Hazard Identification, Risk Assessment & Determining Control

Job Order: Project/Site Location:

Department Involved:
Work Description:
Job Supervisor:
Localized Shutdown: Required: Not required:
Date: Subcontractor: Ref. No.:
GUT Supervisor Mobile No.: Rev. No.:

General Safety condition Requirements:

1.      GUT – HSE Plan and Safety procedures are to be followed at all times.
2.     Minimum PPE to be worn at all times.

3.     JSA/JHA to be available at all points of the work – Workers must be informed of JSA/JHA and understand the risk involved in the works.

4.     Tool box talk/pre-job briefing to be given at the start of each work shift and before starting a new task or activity.
5.     First Aiders or medical facilities to be available.

Minimum PPE Required: Hard hat, safety glasses, hi-visibility vest, overall, gloves, safety shoes

Prepared By Review By Approved By Acknowledge By Client

Safety Officer HSE Engineer Site Manager/Const.Manager HSE Lead


RISK MATRIX & HAZARD CODE / MATRIKS RESIKO & KOD
Risk
Hazard Code Potential Risk Level (RL) Possible Consequence
Kode Bahaya Potensi  Tingkat Resiko Kemungkinan Akibat
Resiko
Critical Risk Fatality of Major Property Damage > US$ 10.000
AA 75 < 125
Resiko Kritikal Kematian atau kerugian barang besar >US$ 10.000
Hight Risk Serious LTI or Property Damage US$ 5.000 to 10.000
A 32 < 74
Resiko Tinggi LTI Serius / Kerugian Barang US$ 5.000 to 10.000
Medium Risk LTI or Property Damage US$ 1.000 to 5.000
B 18 < 31
Resiko Sedang LTI / Kerugian Barang US$ 1.000 to 5.000
Low Risk Minor injury or Minor Property Damage
C 2 < 17
Resiko Rendah Cedera Ringan atau Kerugian Barang Ringan

RISK MATRIX / MATRIKS RESIKO


SEVERITY (S) / KEPARAHAN (S)
Minor injury or Occupational Disease / Property Damage / Loss / Pollution
<US$ 100
1
Cedera Riangan atau PAK (Penyakit Akibat Kerja) / Kerusakan Harta Benda /
Kehilangan / Pencemaran < US$ 100
Loss Time Injury or Occupational Disease With No Permanent Disability /
Property Damage / Loss / Pollution (US$< 100 < & < US$ 10.000)
2
Cedera Hari Hilang atau PAK (Penyakit Akibat Kerja) tanpa cacat permanen /
Kerusakan Harta Benda / Kehilangan / Pencemaran (US$< 100 < & < US$ 10.000)
Loss Time Injury or Occupational Disease With Permanent Disability /
Property Damage / Loss / Pollution (US$< 10.000 < & < US$ 25.000)
3
Cedera Hari Hilang atau PAK (Penyakit Akibat Kerja) dengan cacat permanen /
Kerusakan Harta Benda / Kehilangan / Pencemaran (US$< 10.000 < & < US$ 25.000)
Fatal Injury of Occupational Disease to One Employee / Property Damage / Loss /
Pollution (US$< 25.000 < & < US$ 50.000)
4
Cedera Berakibat Kematian atau PAK (Penyakit Akibat Kerja) Pada Satu Karyawan /
Kerusakan Harta Benda / Kehilangan / Pencemaran (US$< 25.000 < & < US$ 50.000)
Multiple Fatal Injuries or Occupational Disease / Major Property Damage / Loss /
Pollution (> US$ 50.000)
5
Cedera Berakibat Kematian pada Banyak orang atau Kerusakan Harta Benda
Besar (> US$ 50.000)
PROBABILITY (P) / PROBABILITAS (P) (1 ≤ P ≤ 5)
No Probability of Occurrence
1
Tidak Terdapat Kemungkinan Terjadi
Less than Average Probability of Occurrence
2
Kemungkinan Terjadi Lebih Kecil Dari pada Rata-rata
Average Probability of Occurrence
3
Kemungkinan Terjadi Rata-rata
Good Probability of Occurrence
4
Kemungkinan Besar Terjadi
Will Definetely Occur
5
Pasti Akan Terjadi
FREQUENCY (F) / FREKUENSI (F) (2 ≤ F ≤ 5) 5
Few Persons Once per Year (RarelyPerformed)
1
Sedikit Orang Sekali Dalam Setahun (Jarang Melakukan)
Some Persons Monthly (Unusual)
2
Beberapa Orang Setiap Bulan (Tidak Biasa)
Some Persons Weekly (Seldom)
3
Beberapa Orang Setiap Minggu (Kadang-kadang)
Few Persons Once per Day (Often)
4
Sedikit Orang Sekali Setiap Hari (Sering)
Many Persons Many Times per Day (Continious)
5
Banyak Orang Berkali-kali Setiap Hari (Terus Menerus)
IKS RESIKO & KODE BAHAYA

e Consequence Required Action


gkinan Akibat Tindakan yang diperlukan

perty Damage > US$ 10.000 Stop & Fix (Immediately)


an barang besar >US$ 10.000 Stop & Perbaiki (Segera)
Damage US$ 5.000 to 10.000 Fix Within 12 Hours or Less
Barang US$ 5.000 to 10.000 Perbaiki dalam 12 jam atau kurang
mage US$ 1.000 to 5.000 Fix Within 3 Days or Less
rang US$ 1.000 to 5.000 Perbaiki dalam 3 hari atau kurang
Minor Property Damage Fix When Possible
u Kerugian Barang Ringan Fix Jika Dapat
Task Number  Task Name 2X100 MW COAL FIRED POWER PLANT 
GUT/HIRA/01
Nomor Tugas Nama Tugas PROJECT

List of Processes Maximum Risk Assesement for


Incident / Disease Situation Without Control Hazard
and Operational List of  Detail of Hazard Severety
Scenario / Penilaian Risiko Untuk  Code 
No. Daftar  Equipment/ Tools/  Work Area Analisis  Situasi Tanpa Kontrol
Skenario  Kode 
Proses dan  Material Rincian Bahaya Keparahan 
Penyakit / Insiden Bahaya
Operasional Maksimum
P S F RL

