Earth work Length of CC


Cost of Road Road / Cocrete Cost of CC Road
Vidhan Length (km) Formation Carriage way Per Km Crust Thickness in Length of Cost of B.T. Road
S. NO. District Grant Name of Road per KM (in / Cocrete Block
Sabha Width (m) width (m) Quantity i/c mm B.T. Road (in Lakhs) Block
Lakhs) Pavement
Subgrade Pavement

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
BC - 30
DBM - 50
WMM - 250
GSB - 180
USHAPURA-
SIKANDARI CC Block - 80
-MOHAMDPUR Sand Bed - 40
LONDIYA- WMM - 250
SINGAWADA- GSB - 250
1 Indore Depalpur 17.370 10.00 5.50 8163.55 14.38 1009.736 70.22 2.99 320.00
NOGAWA-PANTH
BADODIYA-ROULAI-
KALASURA- BETMA
ROAD (MP-MDR-45-
17)
SFC-
Earth work Length of CC
Cost of Road Road / Cocrete Cost of CC Road
Vidhan Length (km) Formation Carriage way Per Km Crust Thickness in Length of Cost of B.T. Road
S. NO. District Grant Name of Road per KM (in / Cocrete Block
Sabha Width (m) width (m) Quantity i/c mm B.T. Road (in Lakhs) Block
Lakhs) Pavement
Subgrade Pavement
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
BC - 30
DBM - 50
WMM - 250
GSB - 180

CC Block - 80
Sand Bed - 40
Simrol- Udainagar WMM - 250
1 Indore Mhow Road (MP-MDR-45- 20.400 10.00 5.50 8507.44 GSB - 250 19.48 1447.310 74.32 0.93 115.46
28)
SFC-
Earth work Length of CC
Cost of Road Road / Cocrete Cost of CC Road
Vidhan Length (km) Formation Carriage way Per Km Crust Thickness in Length of Cost of B.T. Road
S. NO. District Grant Name of Road per KM (in / Cocrete Block
Sabha Width (m) width (m) Quantity i/c mm B.T. Road (in Lakhs) Block
Lakhs) Pavement
Subgrade Pavement
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
BC - 30
DBM - 50
WMM - 250
GSB - 180
Jamali-Thalaiya-
Sitapata-Kadampur- CC Block - 80
1 Indore Mhow Chainpura -Khedi 17.020 10.00 5.50 9494.36 Sand Bed - 40 14.80 1512.150 102.17 2.22 288.38
Road (MP-MDR-45- WMM - 250
29) GSB - 250
SFC-
Earth work Length of CC
Cost of Road Road / Cocrete Cost of CC Road
Vidhan Length (km) Formation Carriage way Per Km Crust Thickness in Length of Cost of B.T. Road
S. NO. District Grant Name of Road per KM (in / Cocrete Block
Sabha Width (m) width (m) Quantity i/c mm B.T. Road (in Lakhs) Block
Lakhs) Pavement
Subgrade Pavement
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
BC - 30
DBM - 50
WMM - 250
GSB - 180
Chandawad -
1 Dhar Dharampuri Dhamnod Road (MP- 11.270 10.00 5.50 8893.25 CC Block - 80 9.06 736.670 81.35 2.21 164.98
MDR-46-22) Sand Bed - 40
WMM - 250
GSB - 250
SFC-
Earth work Length of CC
Cost of Road Road / Cocrete Cost of CC Road
Vidhan Length (km) Formation Carriage way Per Km Crust Thickness in Length of Cost of B.T. Road
S. NO. District Grant Name of Road per KM (in / Cocrete Block
Sabha Width (m) width (m) Quantity i/c mm B.T. Road (in Lakhs) Block
Lakhs) Pavement
Subgrade Pavement
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

