Job Procedure
For
BACKFILLING
JP : JOB PROCEDURE
01
Review and
00 SUNANDA RAVI TEJA
approval
SEN ROY D.
Prepared Checked Reviewed Approved
Rev I Date Description
by NRP By NRP ByTE ByTE
~
~ nrp P.!lD.!m?
GAIL (India) Limited
NRP PROJECTS PVT. LTD.
Job Procedure No.: NRP/Gail/TEC/BANAS/025.
TRACTEBEL
eNGle
TABLE OF CONTENT
SL.NO DESCRIPTION PAGE
1 PROJECT 3
-
2 PURPOSE 3
-
3 REFERENCE 3
4 HEALTH,SAFETY & ENVIRONMENT 3-4
-
5 EQUIPMENT & MANPOWER 4
6 METHODOLOGY 4-7
7 APPEN DICES/FORMATS 7
SUBJECT: BACKFILLING
REVISION- 01 Page 12
~"
"
@
~ nrp P.\lMQl
GAIL (India) Limited
NRP PROJECTS PVT. LTD.
Job Procedure No.: NRP/Gail/TEC/BANAS/025.
TRAtTEBEL
eNGle
1.0 PROJECT
MIs Gail (India) Limited has awarded to MIs. NRP projects Limited (Infrastructure Division), a
contract for laying 16" dia. HDD For BANAS River CrossingTotal 2.2 Km long in length.
2.0 PURPOSE
This work instruction is to lay guidelines and requirements and to establish a method or a
system to control the Lowering activity and inspection to be used for PERMANENT MITIGATION
MEASURE OF PIPE EXPOSED IN BANAS RIVER CROSSING AND ADJACENT AREA OF JAM NAGAR
LONI LPG PIPELINE Project.
3.0 REFERENCES
• NRP shall ensure that the special care to be adopted against snake / insects bite.
• All PPE is a must in this activity.
• Only trained personnel to be deployed for this activity.
• Personnel around must be informed evacuated to a safe distance.
• All Measuring & Test Equipments used must be well maintained . .
• Regular awareness program shall be arranged. t."G'N~ ,
• NRP shall arrange first aid box. ~'" ~~
• Safe distance to be maintained from HT line. ff1 ~
• Engage experienced operator with valid license. ~ ,
• Housekeeping to be maintained in wo~ea. ~.l --.L
~ ~/~
~~
SUBJECT: BACKFILLING
REVISION· 01
Page 13
@
~ mp P.IlPJtnl
GAIL (India) Limited
NRP PROJECTS PVT. LTD.
Job Procedure No.: NRP/Gail/TEC/BANAS/025.
TRAC.TEBEL
eNGle
5.0 METHODOLOGY
a) NRP shall arrange to take levels as soon as the lowering activity is completed in presence TE / GAIL
to allow survey the centre line of the pipe and the level of pipeline in the trenches prior to
backfilling.
b) NRP shall make arrangements for measuring the deviations of the pipe centerline before backfilling.
If it is there, it shall be brought to the notice of TE / GAIL. For underground pipeline crossings and
overhead power line crossings, concrete slab/plastic grating to be provided as per Standard
c) Backfilling shall be commenced only after post padding_is done at least for 300 mm covering &
above the pipe. Post padding work shall start immediately after lowering & pipe cover shall be
d) GAIL's Warning mat / Impact Resistance Sheet shall be kept 500 mm below from the ground level.
e) Backfilling shall not be done until the pipe and appurtenances have been properly fitted and the
pipe is according to the ditch profile at the required depth that will provide the required cover and
has a bed which is free from extraneous material and which allows pipe to rest smoothly and
f) De-watering if required shall be carried out prior to backfilling & no backfilling allowed if the trench
is not completely de watered. Any saline water found during trenching / Backfilling shall be
discharged in to Drain / Canal at the nearest location available. Dewatering on ROW shall not be
allowed. In general trench should be dry prior to padding. The last 2 mtrs. lengths shall not be
g) Backfilling shall be done with prior approval of TE/GAIL. If any backfilling is done without TE/GAIL
SUBJECT: BACKFILLING
REVISION- 01
@
GAIL (India) Limited
TRACTEBEL
NRP PROJECTS PVT. LTD.
