Republic of the Philippines

Department of Education
Region XII
Division of Sultan Kudarat
LUTAYAN NATIONAL HIGH SCHOOL
SDRRM

PROGRAM PROPOSAL

I.TITLE: CONTEST FOR BEST SDRRM IMPLEMENTOR CLASSROOM

II.RATIONALE: The Philippines frequently experiences seismic and volcanic tremors because it
lies along the Pacific Ring of Fire, which is an area in the basin of the Pacific Ocean where a
large number of earthquakes occur. In recent months, for example, a number of earthquakes
shook parts of the country. For us in school, it is best to be prepared and ready for all
eventualities, because no one can predict when earthquakes will happen. Schools cannot be
closed in advance due to earthquakes; neither can we suspend classes, like we do when there’s
a storm warning. However, with proper training and advance planning, everyone in our school
community can be prepared to react appropriately during and after the occurrence of an
earthquake.
The best approach is to create a comprehensive, all-hazards emergency plan and implement
earthquake drills so we can instill in the minds of our students the correct procedures to be
followed during the actual occurrence. All these will help ensure that there will be no confusion
or panic among students and faculty members.

IIII. OBJECTIVES

1. To conduct weekly drills in School.


2. Improve student response and Discipline during National Simultaneous earthquake
drill.
3. Conduct a contest for School Best DRRM Implementer Classroom per grade level.
4. Award Best DRRM Best Implementer classroom

IV. DATE: Every Friday

V. VENUE: LUTAYAN NATIONAL HIGH SCHOOL

VI. PARTICIPANTS

All classroom by Grade level…

VII. Board of Judges

a. Selected School DRRM committees

VIII. CRITERIA FOR JUDGING

CRITERIA TOTAL
Discipline Participation SDRRM Corner Performance
30% 20% 20% 30% 100%
IX. AWARDING AND PRIZES

a. Certificate every Monday of the week


b. Banner To be Posted outside Classroom( Transferrable)

VII. BUDGETARY REQUIREMENTS


A. SOURCE OF FUNDS: MOOE( DRRM ANNUAL BUDGET- P1,000.00)
B. BUDGET PROPUSAL
PROPUSE EXPENSES AMOUNT
TARPAULINE( 2X3 FT) P 100.00 X6 P 600.00
CERTIFICATES P 400.00
P 1,000.00

VIII. EXPECTED OUTPUT

Students will execute proper duck cover and hold, evacuate to the evacuation site with
full discipline and participate actively in Earthquake drill simulation.

Prepared by: ABUBAKAR T. SALMO


SDRRMO

REVIEWED AND APPROVED BY:

EDWIN L. LAGLIVA
PRINCIPAL I FUNDS AVAILABLE:

BABES M. AMAN
BOOKEEPER
SCHOOL DRRM CAMP ACTIVITY MATRIX

Time Topic/ Activity Content Methodology Facitator


Day 1
7:00-8:30 A.M. Arrival
Registration
8:00-9:30 A.M. Opening Program -Invocation
-National Anthem School DRRM
-Welcome Address Committees
-Acknowledgment -Groupings and
of Participants Yellings
-Messages
9:00 – 10:00 Groupings Grouped Per
hazard (4 groups)
10:00- 11:45 Convention on the UNRC ( Video Plenary Lecture MDRRMO
right of every child Presentation
11:45- 1:00 PM LUNCH BREAK

1:00- 5:00 Disaster Risk Thematic Session


Reduction and 1. Basic terms on
Climate Change Earthquake, Fire,
Learning Station Flood and What to
1 hr each LS do during and
after the disaster.
2.. Climate Change
Adaptation
3. Basic Fire Safety
And electrical
Safety.
4. School
Watching Team
Duties and
Responsibilities

DAY 2
7:30-10:00 Basic First Aid Sir Boyet Galaura
Bandaging and
Splinting
11:00-12:00 Basic Search and Sir Al Ryan Limbo
Rescue Technique
1:00-2:30 Drills and BFP and MDRRMO
Simulation with
First aid
integration
2:30-3:30 Jingle Presentation Participants
per Group
3:30-4:30 Closing Program DRRM Committees
Prepared by: EDWIN L. LAGLIVA
PRINCIPAL I

REVIEWED AND CHECKED:

ROMMEL M. LOTILLA
SEPS-HRD RECOMMENDING APPROVAL:

RUTH L. ESTACIO, Ph.D.,CESE


Asst School Division Superintendent

NOTED :

RAFAEL C. FONTANILLA , Ph.D.,CESO V


School Division Superintendent
BASURA KO SAGOT KO PROJECT
Republic of the Philippines
Department of Education
Region XII
Division of Sultan Kudarat
LUTAYAN NATIONAL HIGH SCHOOL
OFFICE OF THE SUPREME STUDENT GOVERNMENT