BC - 30
DBM - 50
WMM - 250
GSB - 180

CC Block - 80
Sand Bed - 40
WMM - 250
GSB - 250

Nisrapur-Padiyal-Aali-
1 Dhar Kukshi Dahi Road (MP-MDR- 47.570 10.00 5.50 9771.59 47.32 3868.910 81.76 0.25 34.04
46-27)
SFC-EFC PUBLIC WORKS DEPARTMENT
Other Cost (Rs. in Lakhs) Drain Culverts Medium Major
Cost of Retaining Wall
road per & Toe Wall New
km (in Cost(in Lakhs)
Lakhs) Length Costs (in Per Meter Type of Type of
Name of Item Costs (in Lakhs) (Meter) Type of Culverts Nos. Cost Nos.
Lakhs) Cost Structure Structure
No. Cost Cost per CD

16 17 18 19 20 21 22 23 24 25 26 27 28 29
Traffic Sign HPC 1 Row 1000 RCC Box (2x6x4
13.96 2 4.47 2.24 2 150.64
Boards Junction M)
Road Marking & RCC Box (2x3x3
41.12 HPC 1 Row 1000 16 35.76 2.24 1 34.22
Delineator M)
KM & boundary RCC Box (3x3x3
0.87 HPC 2 Row 1000 9 30.60 3.40 1 40.56
Stone M)
W Beam Crash 12.26 HPC 3 Row 1000 2 9.15 4.58
107.02341 Barrier 400 11.81 0.03 178.35
Utility Duct 11.21 RCC Box (1x4x3 M) 2 59.33 29.67

RCC Box (1x6x3 M) 2 80.97 40.48

RCC Box (1x6x4 M) 4 219.12 54.78


Total 79.42 Total 37 439.40 Total 4 225.42 Total 0
SFC-EFC PUBLIC WORKS DEPARTMENT
Cost of Other Cost (Rs. in Lakhs) Drain Culverts Medium Major
Retaining Wall
road per
Length Costs (in Per Meter & Toe Wall New Type of Type of
km (in Name of Item Costs (in Lakhs) (Meter) Type of Culverts Nos. Cost Nos.
Lakhs) Cost Cost(in Lakhs) No. Cost Cost per CD Structure Structure
Lakhs)
16 17 18 19 20 21 22 23 24 25 26 27 28 29
Traffic Sign HPC 1 Row 1000 RCC Slab ( 2 x
15.96 2 4.47 2.24 1 83.29
Boards Junction 10.0 M)
Road Marking & RCC Slab ( 3 X 8.0
17.77 HPC 1 Row 1000 11 24.59 2.24 1 88.19
Delineator M)
KM & boundary HPC 1 Row 1000 RCC Slab ( 3 X
0.83 7 13.09 1.87 1 175.75
Stone -10M 14M)
W Beam Crash RCC Slab ( 2 X 16
54.50 HPC 2 Row 1000 5 17.00 3.40 1 143.47
124.82 Barrier 0 0 0.00 41.16 M)
HPC 2 Row 1000 -
Utility Duct 8.11 1 3.00 3.00
12M
RCC Slab ( 1 x 4.0 1 33.51 33.51
M)
RCC Slab ( 1 x 6.0 2 75.78 37.89
M)
Total 97.17 Total 29 171.44 Total 4 490.70 Total 0
SFC-EFC PUBLIC WORKS DEPARTMENT
Cost of Other Cost (Rs. in Lakhs) Drain Culverts Medium Major
Retaining Wall
road per
Length Costs (in Per Meter & Toe Wall New Type of Type of
km (in Name of Item Costs (in Lakhs) (Meter) Type of Culverts Nos. Cost Nos.
Lakhs) Cost Cost(in Lakhs) No. Cost Cost per CD Structure Structure
Lakhs)
16 17 18 19 20 21 22 23 24 25 26 27 28 29
Traffic Sign HPC 1 Row 1000 RCC Slab ( 1 x 8.0
17.06 3 6.71 2.24 4 187.88
Boards Junction M)
Road Marking & RCC Slab ( 3x
18.27 HPC 1 Row 1000 27 60.35 2.24 1 122.56
Delineator 10.0 M)
KM & boundary RCC Slab ( 3x 8.0
0.92 HPC 2 Row 1000 6 20.40 3.40 1 88.19
129.90 Stone 0 0 0.00 77.74 M)
W Beam Crash RCC Slab ( 1 x 3.0
59.61 1 27.55 27.55
Barrier M)
RCC Slab ( 1 x 4.0
Utility Duct 13.54 2 67.02 33.51
M)
Total 109.40 Total 39 182.03 Total 6 398.63 Total 0
SFC-EFC PUBLIC WORKS DEPARTMENT
Cost of Other Cost (Rs. in Lakhs) Drain Culverts Medium Major
Retaining Wall
road per
Length Costs (in Per Meter & Toe Wall New Type of Type of
km (in Name of Item Costs (in Lakhs) (Meter) Type of Culverts Nos. Cost Nos.
Lakhs) Cost Cost(in Lakhs) No. Cost Cost per CD Structure Structure
Lakhs)
16 17 18 19 20 21 22 23 24 25 26 27 28 29
Traffic Sign HPC 1 Row 1000 RCC Slab ( 1 x 8.0
13.34 2 4.47 2.24 1 46.97
Boards Junction M)
Road Marking & RCC Slab ( 2 x 8.0
15.20 HPC 1 Row 1000 14 31.29 2.24 1 67.57
Delineator M)
KM & boundary RCC Slab ( 3 x 8.0
74.52 1.79 0 0 0.00 19.33 HPC 2 Row 1000 1 3.40 3.40 2 176.38
Stone M)
W Beam Crash RCC Slab ( 1 x 3.0 RCC Slab ( 1 x
19.41 1 23.53 23.53 1 59.46
Barrier M) 10.0 M)
Utility Duct 6.40
Total 56.14 Total 18 62.69 Total 5 350.38 Total 0
SFC-EFC PUBLIC WORKS DEPARTMENT
Cost of Other Cost (Rs. in Lakhs) Drain Culverts Medium Major
Retaining Wall
road per
Length Costs (in Per Meter & Toe Wall New Type of Type of
km (in Name of Item Costs (in Lakhs) (Meter) Type of Culverts Nos. Cost Nos.
Lakhs) Cost Cost(in Lakhs) No. Cost Cost per CD Structure Structure
Lakhs)
16 17 18 19 20 21 22 23 24 25 26 27 28 29
Major
Traffic Sign HPC 1 Row 1000 at RCC Slab Bridge
28.33 12 26.82 2.24 6 281.83 Bridge 5 x 1
Boards Junction (1 x 8.0 M) 16.00 M