Persiapan

Transmission Line 150 
1. Luka Fraktur
kV dan 20 kV Tabrakan dengan Unit 
1 Mobilisasi pekerja - Sarana 2. Property Damage Fatality 5 4 5 100 AA
 (Melewati Hauling  DT
MSW)

Transmission Line 150 
1. Luka Fraktur
- Truck, Lowboy,  kV dan 20 kV Tabrakan dengan Unit 
2 Mobilisasi Material 2. Property Damage Fatality 5 4 5 100 AA
Sarana  (Melewati Hauling  DT
MSW)

- Sarana
- GPS Transmission Line 150 
1. Cidera Tulang 
Investigasi Tanah atau  -Mesin sondir kV dan 20 kV 1. Ergonomi,  1. Cidera Bahu
3 Punggung 4 4 3 48 A
Sondir -monometer conus dan   (Melewati Hauling  2. Tergigit Ular 2. Keracunan
2. Pingsan
biconus MSW)
- pipa 3/4'' panjang 1 m

Page 5 of 34
List of Processes Maximum Risk Assesement for
Incident / Disease Situation Without Control Hazard
and Operational List of  Detail of Hazard Severety
Scenario / Penilaian Risiko Untuk  Code 
No. Daftar  Equipment/ Tools/  Work Area Analisis  Situasi Tanpa Kontrol
- Sarana Skenario  Kode 
Proses dan  Material Rincian Bahaya Keparahan 
- GPS Transmission Line 150  Penyakit / Insiden Bahaya
Operasional
Investigasi Tanah atau  -Mesin sondir kV dan 20 kV 1. Ergonomi,  1. Cidera Bahu Maksimum
3
Sondir -monometer conus dan   (Melewati Hauling  2. Tergigit Ular 2. Keracunan
P
4 S
4 F
3 RL
48 A
biconus MSW)
- pipa 3/4'' panjang 1 m

Clearing & Grubbing  Transmission Line 150 
1. Terhantam  1. Patah Tulang
Transmission Line  - Excavator kV dan 20 kV Fatality
4 Excavator 2. Keracunan 5 4 5 100 AA
Manual dan dengan  -Golok  (Melewati Hauling  Pingsan
2. Tergigit Ular 3. Fatigue
A2B MSW)

1. Terpotong - Jari Terpotong
Pembuatan Temporary  1. Cidera Ringan
5 - Tools Mechanic HGU 2. Terjepit - Cidera punggung  3 4 3 36 A
Site Office 2. Keseleo
3.Tersandung Tulang Belakang

Transmission Line 20 kV Water Intake

Penggalian Lubang  1. Fatigue 1. Pingsan 


1 - Cangkul Hauling Road MSW 1.Terhantam Cangkul 5 4 5 100 AA
Pondasi Manual 2. Cidera 2. Fatality

Page 6 of 34
List of Processes Maximum Risk Assesement for
Incident / Disease Situation Without Control Hazard
and Operational List of  Detail of Hazard Severety
Scenario / Penilaian Risiko Untuk  Code 
No. Daftar  Equipment/ Tools/  Work Area Analisis  Situasi Tanpa Kontrol
Skenario  Kode 
Proses dan  Material Rincian Bahaya Keparahan 
1
Penggalian Lubang 
- Cangkul Hauling Road MSW 1.Terhantam Cangkul Penyakit / Insiden
1. Fatigue
5 4 5 100 Bahaya
AA
Operasional
Pondasi Manual 2. Cidera Maksimum
P S F RL

Page 7 of 34
List of Processes Maximum Risk Assesement for
Incident / Disease Situation Without Control Hazard
and Operational List of  Detail of Hazard Severety
Scenario / Penilaian Risiko Untuk  Code 
No. Daftar  Equipment/ Tools/  Work Area Analisis  Situasi Tanpa Kontrol
Skenario  Kode 
Proses dan  Material Rincian Bahaya Keparahan 
Penyakit / Insiden Bahaya
Operasional Maksimum
P S F RL

1. Tertabrak pengguna 
jalur
Mobilisasi/ Loading  1. Luka Fraktur 1. Patah Tulang
2 - Crane Truck Hauling Road MSW 2. Tabrakan 5 4 5 100 AA
dan Unloading Pole 2. Material Damage 2. Fatality
3. Terhantam Pole
4. Material Damage

1. Tertimpa Pole
- Monopod/
2. Terhantam Pole  1. Cidera 1. Patah Tulang
3 Erection Pole -Crane Truck Hauling Road MSW 5 4 5 100 AA
3. Jatuh dari ketinggian 2. Tangan terjepit 2. Pingsan
- Lifting Gear
4. Terjepit

1. Tertimpa accessories 
pole 1. Patah Tulang
Pemasangan Aksesoris  - Tangga 1. Dehidrasi
4 Hauling Road MSW 2. Jatuh dari ketinggian 2. Cacat 5 4 4 80 AA
(Arm, Isolator, LA) - Full Body Harness 2. Tangan Terjepit
3. Tangan Terjepit 3. Fatality
4. Tersambar Petir

Page 8 of 34
List of Processes Maximum Risk Assesement for
Incident / Disease Situation Without Control Hazard
and Operational List of  Detail of Hazard
1. Tertimpa accessories  Severety
Scenario / Penilaian Risiko Untuk  Code 
No. Daftar  Equipment/ Tools/  Work Area pole Analisis  Situasi Tanpa Kontrol
Pemasangan Aksesoris  - Tangga Skenario 
1. Dehidrasi Kode 
4 Proses dan 
(Arm, Isolator, LA) Material
- Full Body Harness Rincian Bahaya
Hauling Road MSW 2. Jatuh dari ketinggian
2. Tangan Terjepit Keparahan  5 4 4 80 AA
3. Tangan Terjepit Penyakit / Insiden Bahaya
Operasional Maksimum
4. Tersambar Petir P S F RL

- Jack Haspel
Stringing Aluminium  - Cable Cutting 1. Jatuh dari ketinggian 1. Fatigue 1. Patah Tulang
5 Hauling Road MSW 5 3 5 75 AA
Conductor - Tangga 2. Tersambar Petir 2. Dehidrasi 2. Cacat
- Full Body Harness

