Particle Size Analysis - Sieve Analysis (Dry)
[As per the BS 1377-2 Standard Method of Test for Soil for Civil Engineering Purpose]
Client :- XYZ Construction (PVT) Ltd
Project :- Dam Construction Project Date :- 2019/05/25
BH Number :- Depth :-
Total Mass of the Sample :- 1000.00 g

Sieve Size Mass of Sieve Mass of Sieve Mass of Soil Cumulative


% Retained % Finer
(mm) (g) + Soil (g) Retained (g) % Retained
9.500 1148.00 1148.00 0.00 0.00 0.00 100.00
5.600 1142.50 1214.50 72.00 7.20 7.20 92.80
3.350 1144.00 1218.50 74.50 7.45 14.65 85.35
2.360 1141.00 1182.00 41.00 4.10 18.75 81.25
1.180 1060.00 1124.50 64.50 6.45 25.20 74.80
0.600 976.00 1060.50 84.50 8.45 33.65 66.35
0.300 882.50 987.00 104.50 10.45 44.10 55.90
0.150 835.00 914.50 79.50 7.95 52.05 47.95
0.075 909.00 939.00 30.00 3.00 55.05 44.95
Pan 977.50 1426.00 449.50 44.95 100.00 0.00
1000.00