FINANCIAL REPORT

PROJECT TITLE: KING AND QUEEN COVERED GATE PROJECT


SOURCE OF FUNDS: KING AND QUEEN OF HEARTS 2015
PERIOD COVER: SCHOOL YEAR 2015-2016

ITEMIZED BUDGETARY REQUIREMENTS

Items Estimated Price REMARKS


Quantity Per unit TOTAL

6 G.I. PIPE#1 S 20 590.00 3, 540.00


6 G.I. PIPE#1&1/4 785 4,710.00
4 G.I. PIPE#3 2380 9,520.00
5 PLAIN RB 12:13 178 890
8 C.P.L 2X5 418 3, 349.00
8 PLAIN RB 3/16X2 590 4,720.00
7 KG W.ROD 95 665.00
7 PLAIN RB 16 MM 490 3, 430.00
5 A.BAR 1/4X1 1/2 655 3,275.00
2 GAL GREEN PAINT 570.60 1,140
15 CEMENT 260 3,900.00

1 P.BRUSH 28 28
Total 39,167.00
Labor 15,000.00

Total Cost 54, 960.00 Implemented

Prepared by: KAREN U. UMADHAY


SSG PRESIDENT

NOTED BY: ABUBAKAR T. SALMO


SSG ADVISER
CHECKED BY:
PANGI P. BALUBUGAN Ph.D.
PRINCIPAL –II
FINANCIAL REPORT

Fund Raising Project of SSG

(S.Y. 2015-2016)

I. Source of Fund

A. King and Queen of Hearts 2016

II.TOTAL MONEY EARNED FROM MONEY SHOWDOWN P 34,714.00

III. Expenses

TrophiesCrowns, scepters, flowers and leis

for the candidates of King and Queen of Hearts ……..……………………….P 4, 404.75

stagedecoration………………………………………………………………………………..P 1,500.00

Gasoline (used for generator)……………………………………………………………P200.00

Transportation ………………………………………………………………………….……….P500.00

Sashes………………………………………………………………………………………….…….P2, 000.00

Labor for generator……………………………………………………………………..…….P150.00

Tarpaulin………………………………………………………………………………………..……P 1000.00

Contingency fund………………………………………………………………………………..P1,000.00

Total Expenses: …………………….……………………………………………………………P10, 754.00

\
Prepared by: KAREN U. UMADHAY
SSG PRESIDENT

NOTED BY: ABUBAKAR T. SALMO


SSG ADVISER
CHECKED BY:
PANGI P. BALUBUGAN Ph.D.
PRINCIPAL –II
Republic of the Philippines
Department of Education
Region XII
Division of Sultan Kudarat
LUTAYAN NATIONAL HIGH SCHOOL
OFFICE OF THE SUPREME STUDENT GOVERNMENT

FINANCIAL REPORT

PROJECT TITLE: BASURA MO SAGOT KO PROJECT


SOURCE OF FUNDS: PTCA(SSG Fund)
PERIOD COVER: SCHOOL YEAR 2015-2016

ITEMIZED BUDGETARY REQUIREMENTS


Estimated Price
Quantity Items Per unit TOTAL REMARKS

12 pcs Roof(12 ft.g.40 ) 372 4, 464 .00


4 pcs G.I pipe 1 ¼ xs.40 935 3,980 .00

5 pcs Roundbar(10mm) 150 750 . 00


3klos Umbrella tie 190 327.00. 00
3 klos Welding rod 100 300.00
1 Gal Primer Paint 750 750.00
Total 10,571.00
Labor 5, 000.00

Total Cost 15, 571 .00 IMPLEMENTED

Prepared by: KAREN U. UMADHAY


SSG PRESIDENT

NOTED BY: ABUBAKAR T. SALMO


SSG ADVISER
CHECKED BY:
PANGI P. BALUBUGAN Ph.D.
PRINCIPAL -II
TRAININGS AND SEMINARS

FINANCIAL REPORT

VENUE: PRES. QUIRINO NHS


SOURCE OF FUNDS: PTCA(SSG Fund)
PERIOD COVER: APRIL 21-26, 2015

No. of Participant Travel Allowance Registration Total remarks

3 1500 45000 6000 Accomplished


VENUE: CEBU CITY
SOURCE OF FUNDS: PTCA(SSG Fund)
PERIOD COVER: NOVEMBER 19-22, 2015

No. of PLANE Travel Registration Total remarks


Participant TICKET Allowance

3 21,000.00 10,000.00 5500.00 36,500.00 Accomplished

Prepared by: KAREN U. UMADHAY


SSG PRESIDENT

NOTED BY: ABUBAKAR T. SALMO


SSG ADVISER
CHECKED BY:
PANGI P. BALUBUGAN Ph.D.
PRINCIPAL -II