GI (Switchyard Tanjung & Switchyard Kalsel

Penggalian pondasi  1.Terhantam Cangkul
dengan Manual dan  - Cangkul Switchyard Tanjung  2. Terhantam  1. Fatigue 1. Pingsan 
1 5 4 5 100 AA
Penggalian dengan   - Excavator dan Kalsel Area Excavator 2. Cidera 2. Fatality
menggunakan A2B 3. Gas H2S

1. Terpotong
Pembesian (Rebar  -Rebar Cutting Switchyard Tanjung  Jari Terpotong
2 2. Terjepit Cidera Ringan 4 4 3 48 A
Work) - Tools Mechanic dan Kalsel Area LTI
3.Tersandung

Page 9 of 34
List of Processes Maximum Risk Assesement for
Incident / Disease Situation Without Control Hazard
and Operational List of  Detail of Hazard Severety
Scenario / Penilaian Risiko Untuk  Code 
No. Daftar  Equipment/ Tools/  Work Area Analisis  Situasi Tanpa Kontrol
Skenario  Kode 
Proses dan  Material Rincian Bahaya Keparahan 
Penyakit / Insiden Bahaya
Operasional
Pembesian (Rebar  -Rebar Cutting Switchyard Tanjung 
1. Terpotong Maksimum
2
Work) - Tools Mechanic dan Kalsel Area
2. Terjepit Cidera Ringan P
4 S
4 F
3 RL
48 A
3.Tersandung

Page 10 of 34
List of Processes Maximum Risk Assesement for
Incident / Disease Situation Without Control Hazard
and Operational List of  Detail of Hazard Severety
Scenario / Penilaian Risiko Untuk  Code 
No. Daftar  Equipment/ Tools/  Work Area Analisis  Situasi Tanpa Kontrol
Skenario  Kode 
Proses dan  Material Rincian Bahaya Keparahan 
Penyakit / Insiden Bahaya
Operasional Maksimum
P S F RL

Switchyard Tanjung  Cacat                             
3 Pemasangan Bekisting - Tools Mechanic 1. Tergores 1. Cidera Ringan 5 3 3 10 B
dan Kalsel Area       LTI

- Machine Concrete  Switchyard Tanjung  1. Mata Kemasukan  1. Cidera Ringan Pembutaan pada mata   


4 Pengecoran Pondasi 6 5 3 15 B
Portable dan Kalsel Area partikel coran 2. Cidera berat                             Cacat

- Tools Mechanic
Erection Structure,  - Electrical Winch Switchyard Tanjung  1. Jatuh dari ketinggian 1. Fatigue 1. Patah Tulang
5 6 5 2 80 AA
Gantry, Truss Beam - Rope dan Kalsel Area 2. Tersambar Petir 2. Dehidrasi 2. Cacat
- Full Body Harness

- Crane Truck 1. Tangan/Kaki terjepit 
Install HV Apparatus  1. Cacat                         
- Lifting Gear Switchyard Tanjung  2. mata kemasukkan 
6 (CB, CT, DSE, VT,  1. Cidera ringan         2.Cidera  3 5 2 30 A
- Scaffolding dan Kalsel Area partikel 
LA) Punggung
'- Full Body Harness 3.Cidera Punggung

Page 11 of 34
List of Processes Maximum Risk Assesement for
Incident / Disease Situation Without Control Hazard
and Operational List of  Detail of Hazard Severety
Scenario / Penilaian Risiko Untuk  Code 
No. Daftar  Equipment/ Tools/  Work Area Analisis  Situasi Tanpa Kontrol
Skenario  Kode 
Proses dan  Material
- Crane Truck Rincian Bahaya
1. Tangan/Kaki terjepit  Keparahan 
Install HV Apparatus  Penyakit / Insiden Bahaya
Operasional - Lifting Gear Switchyard Tanjung  2. mata kemasukkan  Maksimum
6 (CB, CT, DSE, VT,  1. Cidera ringan 3
P 5
S 2
F 30
RL A
- Scaffolding dan Kalsel Area partikel 
LA)
'- Full Body Harness 3.Cidera Punggung

- Electrical Winch
- Gripcup 1.Tangan Terjepit          
Stringing Aluminium  Switchyard Tanjung  1.Tangan robek               1. Cidera Ringan           
7 - Lever Block 2.Terjatuh dari  5 5 2 90 AA
Conductor dan Kalsel Area    2. Patah Tulang  2. Fatality
- Katrol Ketinggian
- Full Body Harness

- Hand Pallet 1. Tangan/Jari Terjepit   
Switchyard Tanjung 
8 Setting Panel - Pipa Scaffolding                      2. Kaki  1. Luka lebam/sobek Cidera Ringan 4 3 3 5 C
dan Kalsel Area
- Jack Kereta Tertimpa

- Roller Kabel 1. Tangan/Jari Terjepit 1. Luka lebam/sobek     


Switchyard Tanjung 
9 Pulling Kabel - Jack Haspel  2. Kaki Tertimpa                          Cidera  Cidera Ringan 4 4 2 10 B
dan Kalsel Area
- Cable Cutting 3. Cidera Punggung Punggung

1. Jari tergores Cutter    
                     2.  1. Luka Sobek              
Switchyard Tanjung  1. Cidera Ringan
10 Terminasi - Tools Electrical Tersengat Listrik           
Page 12 of 34 2.Pingsan              3 5 2 15 B
dan Kalsel Area 2. Pingsan
            3. Salah cable  3.Property Damage
schedule
List of Processes Maximum Risk Assesement for
Incident / Disease Situation Without Control Hazard
and Operational List of  Detail of Hazard Severety
Scenario / Penilaian Risiko Untuk  Code 
No. Daftar  Equipment/ Tools/  Work Area Analisis  Situasi Tanpa Kontrol
Skenario  Kode 
Proses dan  Material Rincian Bahaya Keparahan 
Penyakit / Insiden Bahaya
Operasional Maksimum
P S F RL
1. Jari tergores Cutter    
                     2.  1. Luka Sobek              
Switchyard Tanjung 
10 Terminasi - Tools Electrical Tersengat Listrik            2.Pingsan              3 5 2 15 B
dan Kalsel Area
            3. Salah cable  3.Property Damage
schedule