Job Procedure No.: NRP/Gail/TEC/BANAS/02S.
i nrp ERR!lm
eNGle
h) Prior to back filling it should be ensured that the coated portion is Holiday checked, NRP checked
post padding of 300mm minimum thick layer of soil is put over and all around the pipe
i) The backfill material shall be soil, sand, clay or other materials containing no materials, which could
damage the pipe and/or coating or leave voids in the backfilled trench. Each completed layer of
backfilling shall be carefully deposited, watered where necessary and thoroughly consolidated to
the satisfaction of TE / GAIL. The surplus material shall be neatly crowned directly over the trench
and the adjacent excavated areas on both sides of the trench to such a height, which will, proVide
for future settlement of the trench backfill during the maintenance period and thereafter. The
crown shall be high enough to prevent the formation of the depression in the soil when backfill has
j) If depression occurs after backfill, N RP shall carryout the remedial work. Surplus material left from
this operation shall be disposed off to the satisfaction of landowner or authority having
jurisdiction.
k) Where rock, gravel, lumps of hard soil or like materials are encountered at the time of trench
excavation, sufficient sand or select backfill materials shall be placed around and over the pipe to
form a protective cushion extending at least to a height of 300 mm above the top of the pipe.
Loose rock/stone of size not more than 150 mm may be returned to the trench after the required
I)
GAIL
SUBJECT: BACKFILLING
REVISION· 01
~
~ nrp fll!l!~m
GAIL (India) Limited
NRP PROJECTS PVT. LTO.
Job Procedure No.: NRP/Gail/TEC/BANAS/025.
TRACTEBEL
eNGle
sand or suitable materials (shall be approved by TE I GAIL) in suitable layers, which will be
thoroughly compacted. Compaction tests shall be carried out to ensure proper compaction and
n) When backfilling the trenches in sloping terrain's or ste~p areas, where in the opinion of the TE /
GAIL the backfill may be washed out of the trench, sheet piling or other effective water breakers
across the trench shall be provided by NRP. This is to divert the flow of water away from the
trench into normal drainage followed before laying of the line. In No case, the water is to be
drained via the trench or via channels other than those followed before the line was laid.
0) Back filling in steep areas where slope is 10% or more shall be provided with breakers. These
breakers will consists of grout bags filled with 4:1 sand: Portland cement as per directions of TE /
GAIL Such works shall be at no extra cost to GAIL. NRP shall pay attention to the direction of back
p) NRP shall replace the top soil wherever applicable, which was stored separately during trenching
slope & soil stabilization to be carried out as per relev.ant specification & at locations shown in
alignment sheets or identified by TE / GAIL .For U/G pipeline crossings & overhead power line
crossings concrete slab 100 mm Thickness or plastic grating 6 mm thickness shall be provided as
per standard.
q) NRP shall carry out stabilization of backfill in sandy areas and other such places, as directed by the
r) The back fill shall be stabilized preferably with 150-mm layer of marl, mattresses of batch other
- '
than straw or other suitable materials. The width of stabilization shall be at least 3.0 meters on
(;1
SUBJECT: BACKFILLING
REVISION- 01
~
~ nrp F.R\l!~m
GAIL (India) Limited
NRP PROJECTS PVT. l TO.
Job Procedure No.: NRP/Gail/TEC/BANAS/025.
TRACTEBEL
eNGie
Backfilling System
l. Drop height of the filling soil must be limited to the absolute minimum.
2. Filling with sand-bed only applicable on flat terrain.
NOTE: In case of any conflict between the requirements of this procedure and that of above referred TE
specification, the later shall govern.
SUBJECT: BACKFILLING
REVISION- 01 P age 17
C~)
Client: MIs Gall India Limited
Inspection by
Verification By
S.No I Activity Description
NRP GAII..(I'EC
I Records to be Submitted by NRP
De watering P W
Padding P W
7
Back filling / areable soil spreading P W
8 Compaction P W
Surplus material spread over P W
LEGENDS:
"P" : PERFORM
-
I:""'g~~'
~''e
~ ~_. !»
~ .~~
" ~
. ~~
~A
--=-
-Y-Fl:~c.."""rE::lE3eL.
PROJECT: PERMANENT MITIGATION MEASURE OF PIPE EXPOSED IN BANAS
RIVER CROSSING AND ADJACENT AREA OF JAMNAGAR LONI PIPE LINE
Weather : Date:
Pipe Size :
Joint No Chainage Length
SINo Remarks
From To From To Today Previous Tilldate
SLNo
U Chalnago Padding Slope Plastic Anti
Rock
Backfilling
Romal1<.
From To Top Bottom Breakers Grating Buoyancy
Progress
Padding (Post)
Remarks
g~~
-
NRP f/~l
~ r .\~~ TEiGAIL A"'GI~ '
c..
~~ \~L\' It.'f~ :s~
Sign.: ct. 600 01 4' ) ;-'}) Sign.: ""/A I1l ~
' ()U(J ~ r lRAcTaJe. Z1