Osp Proposed Catenary Plan

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

CONTRACTOR:

TECHNOLOGY AND
INDUSTRIAL SUPPLIES,
INC.
112.70m 22.30m

CONCRETE POLE (10.0m) STRAIGHT SUSPENSION CLAMP MESSENGER WIRE 6M Rm 2B Dona Sebastiana Bldg., #1767 Evangelista
St., Barangay Bangkal, Makati City
2A POLE CLAMP
Date:
Surveyed/Designed by : HECTOR S. SAN JUAN
OSP SURVEYOR/CAD OPERATOR
CA POLE CLAMP
Date:
Checked by : ABNER M. BURAYAG
INSULATOR STRAIN OSP Engineer

1.50m 1.50m Date:


96C FOC(FIG. 8) AMOR T. ESPINOSA

8.50m
Noted by :
GUY GRIP 6M OSP Team Leader

Date:
Recommended by : RANEL M. ESPINOSA
SEE BLOW UP DETIALS OSP Engineering Head

SHEET NO. 4
PROJECT TITLE
G.L OUTSIDE PLANT DESIGN
UNCHOR ROD

1.50m
PROVINCE OF LAGUNA AND QUEZON
SAN PABLO TO LUCBAN
UNCHOR BLOCK BACKBONE PROJECT
PROPOSED CATENARY CONSTRUCTION
AT LILIW BRIDGE
10.0 m 10.0 m 10.0 m
CC PLAN CC CC
DETAILED PLAN
AS PLAN

Revision Date
- - -

- - -
CATENARY CONSTRUCTION DETAILS
NOT TO SCALE
- - -

OWNER/PROPONENT:

CONVERGE
I C T S O L U T I O N S I N C.

# 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)


Barangay Ugong, Pasig City Philippines
Date:
Surveyed/Designed by : MARK WILL BONIFACIO
OSP Engineer

Date:
Checked by: JAEMI DEMISON
OSP Team Leader

Date:
Noted by: ALDRIN SAPULPAYA
OSP Planning & Engineering Head

Date:
Recommended by: EDWIN C. MABITAZAN
Engineering Head

Work Order No. Sheet Content Sheet No.

3
4

You might also like