Page 13 of 34
List of Processes Maximum Risk Assesement for
Incident / Disease Situation Without Control Hazard
and Operational List of  Detail of Hazard Severety
Scenario / Penilaian Risiko Untuk  Code 
No. Daftar  Equipment/ Tools/  Work Area Analisis  Situasi Tanpa Kontrol
Skenario  Kode 
Proses dan  Material Rincian Bahaya Keparahan 
Penyakit / Insiden Bahaya
Operasional Maksimum
P S F RL

- Scaffolding
Tie In Aluminium  Switchyard Tanjung  1. Jatuh Dari 
11 - Tools Electrical 1. Patah Tulang Cacat/Fatality 3 5 2 40 A
Conductor ke Existing dan Kalsel Area Ketinggian
- Full Body Harness

- Megger Switchyard Tanjung  1. Tersengat Listrik 


12 Energized 1. Pingsan Fatality 3 5 2 50 A
- Multi tester dan Kalsel Area langsung

Transmission Line 150 kV

Penggalian pondasi 
Transmission Line 150 
1 Kaki Towe dengan  - Excavator Terhantam Excavator Fatality 5 4 5 100 AA
kV Cidera
Menggunakan A2B

Page 14 of 34
List of Processes Maximum Risk Assesement for
Incident / Disease Situation Without Control Hazard
and Operational
Penggalian pondasi  List of  Detail of Hazard Severety
Transmission Line 150  Scenario / Penilaian Risiko Untuk  Code 
No. Daftar  Equipment/ Tools/ 
1 Kaki Towe dengan  - Excavator Work Area
kV
Terhantam Excavator
Cidera Analisis  5 4 5 100
Situasi Tanpa Kontrol
AA
Menggunakan A2B Skenario  Kode 
Proses dan  Material Rincian Bahaya Keparahan 
Penyakit / Insiden Bahaya
Operasional Maksimum
P S F RL

-Palu
 -Paku Transmission Line 150  Cidera punggung, 
2 Bouwplank Work Terkena lentingan palu Pingsan 1 1 3 3 C
-Benang kV Dehidrasi
-Kayu

1. Terpotong
Pembesian (Rebar  -Rebar Cutting Transmission Line 150  Jari Terpotong
3 2. Terjepit Cidera Ringan 4 4 3 48 A
Work) - Tools Mechanic kV LTI
3.Tersandung

Transmission Line 150  Cacat                             
4 Pemasangan Bekisting - Tools Mechanic 1. Tergores Cidera Ringan 5 3 3 10 B
kV       LTI

- Machine Concrete  Transmission Line 150  1. Mata Kemasukan  Pembutaan pada mata   


5 Pengecoran Pondasi Cidera Ringan 4 4 2 15 B
Portable kV partikel coran                             Cacat
Page 15 of 34
List of Processes Maximum Risk Assesement for
Incident / Disease Situation Without Control Hazard
and Operational List of  Detail of Hazard Severety
Scenario / Penilaian Risiko Untuk  Code 
No. Daftar  Equipment/ Tools/  Work Area Analisis  Situasi Tanpa Kontrol
Skenario  Kode 
Proses dan  Material Rincian Bahaya Keparahan 
Penyakit / Insiden Bahaya
Operasional Maksimum
P S F RL
- Machine Concrete  Transmission Line 150  1. Mata Kemasukan 
5 Pengecoran Pondasi Cidera Ringan 4 4 2 15 B
Portable kV partikel coran

Page 16 of 34
List of Processes Maximum Risk Assesement for
Incident / Disease Situation Without Control Hazard
and Operational List of  Detail of Hazard Severety
Scenario / Penilaian Risiko Untuk  Code 
No. Daftar  Equipment/ Tools/  Work Area Analisis  Situasi Tanpa Kontrol
Skenario  Kode 
Proses dan  Material Rincian Bahaya Keparahan 
Penyakit / Insiden Bahaya
Operasional Maksimum
P S F RL

- Tools Mechanic
Erection Structure  - Electrical Winch Transmission Line 150  1.Tertimpa           2.  Cidera ringan, patah 
6 Fatality 6 5 1 80 AA
Tower - Rope kV Jatuh Dari ketinggian tulang
- Full Body Harness

- Electrical Winch
- Gripcup 1.Tangan Terjepit          
Stringing Aluminium  Transmission Line 150  1.Tangan robek               1. Cidera Ringan           
7 - Lever Block 2.Terjatuh dari  5 5 1 90 AA
Conductor kV    2. Patah Tulang  2. Fatality
- Katrol Ketinggian
- Full Body Harness

- Scaffolding
Tie In Aluminium  Transmission Line 150 
8 - Tools Electrical Jatuh Dari Ketinggian Patah Tulang Cacat/Fatality 3 5 1 40 A
Conductor ke Existing kV
- Full Body Harness

Page 17 of 34
List of Processes Maximum Risk Assesement for
Incident / Disease Situation Without Control Hazard
and Operational List of  Detail of Hazard Severety
Scenario / Penilaian Risiko Untuk  Code 
No. Daftar  Equipment/ Tools/  Work Area Analisis  Situasi Tanpa Kontrol
- Scaffolding Skenario  Kode 
Proses dan 
Tie In Aluminium  Material Transmission Line 150  Rincian Bahaya Penyakit / Insiden Keparahan 
8 - Tools Electrical Jatuh Dari Ketinggian Patah Tulang 3 5 1 40 Bahaya
A
Operasional
Conductor ke Existing kV Maksimum
- Full Body Harness P S F RL

- Megger Transmission Line 150  Tersengat Listrik 


9 Energized Pingsan Fatality 3 5 1 50 A
- Multi tester kV langsung

Site Project (BOP Area)

- Excavator 
- Gunting baja
Terhantam Excavator,  1. Cidera
- Meteran
1 Grounding installation Site Project Terpapar asap las  2. Sesak Nafas Patah Tulang, Pingsan 3 3 2 18 B
- Cadweld Tools
cadweld 3. Iritasi mata
- Kayu Patok
-Tali

