Commonwealth FINAL5 C
Commonwealth FINAL5 C
MMDA
221,759 Vehicles per day
UP
95 METERS ROAD RIGHT OF WAY
DONA
CARMEN
8 KM
QMC
ROAD PAVEMENT BEFORE
THE DEVELOPMENT PROJECT
95 m
WHY NOT?
REASON NO. 1
Safety on High Speed Conflict
10
9
8
7
6
5
4
3
2
1
EXISTING WIDEST ARTERIAL ROADS IN
MODERN COUNTRIES IN THE WORLD
Exceptionally wide I-75 in Atlanta,
Vehicle Conflict on
Junctions
20-LANE ROAD CROSSING WITH A 4-LANE ROAD
4 full intersections
8 T intersections
20 - LANE ROAD CROSSING WITH A 4 - LANE ROAD
228
VEHICLE TO
VEHICLE
CONFLICTS
222,000 Vehicles per day
11,000 Vehicles during peak hour
5 Lanes per direction
2. CONSTRUCT INTERCHANGES
1. TRAFFIC SIGNAL
WITH SIGNAL LIGHTS or FOOT
LIGHTS
BRIDGE
5 M + 2.5 M 1 to 3 B
(Maintenance Expenses)
2 1 5 4 3 2 1 2 1
U-TURN U-TURN PRIVATE PRIVATE PRIVATE PRIVATE PRIVATE PUV PUV
B A
BVR 678 BVR 678 BVR 678
BVR BVR BVR DSF 253
VHY 857
VRY 857 678 678 678
BIKE LANE
PLANTING STRIP
FOOT BRIDGE
WALKWAY
OVERHEAD SIGNS
2 PUV/BUS LANES
5 PRIVATE VEHICLE LANES HIGH MAST STREET LIGHTING
BUILDING
SETBACK
8.00 m
– ROAD INVENTORY
SURVEY (RIS)
TRAFFIC ENGINEERING DESIGN
DESIGN DATA
– TRAFFIC SURVEY
– PEDESTRIAN SURVEY
TRAFFIC ENGINEERING DESIGN
STRUCTURAL DESIGN
Using STAAD
TRAFFIC ENGINEERING DESIGN
ROADWAY DESIGN
Using CADD
TRAFFIC ANALYSIS
Using Traffic Simulation and
Path Planner Software
1. Commonwealth Ave.
2. EDSA
3. Quezon Ave.
4. Marcos Highway
5. Mac Arthur Highway
6. Carlos P. Garcia Ave (C5)
7. Radial Road 10 (R-10)
THE DESIGNERS HOPE TO ACHIEVE THE
FOLLOWING TARGETS: