(A Subsidiary of Coal India Limited) : Eligibility Criteria
(A Subsidiary of Coal India Limited) : Eligibility Criteria
Part-I
The tenderers must submit the above documentary proof in seal cover in support of above, in the form of
payment / completion certificate issued by Govt./ semi Govt. organization for which they have worked.
Contd….P/2
Page-2
Contractor must sign with seal on the tender documents to be submitted by them.
Tenderers should also furnish firm registration, details of partnership deed and power of attorney, if any.
Banker certificate for financial soundness.(validity one year from the date of issue of certificate).
Authenticate Copy of PAN Card.
Copy of TIN registration No.
List of tools & Tackles possessed by the contractor.
List of technical persons under contractor’s roll.
Affidavit certifying that the owner has not been involved in any criminal case and has not been blacklisted in CCL or
any subsidiary of CIL (Affidavit should be in non Judicial Stamp Paper and certified by Notary Public, validity one
year from the date of issue).
Affidavit certifying that agency shall not employ on this contract any close relative of CCL employee (Affidavit
should be in non Judicial Stamp Paper and certified by Notary Public, validity one year from the date of issue).
Proof of earnest money as mentioned above.
Copy of e-Payment.
Valid electrical licence
Service tax regn. if payable
Part -II
This will contain only price bid in terms of percentage above/ below the estimated cost, item wise if any in prescribed
tender document. Part-II will be opened only if the credential as per part-I is found to be satisfactory.
Validity of Offer : The offer should be kept valid for 180 days from the date of opening of tender specified.
Withdrawal of tender within the validity period is not permitted.
Payment : Payment of bills to be made within 21 days after submission of bill duly completion in all
respect. Payment to be made through e-Payment from AFM Office, Piparwar Area.
Performance guarantee : The contractor shall guarantee / Warranty against any failure of above subject work due to
bad workmanship and due to inferior quality of materials supplied by him. The contractor
shall guarantee against any such failure for a period of 06 months from the date of actual
completion of work. The same has to be rectified / replaced free of cost within the
performance guarantee period. The rectification work must immediately within 24 hrs. on
receipt of information.
Security Money : 10% of award value will be deducted from the bill against performance guarantee.
And same has to be returned after completion of satisfactory performance guarantee.
Penalty : A penalty @ 0.5% per week of award value will be imposed if the work is not being
completed in time and the same will be limited to maximum of 10% of the awarded value.
Safety : The safety to the workmen engaged by the contractor is the sole responsibility of the
contractor. The contractor shall make all possible measure for safety as per statutory
provisions. Any compensation on account of damage of person or properties of owner/
contractor, has to be borne by the contractor. It shall be governed by statutory provision.
The management reserves the right to accept or reject any or all the tender without assigning any reason
whatsoever and divide the work more than one tenderers. All other terms and condition will also apply as per company’s
norms.
Staff Officer(E&M),
Piparwar area.
Distribution to:-
1. GM, Piparwar
2. GM(E&M)HOD, CCL, Ranchi
3. Addl. GM, Piparwar Area
4. General Manager(System), CCL, Ranchi. Kindly float the tender in CCL web site.
5. Staff Officer(E&M), Argada/Barka-Sayal/B&K/Charhi/Dhori/Kuju/Kathara/Rajhara/NK/Rajrappa
6. AFM, Piparwar Area
7. SO(P&P), Piparwar Area.
8. Project Officer, Ashok / CHP-CPP / Piparwar / Bachra
9. Chief Manager(E&M), AHQ
10. PE(E&M), Ashok, Bachra, CHP-CPP, PPR
11. Area Security Officer, Piparwar to please arrange receipt of tender.
12. Cashier, GM Unit, to arrange issue CR against DD/BC
13. Tender file
14. Notice board.
CENTRAL COALFIELDS LIMITED
(A Subsidiary of Coal India Limited)
PIPARWAR AREA
Name of work: Part erection / extension / re-arrangement of lighting at the junction of Central barriers to toe of Coal
stock no.18F with provision of light fittings and additional light fittings at the existing lighting line of CTA
road upto Coal Stock No.19 of Ashok Project, Piparwar Area.
Name of work: Providing and fixing of Garden light at Basant Vihar Colony under Piparwar Project of Piparwar Area.
Bill of Quantity
01 Laying of one number PVC insulated and PVC sheathed 330 Mtr.
copper cable of 1.1kv grade of size not exceeding 25sqmm
direct to ground including excavation sand cushioning
protective covering and refilling the trench etc. as required
02 50x50x6mm MS Angle 24 Kg
06 Supply of 10 Sqmm 650volt / 1100 volt grade 2 core PVC 395 Mtr.
armoured aluminium cable make Havels / Polycabe
07 Supply of 4 sqmm 650volt/ 1100volt grade 2 core PVC 129 Mtr.
flexible cable with copper conductor make Havels/ polycabe
08 Supply of 16sqmm 650volt/1100 volt grade 4 core PVC 40 Mtr.
armoured aluminium cable make Havels / Polycabe
09 Supply of 100Amp TPN main switch make HPL Crompton 1 No.
greaves
10 Supply of post top lantern with conical cover type SPC 2 Nos.
101/70(E) HPE for lamp 70W€ excluding lamp, Make-
Crompton Greaves, Bajaj, Philips
11 Supply and fixing of 45W CFL lamp make Crompton Greaves, 43 Nos.
Philips
12 Providing and fixing of GI pipe complete with CI fittings and 90 Mtr.
clamps, including cutting and making goods the wall etc.