- Meteran 1. Cidera punggung
-Gerinda Cidera Punggung,  2. Tertimpa pipa
Jari terpotong, Patah 
2 Duct Bank Installation -Isolasi Site Project Mata kemsukan  3. Mata Terkena 2 2 3 12 C
Tulang
-Plastik partikel 4. Percikan Gerinda, 5. 
-Kawat Terpapar debu pipa 

Disusun oleh :
PT. GRAHA USAHA TEKNIK

Page 18 of 34
List of Processes Maximum Risk Assesement for
Incident / Disease Situation Without Control Hazard
and Operational List of  Detail of Hazard Severety
Scenario / Penilaian Risiko Untuk  Code 
No. Daftar  Equipment/ Tools/  Work Area Analisis  Situasi Tanpa Kontrol
Skenario  Kode 
Proses dan  Material Rincian Bahaya Keparahan 
Penyakit / Insiden Bahaya
Operasional Maksimum
P S F RL
Disusun oleh :
PT. GRAHA USAHA TEKNIK

__________________________
Site Manager/ PJO

Page 19 of 34
PT. GRAHA USAHA TEKNIK

Revision Number
Preventive Action Regulation
Nomor Revisi

Risk Assesement for


Situation With Control /  Hazard
Peraturan Perundang-
Existing Control Penilaian Risiko Untuk  Code  Risk Reduction 
Verification 
undangan / Government  Situasi Dengan Kontrol
Penurunan 
Kontrol yang ada Kode  Bahaya Verifikasi
Regulation
Bahaya
P S F RL

- Safety Tool Box Meeting (P5M)  - UU No. 1 th 1970
- Training DDT - UU no 35 Tahun 1993
- P2H Sarana - Kepmen 555 Pasal 142 2 2 5 20 B 80 Tolerable
- Patuhi Rambu-Rambu Hauling - UU no 27 Tahun 1997 tentang 
- JSA Mobilisasi Pekerja Mobilisasi

- Safety Tool Box Meeting (P5M) 
- Training DDT - UU No. 1 th 1970
- P2H Sarana -Per 555/ Men/ 1995 K3 Pertambangan
2 2 5 20 B 80 Tolerable
- Patuhi Rambu-Rambu Hauling - UU no 27 Tahun 1997 tentang 
- JSA Mobilisasi Material Mobilisasi
- Escort/ Pengawalan Mobilisasi

- Safety Tool Box Meeting (P5M)  
- Sosisalisasi Teknik Manual Handling  - UU No. 1 th 1970
dengan benar -Per 555/ Men/ 1995 K3 Pertambangan 3 3 3 27 B 21 Tolerable
- Penanganan Keadaan Darurat - Kep 51/Men/1999 Nilai Ambang Batas
- JSA Investigasi Tanah

Page 20 of 34
Risk Assesement for
Situation With Control /  Hazard
Peraturan Perundang-
Existing Control Penilaian Risiko Untuk  Code  Risk Reduction 
Verification 
undangan / Government  Situasi Dengan Kontrol
Penurunan 
Kontrol yang ada Kode  Bahaya Verifikasi
- Safety Tool Box Meeting (P5M)   Regulation
- Sosisalisasi Teknik Manual Handling  - UU No. 1 th 1970
Bahaya
dengan benar -Per 555/ Men/ 1995 K3 Pertambangan P
3 S
3 F
3 RL
27 B 21 Tolerable
- Penanganan Keadaan Darurat - Kep 51/Men/1999 Nilai Ambang Batas
- JSA Investigasi Tanah

- Safety Tool Box Meeting (P5M)  
- Operator dan Alat mempunyai SIO dan 
- UU No. 1 th 1970
SILO (Kompetensi Training Centre)
-Per 555/ Men/ 1995 K3 Pertambangan
- Penanganan Keadaan Darurat 3 3 2 18 B 82 Tolerable
- Kep 51/Men/1999 Nilai Ambang Batas
- Gunakan Radio untuk komunikasi 
operator dengan pengawas
- JSA Clearing & Grubbing

- Safety Tool Box Meeting (P5M) - UU No. 1 th 1970
- JSA Pembuatan Site Office - Per 01/Men/1980 K3 Konstruksi  2 1 2 4 C 32 Tolerable
- Sosialisasi Teknik Manual Handling bangunan

- Safety Tool Box Meeting (P5M)
- Operator dan Alat mempunyai SIO dan 
SILO (Kompetensi Training Centre)
- UU No. 1 th 1970
- Gunakan Radio untuk komunikasi 
- Per 01/Men/1980 K3 Konstruksi  3 3 2 18 B 82 Tolerable
operator dengan pengawas
bangunan
- Lakukan pengecekan kadar udara 
dengan menggunakan gas detector
-JSA Penggalian Pondasi
Page 21 of 34
Risk Assesement for
Situation With Control /  Hazard
- Safety Tool Box Meeting (P5M) Peraturan Perundang-
Existing Control
- Operator dan Alat mempunyai SIO dan  Penilaian Risiko Untuk  Code  Risk Reduction 
Verification 
undangan / Government  Situasi Dengan Kontrol
Penurunan 
Kontrol yang ada
SILO (Kompetensi Training Centre) Kode  Bahaya Verifikasi
Regulation
- UU No. 1 th 1970
- Gunakan Radio untuk komunikasi 
- Per 01/Men/1980 K3 Konstruksi  3 3 2 18 Bahaya
B 82 Tolerable
operator dengan pengawas
bangunan P S F RL
- Lakukan pengecekan kadar udara 
dengan menggunakan gas detector
-JSA Penggalian Pondasi

Page 22 of 34
Risk Assesement for
Situation With Control /  Hazard
Peraturan Perundang-
Existing Control Penilaian Risiko Untuk  Code  Risk Reduction 
Verification 
undangan / Government  Situasi Dengan Kontrol
Penurunan 
Kontrol yang ada Kode  Bahaya Verifikasi
Regulation
Bahaya
P S F RL

