DRAFTED BY: ENGR.

MARK ROGER HUBERIT II

DATE: July 12, 2019 PERSPECTIVE VIEW -


MINE OPERATION CENTRE & MINE OFFICE CHECKED BY: STRUCTURAL ASSEMBLY FAB-01
ERECTION, FABRICATION & CONNECTION DETAILS
APPROVED BY:
SCOPE: FABRICATION DETAILS
B3 - GRID-D12-LVL2 B3 - GRID -D23-LVL2
B3-GRID-D34-LVL2

TBR1-GRID-D-1-LVL2

TBR1-GRID-D
4-2LVL

B6-GRID-DE-3-2LVL
B6-GRID-DE-2-2LVL

B6-GRID-DE-4-2LVL
B6-GRID-DE-1-2LVL
2.52 m

B6-GRID-DE-12-2LVL B6-GRID-DE-23-2LVL B6-GRID-DE-34-2LVL

TBR1-GRID E TBR1-GRID-E
1-2LVL 3-2LVL
TBR1-GRID-E
TBR1-GRID-E 4-2LVL
TBR1-GRID-E-1-S-2LVL
2-2LVL
TBR1-GRID-E
3-2LVL

B6-GRID-E-12-2LVL B6-GRID-E-23-2LVL B6-GRID-E-34-2LVL

2.44 m+/- 2.44 m +/- 2.44m+/-

7.314 m+/-

LEGELND:
YELLOW - B3
GREEN - B4 2ND LEVEL PLAN
CYAN/BABY BLUE - B6
GRAY/WHITE - CROSS BRACES/TBR1

REVISIONS

02
MM/DD/YY REMARKS
1 _ _ /_ _ /_ _ ...

08
2ND FLOOR LEVEL - STRUCTURAL ASSEMBLY 2
3
_ _ /_ _ /_ _ ...
_ _ /_ _ /_ _ ...
MINE OPERATION CENTRE & MINE OFFICE MINE 4 _ _ /_ _ /_ _ ...

F
STRUCTURAL FABRICATION DETAILS 5 _ _ /_ _ /_ _ ...
GRID -LINE -D
GRID LINE- E

GRID L
INE -4

GRID L
INE- 3

C2-GRID-E4

GRID L
I NE 2

B4-GRID-E-34-2LVL
B6-GRID1-DE-RLVL
ROO
F BEA GRID
M LE L I NE
VEL( -1
RL V
L)

B4-GRIDE-23-2LVL

B4-GRID-E-12-2LVL
B6-GRID1-DE-2LVL

2ND
FLO
OR
LEV
EL (2L
VL)

C2-GRID-E1

GR
OU
NA ND F
TU L
RA OOR
LG
RO LEVE
UN L
D L (GLV
EVE L)
L

REVISIONS

03
MM/DD/YY REMARKS
1 _ _ /_ _ /_ _ ...
FLOOR ELEVATION PROFILE - STRUCTURAL ASSEMBLY

08
2 _ _ /_ _ /_ _ ...
3 _ _ /_ _ /_ _ ...
MINE OPERATION CENTRE & MINE OFFICE MINE 4 _ _ /_ _ /_ _ ...

F
STRUCTURAL FABRICATION DETAILS 5 _ _ /_ _ /_ _ ...
B3 - TYPICAL ASSEMBLY DETAILS

CUT SECTION-ISO VIEW B3 - TYPICAL CONNECTION


DETAILS - BEAM TO COLUMN

REVISIONS

04
MM/DD/YY REMARKS
1 _ _ /_ _ /_ _ ...

08
2 _ _ /_ _ /_ _ ...
3 _ _ /_ _ /_ _ ...
MINE OPERATION CENTRE & MINE OFFICE MINE 4 _ _ /_ _ /_ _ ...