50mm dia nominal bore
13 Supply & fixing of footway distribution box triple pole neutral 43 No.
board
14 Supply of diamond shape roto mould diffuser CFPT 1145 43 No.
MR/BC 1 x 45W CFL – DF , Make- Philips, Crompton
15 200Amps TPN rising mains with aluminium busbar 1 Mtr.
16 Supply of 70W MH protected make: Philips , Crompton 2 No.
Greaves , Bajaj
17 Erection cost of item no. 6 to 11, 14,16
Name of work: Re-arrangement of HT line to clear the Area for mining activities at the south west end of the mine and
widening of Haul road for safe transportation of OB from patch C to the Dump yard for patch C of Ashok OCP, Piparwar
Area.
No.SO(E&M)/PPR/TN/13-14/2541-54(iii) Date :05.03.2014
Bill of Quantity
Sl. Description of work Qty UoM Materials Labour Amount
cost Cost
01 Fabrication of tubular pole for making 14mtr. long with 540 Cms
welding work = 180cm for each pole x 3 no.
02 Supply and erecting of tubular/ rail pole upto 12m long 17 Nos. Dept.
complete in provided CC foundation and muffing square /
round with handing from storage yard to site
03 For 01 nos. of 14mtr. pole: Erection of steel pole of 3 Nos.
length 14mtr. in Cement concrete 1:3:6 (1 Cement: 3
Coarse sand : 6 graded stone aggregate 40 mm nominal
size) foundation including excavation and refilling etc as
required
04 Erection of steel pole upto 12m in CC: Erection of steel 8 No.
tubular pole of length exceeding 10mtr. But not
exceeding 12mtr. In Cement Concrete 1:3:6 (1 Cement
:3 Coarse sand : 6 graded stone aggregate 40 mm
nominal size) foundation including excavation and
refilling etc as required
05 Erection of metallic street light standard pole of length 6 Nos.
exceeding 4.5mtre. but not exceeding 6.5mtr. in Cement
Concrete 1:3:6 (1 Cement :3 Coarse sand : 6 graded
stone aggregate 40 mm nominal size) foundation with
cement concrete collar of size 0.4m dia x 0.5m height to
accommodation the looping type cable end box including
excavation and refilling etc. as required
06 S/E 7/3.15mm stay set with bow tightener: 12 No.
Supplying and erection of galvanised stay set complete
with 19/20 mm dia x 1.8 meters long stay rod , anchor
plate of size 45CM x 45CM x 7.5MM , thimble, Stay
clamps bow tightner, 7/3.15mm dia GI stay wire and
strain insulator etc in cement concrete 1:3:6( 1
Cement:3 Coarse sand : 6 graded stone aggregate 40
mm nominal size) foundation including excavation and
refilling etc as required
07 Erection of AA conductor of 7/1.96mm to 7/3.10mm dia 406 Kg Dept.
290kg/km
08 Erection of angle channel iron cross of RCC / PCC / Steel 17 Set Dept.
tubular / Pole etc. as required.
09 Erection of 11kv disc / pin insulator etc. as required 30 Nos. Dept.
10 Supply and fixing of Nut Bolts of 16mm x 40mm with 54 Nos.
washer complete
11 Supply of 7/16 GI wire for erection & replacement of 124 Kg
damaged earth wire with binding and for erection of
cradle guard etc.
11 a) Erection of cradle guard as required 20 Nos.
11 b) Erection of earth wire with binding etc. complete 84 Kg.
12 Dismantling / erection of 100KVA, 3.3kv/220volt, 100KVA 2 Nos. Dept.
, 3.3kv/415volt Transformer
13 Dismantling of pole/ street light / strut embedded ion CC 10 Nos.
foundation etc.
14 Dismantling of iron materials, conductor insulator 640 Kg.
Name of work: Erection and dismantling of 4 span 33kv OH line along mine edge , near TSS 4201 under Piparwar
Project rout length 200mtr.
Bill of Quantity
Sl. Description of work Qty UoM Rate Amount
Name of work: Erection of pole, stringing of conductor, fixing of GOAB and fixing Horn Gap fuse set of 11kv OH line
near Ray Colliery campus and erection of pole and stringing of conductor of 440volt OH line near Ray
substation of TH colony under Bachra Project, Piparwar Area.