- Safety Tool Box Meeting (P5M) - UU No. 1 th 1970
- Operator dan Alat mempunyai SIO dan  - Per 01/Men/1980 K3 Konstruksi 
SILO (Kompetensi Training Centre) bangunan
- Gunakan Radio untuk komunikasi  - Per 05/Men/1985 Pesawat angkat dan  3 3 2 18 B 82 Tolerable
operator dengan pengawas angkut 
- Lakukan P2H alat angkat-angkut - UU no 27 Tahun 1997 tentang 
-JSA Mobilisasi dan Load unload pole Mobilisasi

- Safety Tool Box Meeting (P5M)
- Operator dan Alat mempunyai SIO dan  - UU No. 1 th 1970
SILO (Kompetensi Training Centre) - Per 01/Men/1980 K3 Konstruksi 
- Gunakan Radio untuk komunikasi  bangunan
3 3 3 27 B 73 Tolerable
operator dengan pengawas - Per 05/Men/1985 Pesawat angkat dan 
- Lakukan P2H alat angkat-angkut angkut
- Inspeksi lifting tools
-JSA erection Pole

- UU No. 1 th 1970
- Safety Tool Box Meeting (P5M) - Per 01/Men/1980 K3 Konstruksi 
- Gunakan Radio untuk komunikasi  bangunan
pekerja dengan pengawas - Per 05/Men/1985 Pesawat angkat dan 
3 3 3 27 B 53 Tolerable
- Lakukan inspeksi tangga dan fullbody  angkut
harness secara berkala - Permen No 9 Tahun 2016 tentang 
-JSA Install accessories bekerja diketinggian
- Permen per.01/MEN/1980 Pasal 12 -24

Page 23 of 34
- UU No. 1 th 1970 Risk Assesement for
- Safety Tool Box Meeting (P5M) - Per 01/Men/1980 K3 Konstruksi  Situation With Control /  Hazard
Peraturan Perundang-
Existing Control
- Gunakan Radio untuk komunikasi  bangunan Penilaian Risiko Untuk  Code  Risk Reduction 
Verification 
undangan / Government  Penurunan 
Kontrol yang ada
pekerja dengan pengawas - Per 05/Men/1985 Pesawat angkat dan  Situasi Dengan Kontrol Kode  Bahaya Verifikasi
- Lakukan inspeksi tangga dan fullbody  Regulation
angkut
3 3 3 27 B 53 Tolerable
Bahaya
harness secara berkala - Permen No 9 Tahun 2016 tentang 
-JSA Install accessories bekerja diketinggian P S F RL
- Permen per.01/MEN/1980 Pasal 12 -24

- UU No. 1 th 1970
- Safety Tool Box Meeting (P5M) - Per 01/Men/1980 K3 Konstruksi 
- Gunakan Radio untuk komunikasi  bangunan
pekerja dengan pengawas - Per 05/Men/1985 Pesawat angkat dan 
- Lakukan inspeksi tangga dan fullbody  angkut 3 3 3 27 B 48 Tolerable
harness secara berkala - Kep 51/Men/1999 Nilai Ambang Batas 
-JSA Stringging - Permen No 9 Tahun 2016 tentang 
- OHS DOP Working At Height bekerja diketinggian
- Permen per.01/MEN/1980 Pasal 12 -24

- Safety Tool Box Meeting (P5M)
- Operator dan Alat mempunyai SIO dan 
SILO (Kompetensi Training Centre)
- UU No. 1 th 1970
- Gunakan Radio untuk komunikasi 
- Per 01/Men/1980 K3 Konstruksi  3 3 2 18 C 82 Tolerable
operator dengan pengawas
bangunan
- Lakukan pengecekan kadar udara 
dengan menggunakan gas detector
-JSA Penggalian Pondasi

-Safety Tool Box Meeting (P5M) UU No. 1 th 1970                                  
- JSA Pekerjaan Pembesian Pondasi Per 01/Men/1980 K3 Konstruksi  2 2 2 10 C 43 Tolerable
- Sarung tangan katun, safety shoes bangunan

Page 24 of 34
Risk Assesement for
Situation With Control /  Hazard
Peraturan Perundang-
Existing Control Penilaian Risiko Untuk  Code  Risk Reduction 
Verification 
undangan / Government  Situasi Dengan Kontrol
Penurunan 
Kontrol yang ada Kode  Bahaya Verifikasi
Regulation
-Safety Tool Box Meeting (P5M) UU No. 1 th 1970                                  
Bahaya
- JSA Pekerjaan Pembesian Pondasi Per 01/Men/1980 K3 Konstruksi  P
2 S
2 F
2 RL
10 C 43 Tolerable
- Sarung tangan katun, safety shoes bangunan

Page 25 of 34
Risk Assesement for
Situation With Control /  Hazard
Peraturan Perundang-
Existing Control Penilaian Risiko Untuk  Code  Risk Reduction 
Verification 
undangan / Government  Situasi Dengan Kontrol
Penurunan 
Kontrol yang ada Kode  Bahaya Verifikasi
Regulation
Bahaya
P S F RL

- Safety Toolbox Meeting (P5M)
Per 01/Men/1980 K3 Konstruksi 
- JSA Pemasangan Bekisting 3 2 2 7 C 7 Tolerable
bangunan
- Gunakan Sarung Tangan

- Safety Toolbox Meeting (P5M)
- JSA Pemasangan Bekisting Per 01/Men/1980 K3 Konstruksi 
3 3 2 8 C 13 Tolerable
- Gunakan Sarung Tangan dan Safety  bangunan
glasses

- Safety Toolbox Meeting (P5M)
- JSA Erection Structure  UU No. 1 th 1970
- Pastikan Electrical winch, Fullbody  - Per 01/Men/1980 K3 Konstruksi 
harness dan Rope layak untuk digunakan,  bangunan
4 3 1 17 B 68 Tolerable
cek secara berkala - Per 05/Men/1985 Pesawat angkat dan 
- Gunakan Sarung Tangan, Safety Shoes  angkut
dan Safety Glasses
- OHS DOP Working At Height

