MPPTCL
Specificati drawings/ specification
on & IS
2911
iv Approval of Mix design, As per IS:456 and MPPTCL MPPTCL Approval by
Batching, Mixing of concrete MPPTCL approved pile foundation approved lab MPPTCL
& compacting Specificati drawings/specification
on & IS
456
ii Check for Quantities for 100% on all locations IS:456,IS-516 & IS 1199 Contractor
cement for fine & coarse and MPPTCL
aggregate & water while Specification
mixing
O CONCRETE CUBE
TESTING
ii Compressive strength One sample per 60 IS:456,IS-516 & IS 1199 Approved lab
CuM of Concreting or and MPPTCL
part thereof for each Specification
day or 3 days .
concreting whichever is
less
P CHECK FINISHING,
DIMENSIONAL
CONFIRMITY AND
WORKMANSHIP BEFORE
& AFTER BOX REMOVAL
Ii Compaction test (Percentage For gantry & bus MPPTCL Specification Approved lab
of dry density ) foundations, one & Drawing
sample for each pit,
equipment & other
foundations and other
filling material for yard
leveling 20% at random
Q BRICK WORK
I Mortar mix/ proportion / Random IS: 2250 and MPPTCL Contractor
alignment/ plumb/joints Specification
R PLASTERING
S Plastering thickness & Random IS: 2250 and MPPTCL Contractor
evenness, mortar mix/ Specification
proportion