CONSTRUCTION OF SIGNAL FREE JUNCTION AT NEW AZADI CHOWK,

LAHORE

INSPECTION REPORT
BY
QUALITY INSPECTION TEAM, NESPAK

APRIL, 2014

National Engineering Services Pakistan (Pvt.) Limited


1-C, Block ‘N’, Model Town Extension, Lahore – Pakistan
Table of Contents

S. No. Description Page No.

1. General 1
2. Project Visiting Team 2
3. Project Description 2
4. Site Staff 3
5. Physical Progress 3
6. Quality Control 3
7. Schedule 4
8. Observations by QIT 5
9. Annexures
i. Annex-1 Picture of the Model of the Project
ii. Annex-2 Perspective View of Elevated Roundabout with
Proposed False Cable Stayed System
iii. Annex-3 List of Site Staff
iv. Annex-4 Physical Progress
v. Annex-5 Quality Control Record
vi. Annex-6 CPM Schedule
vii. Annex-7 Petrographic Analysis
viii. Annex-8 Project Photographs