 UU No. 1 th 1970
- Safety Toolbox Meeting (P5M)
- Per 01/Men/1980 K3 Konstruksi 
- JSA Install HV Aparatus
bangunan
- Gunakan Sarung Tanga, Safety Shoe, 
- Per 05/Men/1985 Pesawat angkat dan 
Safety Glasses 2 3 1 7 C 27 Tolerable
angkut
- Gunakan Teknik Manual Handling yang 
- Permen No 9 Tahun 2016 tentang 
benar
bekerja diketinggian
- OHS DOP Working At Height
- Permen per.01/MEN/1980 Pasal 12 -24
Page 26 of 34
Risk Assesement for
Situation With Control /  Hazard
Peraturan Perundang-
Existing Control  UU No. 1 th 1970 Penilaian Risiko Untuk  Code  Risk Reduction 
Verification 
- Safety Toolbox Meeting (P5M) undangan / Government  Situasi Dengan Kontrol
Penurunan 
Kontrol yang ada
- JSA Install HV Aparatus
- Per 01/Men/1980 K3 Konstruksi  Kode  Bahaya Verifikasi
Regulation
bangunan
- Gunakan Sarung Tanga, Safety Shoe,  Bahaya
- Per 05/Men/1985 Pesawat angkat dan 
Safety Glasses 2
P 3
S 1
F 7
RL C 27 Tolerable
angkut
- Gunakan Teknik Manual Handling yang 
- Permen No 9 Tahun 2016 tentang 
benar
bekerja diketinggian
- OHS DOP Working At Height
- Permen per.01/MEN/1980 Pasal 12 -24

- Safety Toolbox Meeting (P5M) UU No. 1 th 1970
- JSA Stringing Alumunium Conductor - Per 01/Men/1980 K3 Konstruksi 
- Pastikan Electrical winch, Lever Block,  bangunan
Katrol, Fullbody harness dan Rope layak  - Per 05/Men/1985 Pesawat angkat dan 
3 3 1 10 B 85 Tolerable
untuk digunakan, cek secara berkala angkut
- Gunakan Sarung Tangan, Safety Shoes  - Permen No 9 Tahun 2016 tentang 
dan Safety Glasses bekerja diketinggian
- OHS DOP Working At Height - Permen per.01/MEN/1980 Pasal 12 -24

- Toolbox Safety Meeting (P5M) UU No. 1 th 1970
- JSA Setting Panel - Per 12/Men/2015 K3 Listrik di Tempat  2 2 1 5 C 5 Tolerable
- Gunakan Sarung Tangan kerja

- Toolbox Safety Meeting (P5M) UU No. 1 th 1970
- JSA Pulling Cable - Per 12/Men/2015 K3 Listrik di Tempat  2 3 1 7 C 7 Tolerable
- Gunakan Sarung Tangan kerja

- Toolbox Safety Meeting (P5M) UU No. 1 th 1970
- JSA Terminasi - Per 12/Men/2015 K3 Listrik di Tempat 
Page 227 of 343 1 10 C 9 Tolerable
- Gunakan Sarung Tangan kerja
Risk Assesement for
Situation With Control /  Hazard
Peraturan Perundang-
Existing Control Penilaian Risiko Untuk  Code  Risk Reduction 
Verification 
undangan / Government  Situasi Dengan Kontrol
Penurunan 
Kontrol yang ada Kode  Bahaya Verifikasi
Regulation
Bahaya
P S F RL

- Toolbox Safety Meeting (P5M) UU No. 1 th 1970
- JSA Terminasi - Per 12/Men/2015 K3 Listrik di Tempat  2 3 1 10 C 9 Tolerable
- Gunakan Sarung Tangan kerja

Page 28 of 34
Risk Assesement for
Situation With Control /  Hazard
Peraturan Perundang-
Existing Control Penilaian Risiko Untuk  Code  Risk Reduction 
Verification 
undangan / Government  Situasi Dengan Kontrol
Penurunan 
Kontrol yang ada Kode  Bahaya Verifikasi
Regulation
Bahaya
P S F RL

UU No. 1 th 1970
- Per 12/Men/2015 K3 Listrik di Tempat 
kerja                                                        - 
- Toolbox Safety Meeting (P5M)
Per 01/Men/1980 K3 Konstruksi 
- JSA Tie in Alumunium Conductor ke 
bangunan
Existing 1 3 1 10 C 25 Tolerable
- Per 05/Men/1985 Pesawat angkat dan 
- Gunakan Sarung Tangan
angkut
- OHS DOP Working At Height
- Permen No 9 Tahun 2016 tentang 
bekerja diketinggian
- Permen per.01/MEN/1980 Pasal 12 -24

- Toolbox Safety Meeting (P5M)
UU No. 1 th 1970
- JSA Energized
- Per 12/Men/2015 K3 Listrik di Tempat  1 3 1 12 C 43 Tolerable
- Sign Energized
kerja                                                        
- Tag LOTO

- Safety Tool Box Meeting (P5M)
- Operator dan Alat mempunyai SIO dan  UU No. 1 th 1970
SILO (Kompetensi Training Centre) - Per 01/Men/1980 K3 Konstruksi 
- Gunakan Radio untuk komunikasi  bangunan
3 3 2 18 C 82 Tolerable
operator dengan pengawas - Per 05/Men/1985 Pesawat angkat dan 
- Lakukan pengecekan kadar udara  angkut
dengan menggunakan gas detector - Kep 51/Men/1999 Nilai Ambang Batas 
-JSA Penggalian Pondasi Kaki Tower

Page 29 of 34
- Safety Tool Box Meeting (P5M)
- Operator dan Alat mempunyai SIO dan  UU No. 1 th 1970 Risk Assesement for
SILO (Kompetensi Training Centre) - Per 01/Men/1980 K3 Konstruksi  Situation With Control /  Hazard
Peraturan Perundang- Risk Reduction 
Existing Control
- Gunakan Radio untuk komunikasi  bangunan Penilaian Risiko Untuk  Code  Verification 
operator dengan pengawas undangan / Government 
- Per 05/Men/1985 Pesawat angkat dan 
3 3 2 18
Situasi Dengan Kontrol
C Penurunan 
82 Tolerable
Kontrol yang ada Kode  Bahaya Verifikasi
- Lakukan pengecekan kadar udara  Regulation
angkut Bahaya
dengan menggunakan gas detector - Kep 51/Men/1999 Nilai Ambang Batas 
-JSA Penggalian Pondasi Kaki Tower P S F RL

