ANHUI OASIS BIOTECH CO.,LTD.

SALES CONTRACT

S/C NO.:OAED- 1801001 ORIGINAL DATE: 2018/1/16

Seller: Great Oasis Global Limited BUYER: RP AMBIENTAL S.A.C

Contact: Dorothy Contact: Jimmy Ortega

The Seller agree to sell and the Buyer agree to buy the following goods according to the terms
and conditions set forth below:

Shipping Mark Description of goods Quantity Unit price Amount

As Buyer’s Used cooking oil


110.00MT $660.00 $72,600.00
Option 1518000000

$72,600.00(Say USD SEVENTY TWO THOUSAND SIX


TOTAL
HUNDRED IN TOTAL)

1)- Time of Shipment: March,2018

2)- Packing:Flexitank

3)-Port of shipping: LIANYUNGANG, CHINA

4)-Term of Payment: 30% deposit in advance, balance against copy of B/L

5)-Price: The unit price in U.S dollars per metric tonne, FOB Lianyungang, China, shall be
USD 660/mt without saybolt or any other test report cost.

6)-Guaranteed specs: FFA 5 max:-USD 1/MT for each 0.1% excess.


M&i 2 max: -USD1/MT for each 0.1% excess.
Iodine value 90 min: -USD1/MT for each 0.1% excess.
Sulphur 60 ppm max: -USD1/MT for each 0.1% excess.
7)-Quantity: 110MT +/- 10% operational tolerance, in flexitank, basis on B/L quality, in one
shipment lot.
8)-Quality: Quality will be determined at loading as per certificate issued by Saybolt, at
buyer’s option and costs.

1
9)-Force Majeure: The Seller shall not be held responsible if they, owing to Force Majeure
cause or causes, fail to make delivery or to make delivery within the time stipulated above.
However, in such a case, the Seller shall inform the Buyer by fax immediately. At request of
the Buyer, the Seller shall send to the Buyer by registered letter a certificate attesting the
existence of such a cause or causes.

10)-Arbitration: All disputes in connection with this contract or the execution of this contract
shall be settled through negotiation. If no settlement can be reached, the case shall be
submitted to China International Economic and Trade Arbitration Commission in Beijing
(CIETAC) for arbitration. The award rendered by the arbitration board shall be final and
binding on both parties. The arbitration expenses shall be borne by the losing party unless
otherwise awarded by the board.