F
STRUCTURAL FABRICATION DETAILS 5 _ _ /_ _ /_ _ ...
B3 - CONNECTING PLATE DETAILS
AND BOLT ASSEMBLY

B3 - TYPICAL CONNECTION
DETAILS - BEAM ASSEMBLY

B3 - TYPICAL CONNECTION
DETAILS - BEAM ASSEMBLY

REVISIONS

05
MM/DD/YY REMARKS
1 _ _ /_ _ /_ _ ...

08
B3 - TYPICAL DETAILS AND ASSMEBLY 2 _ _ /_ _ /_ _ ...
3 _ _ /_ _ /_ _ ...
MINE OPERATION CENTRE & MINE OFFICE MINE 4 _ _ /_ _ /_ _ ...

F
STRUCTURAL FABRICATION DETAILS 5 _ _ /_ _ /_ _ ...
LAP PLATES
10mm THK.
290mm X 100mm

TYPICAL HOLES
FOR BOLT 22mmDIAMETER

TYPICAL HOLES FOR BOLTS - 22MM DIAMETER

ISO BOLTS & PLATE CONNECTION ASSEMBLY

LAP PLATES
10mm THK.
290mm x 100mm
8-BOLTS 20mm DIAMETER
CONNECTING PLATE 10mm THK
100mm x 290mm 0.12 m

0.20 m
0.06 m

Connecting plate 10mm THK. Diameter 200mm x 120mm

0.11 m
8-BOLTS 20mm DIAMETER
0.29 m
0.50 m 1.20 m 0.50 m

B3 - GRID-D12- B3 - GRID-D12-2LVL-Center B3 - GRID-D12-


2LVL-Left 2LVL-Right

3 sets -B3 -ALONG GRID -D TYPICAL ASSEMBLY

REVISIONS

06
MM/DD/YY REMARKS
1 _ _ /_ _ /_ _ ...

08
B3 - FABRICATION DETAILS 2
3
_ _ /_ _ /_ _ ...
_ _ /_ _ /_ _ ...
MINE OPERATION CENTRE & MINE OFFICE MINE 4 _ _ /_ _ /_ _ ...

F
STRUCTURAL FABRICATION DETAILS 5 _ _ /_ _ /_ _ ...
m
0.29m
0.10

ISO BOLTS & PLATE CONNECTION ASSEMBLY

8-BOLTS 20mm DIAMETER


CONNECTING PLATE 10mm THK
100mm x 290mm 0.12 m

0.20 m
0.06 m

Connecting plate 10mm THK. Diameter 200mm x 120mm

0.11 m
8-BOLTS 20mm DIAMETER
0.29 m
0.50 m 1.20 m 0.50 m

B3 - GRID-D23- B3 - GRID-D23-2LVL-Center B3 - GRID-D23-


2LVL-Left 2LVL-Right

3 sets -B3 -ALONG GRID -D TYPICAL ASSEMBLY

REVISIONS

07
MM/DD/YY REMARKS
1 _ _ /_ _ /_ _ ...

08
B3 - FABRICATION DETAILS 2
3
_ _ /_ _ /_ _ ...
_ _ /_ _ /_ _ ...
MINE OPERATION CENTRE & MINE OFFICE MINE 4 _ _ /_ _ /_ _ ...

F
STRUCTURAL FABRICATION DETAILS 5 _ _ /_ _ /_ _ ...
m
0.29m
0.10

ISO BOLTS & PLATE CONNECTION ASSEMBLY

8-BOLTS 20mm DIAMETER


CONNECTING PLATE 10mm THK
100mm x 290mm 0.12 m

0.20 m
0.06 m

Connecting plate 10mm THK. Diameter 200mm x 120mm

0.11 m
8-BOLTS 20mm DIAMETER
0.29 m
0.50 m 1.20 m 0.50 m

B3 - GRID-D34- B3 - GRID-D34-2LVL-Center B3 - GRID-D34-


2LVL-Left 2LVL-Right

3 sets -B3 -ALONG GRID -D TYPICAL ASSEMBLY

REVISIONS

08
MM/DD/YY REMARKS
1 _ _ /_ _ /_ _ ...

08
B3 - FABRICATION DETAILS 2
3
_ _ /_ _ /_ _ ...
_ _ /_ _ /_ _ ...
MINE OPERATION CENTRE & MINE OFFICE MINE 4 _ _ /_ _ /_ _ ...

F
STRUCTURAL FABRICATION DETAILS 5 _ _ /_ _ /_ _ ...