 Safety Tool Box Meeting (P5M)
UU No. 1 th 1970                                  
- Wearing Safety Glasses and Gloves
Per 01/Men/1980 K3 Konstruksi  1 1 2 2 C 1 Tolerable
- JSA Bouwplank Work
bangunan
- Supply water tersedia dengan cukup

-Safety Tool Box Meeting (P5M) UU No. 1 th 1970                                  
- JSA Pekerjaan Pembesian Per 01/Men/1980 K3 Konstruksi  2 2 1 10 C 44 Tolerable
- Gunakan sarung tangan katun bangunan

-Safety Tool Box Meeting (P5M) UU No. 1 th 1970                                  
- JSA Pekerjaan Pemasangan Bekisting Per 01/Men/1980 K3 Konstruksi  3 2 2 7 C 7 Tolerable
- Gunakan sarung tangan katun bangunan

-Safety Tool Box Meeting (P5M)
Per 01/Men/1980 K3 Konstruksi 
- JSA Pekerjaan Pengecoran Pondasi 3 3 2 8 C 13 Tolerable
bangunan
- Gunakan sarung tangan katun
Page 30 of 34
Risk Assesement for
Situation With Control /  Hazard
Peraturan Perundang-
Existing Control Penilaian Risiko Untuk  Code  Risk Reduction 
Verification 
undangan / Government  Situasi Dengan Kontrol
Penurunan 
Kontrol yang ada Kode  Bahaya Verifikasi
Regulation
Bahaya
P S F RL
-Safety Tool Box Meeting (P5M)
Per 01/Men/1980 K3 Konstruksi 
- JSA Pekerjaan Pengecoran Pondasi 3 3 2 8 C 13 Tolerable
bangunan
- Gunakan sarung tangan katun

Page 31 of 34
Risk Assesement for
Situation With Control /  Hazard
Peraturan Perundang-
Existing Control Penilaian Risiko Untuk  Code  Risk Reduction 
Verification 
undangan / Government  Situasi Dengan Kontrol
Penurunan 
Kontrol yang ada Kode  Bahaya Verifikasi
Regulation
Bahaya
P S F RL

UU No. 1 th 1970
- Safety Toolbox Meeting (P5M) - Per 01/Men/1980 K3 Konstruksi 
- JSA Erection Structure Tower bangunan
- Pastikan Electrical winch, Fullbody  - Per 05/Men/1985 Pesawat angkat dan 
harness dan Rope layak untuk digunakan,  angkut 4 3 1 17 B 68 Tolerable
cek secara berkala - Permen No 9 Tahun 2016 tentang 
- Gunakan Sarung Tangan, Safety Shoes  bekerja diketinggian
dan Safety Glasses - Permen per.01/MEN/1980 Pasal 12 -24

UU No. 1 th 1970
- Safety Toolbox Meeting (P5M) - Per 01/Men/1980 K3 Konstruksi 
- JSA Stringing Alumunium Conductor bangunan
- Pastikan Electrical winch, Lever Block,  - Per 05/Men/1985 Pesawat angkat dan 
Katrol, Fullbody harness dan Rope layak  angkut 3 3 1 10 B 85 Tolerable
untuk digunakan, cek secara berkala - Permen No 9 Tahun 2016 tentang 
- Gunakan Sarung Tangan, Safety Shoes  bekerja diketinggian
dan Safety Glasses - Permen per.01/MEN/1980 Pasal 12 -24

UU No. 1 th 1970
- Per 12/Men/2015 K3 Listrik di Tempat 
kerja                                                        - 
- Toolbox Safety Meeting (P5M) Per 01/Men/1980 K3 Konstruksi 
- JSA Tie in Alumunium Conductor ke  bangunan
1 3 1 10 C 25 Tolerable
Existing - Per 05/Men/1985 Pesawat angkat dan 
- Gunakan Sarung Tangan angkut
- Permen No 9 Tahun 2016 tentang 
bekerja diketinggian
- Permen per.01/MEN/1980 Pasal 12 -24

Page 32 of 34
UU No. 1 th 1970 Risk Assesement for
- Per 12/Men/2015 K3 Listrik di Tempat  Situation With Control /  Hazard
Peraturan Perundang-
Existing Control kerja                                                        -  Penilaian Risiko Untuk  Code  Risk Reduction 
Verification 
undangan / Government  Situasi Dengan Kontrol
Penurunan 
Kontrol yang ada
- Toolbox Safety Meeting (P5M) Per 01/Men/1980 K3 Konstruksi  Kode  Bahaya Verifikasi
- JSA Tie in Alumunium Conductor ke  Regulation
bangunan
1 3 1 10 Bahaya
C 25 Tolerable
Existing - Per 05/Men/1985 Pesawat angkat dan 
- Gunakan Sarung Tangan angkut P S F RL
- Permen No 9 Tahun 2016 tentang 
bekerja diketinggian
- Permen per.01/MEN/1980 Pasal 12 -24

- Toolbox Safety Meeting (P5M)
UU No. 1 th 1970
- JSA Energized
- Per 12/Men/2015 K3 Listrik di Tempat  1 3 1 12 C 43 Tolerable
- Sign Energized
kerja                                                        
- Tag LOTO

- Safety Tool Box Meeting (P5M)
- Wearing Mask and Leather Glove - UU No. 1 th 1970
2 2 2 8 C 10 Tolerable
- JSA Grounding Installation PUIL 2000: 3.18; 3.19 page 80
- Radio Komunikasi

- Safety Tool Box Meeting (P5M)
- Dust Mask, Hand Glove
- UU No. 1 th 1970 1 1 2 2 C 10 Tolerable
- JSA Duct Bank Installation
- Blower / Exhaust Fan

Disetujui oleh :
PT. Hein Global Utama

Page 33 of 34
Risk Assesement for
Situation With Control /  Hazard
Peraturan Perundang-
Existing Control Penilaian Risiko Untuk  Code  Risk Reduction 
Verification 
undangan / Government  Situasi Dengan Kontrol
Penurunan 
Kontrol yang ada Kode  Bahaya Verifikasi
Regulation
Bahaya
P S F RL
Disetujui oleh :
PT. Hein Global Utama

___________________________
Project Coordinator

Page 34 of 34