Road Marking & RCC Slab Bridge


58.74 HPC 1 Row 1000 52 116.22 2.24 3 202.71
Delineator (2 x 8.0 M)

KM & boundary RCC Slab Bridge


4.98 HPC 1 Row 1200 1 2.65 2.65 5 440.95
Stone (3 x 8.0 M)

W Beam Crash RCC Slab Bridge


89.24 HPC 2 Row 1000 10 34.00 3.40 2 242.46
Barrier (3 x 10.0 M)

RCC Slab Bridge


Utility Duct 20.56 HPC 3 Row 1000 6 27.46 4.58 1 152.54
136.16 0 0 0.00 358.37 (4 x 10.0 M)

RCC Slab Culvert ( 1 1 17.29 17.29


x 2.0 M)
RCC Slab Culvert ( 1 3 70.59 23.53
x 3.0 M)
RCC Slab Culvert ( 1 2 67.02 33.51
x 4.0 M)
RCC Slab Culvert ( 1 15 568.34 37.89
x 6.0 M)
RCC Box Culvert 1 29.65 29.65
(2x3.0x2.0 M)
RCC Box Culvert 1 40.48 40.48
(1x6.0x3.0 M)
Total 201.85 Total 104 1000.52 Total 17 1320.49 Total 1
Major
Consultancy / Quality
Control on civil
Cost of Civil Utility Land Cost per Amount in
work / Supervision GST Total Cost Budget
Works Shifting Acquisition Km Budget
Charges on Utility
Cost Shifting

