Professional Documents
Culture Documents
Business Process Procedure: Trigger
Business Process Procedure: Trigger
Overview
Trigger:
It is necessary to edit a catalog (code group and associated codes)..
Structure
A catalog contains both code groups and selected sets, both of which are stored at the same hierarchical
level. Code groups, however, are defined at the client level; while selected sets are defined at the plant
level. The catalog hierarchy is as follows:
• A code group contains one or more codes. Since each code is assigned to a code group, codes are
often referred to as "group codes" in the ECC System.
• A selected set contains a combination of different codes that originate from different code groups.
• Codes make up the lowest level of the catalog hierarchy. Codes are used in both code groups and
selected sets.
You define codes in code groups and use the codes in selected sets (for example, to describe
characteristic attributes such as colors, shapes, surface characteristics), defect causes, or usage
decisions.
Page 1
- Procedural Steps
Via Menus Logistics > Plant Maintenance > Maintenance Processing >
Environment > Catalog> Edit
Transaction Code QS41
1.2. On screen “Edit catalog: Initial Screen”, enter information in the fields as
specified in the table below:
Page 1
decisions. A code group is catalog. Alternatively, you may
defined at the client level. use the pull-down arrow for
potential selections.
Click on the Create/Change
icon
Note: Click on the “New entries” icon to create a new Code Group.
Page 1
make sure
it is
released.
Ltex for Long Text O Add long text for the group code
Code by pressing the “Long Text” key
Group (pencil + paper symbol), entering
the text, and pressing the green
arrow key to return. You will then
get a message that the text has
been transferred
Select a Code Group entry
(Select the line) and double
click on “Codes” folder.
Note: Delete entry [Shift+F2]: Select the entry to be deleted (button next to Code Group name) and then
click on the trash can icon, or press [Shift+F2].
Page 1
the text, and pressing the green
arrow key to return. You will then
get a message that the text has
been transferred
Save
The system will respond with the message that data saved.
Prepared By Johnson
Line of Business Power Gas
Process Area Manage Plant Maintenance
Last Changed on
Last Changed by
Page 1