30 31 32 33 34 35 36 37 38 39

2264.140 45.28 99.67 0 271.70 2680.79 154.33

0.00

eq[; vfHk;ark
yksd fuekZ.k foHkkx
ifj{ks= bUnkSj ¼e-iz-½
Consultancy / Quality
Major Control on civil
Cost of Civil Utility Land Cost per Amount in
work / Supervision GST Total Cost Budget
Cost Works Shifting Acquisition Km Budget
Charges on Utility
Shifting
30 31 32 33 34 35 36 37 38 39

2363.240 54.08 113.60 0 297.23 2828.15 138.63

0.00

eq[; vfHk;ark
yksd fuekZ.k foHkkx
ifj{ks= bUnkSj ¼e-iz-½
Consultancy / Quality
Major Control on civil
Cost of Civil Utility Land Cost per Amount in
work / Supervision GST Total Cost Budget
Cost Works Shifting Acquisition Km Budget
Charges on Utility
Shifting
30 31 32 33 34 35 36 37 38 39

2568.310 59.46 134.74 0 325.34 3087.84 181.42

0.00

eq[; vfHk;ark
yksd fuekZ.k foHkkx
ifj{ks= bUnkSj ¼e-iz-½
Consultancy / Quality
Major Control on civil
Cost of Civil Utility Land Cost per Amount in
work / Supervision GST Total Cost Budget
Cost Works Shifting Acquisition Km Budget
Charges on Utility
Shifting
30 31 32 33 34 35 36 37 38 39

1390.190 32.34 81.03 0 177.37 1680.94 149.15

0.00

eq[; vfHk;ark
yksd fuekZ.k foHkkx
ifj{ks= bUnkSj ¼e-iz-½
Consultancy / Quality
Major Control on civil
Cost of Civil Utility Land Cost per Amount in
work / Supervision GST Total Cost Budget
Cost Works Shifting Acquisition Km Budget
Charges on Utility
Shifting
30 31 32 33 34 35 36 37 38 39

261.20

7045.380 157.62 298.48 0 884.26 8385.73 176.28

261.20

eq[; vfHk;ark
yksd fuekZ.k foHkkx
ifj{ks= bUnkSj ¼e-iz-½
SFC-EF
Earth work Length of CC Cost of CC Road Cost of
Cost of Cost of Road Road
Vidhan Length Formation Carriage way Per Km Crust Thickness in Length of B.T. / Cocrete / Cocrete Block road per
S. NO. District Grant Name of Road Road per KM (in
Sabha (km) Width (m) width (m) Quantity i/c mm B.T. Road (in Lakhs) Block km (in
Lakhs) Pavement
Subgrade Pavement Lakhs)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

BC - 30
DBM - 50
WMM - 250
GSB - 180

CC Block - 80
Sand Bed - 40
Badi - Multhan - WMM - 250
Gogaon - Rupkheda GSB - 250
1 Khargone 29.68 10.00 5.50 10257.27 24.52 2198.09 89.66 5.16 678.42 131.56
Road (MP-MDR-49-
09)
SFC-EF
Earth work Length of CC Cost of CC Road Cost of
Cost of Cost of Road Road
Vidhan Length Formation Carriage way Per Km Crust Thickness in Length of B.T. / Cocrete / Cocrete Block road per
S. NO. District Grant Name of Road Road per KM (in
Sabha (km) Width (m) width (m) Quantity i/c mm B.T. Road (in Lakhs) Block km (in
Lakhs) Pavement
Subgrade Pavement Lakhs)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

BC - 30
DBM - 50
WMM - 250
GSB - 180

CC Block - 80
Sand Bed - 40
WMM - 250
Rodiya -Multhan - GSB - 250
Borawan - Sawda -
1 Khargone Kasrawad Bithar - Singun - 63.82 10.00 5.50 10257.27 56.99 4676.75 82.07 6.84 1005.07 147.05
Maltar - Madraniya
Road
SFC-EF
Earth work Length of CC Cost of CC Road Cost of
Cost of Cost of Road Road
Vidhan Length Formation Carriage way Per Km Crust Thickness in Length of B.T. / Cocrete / Cocrete Block road per
S. NO. District Grant Name of Road Road per KM (in
Sabha (km) Width (m) width (m) Quantity i/c mm B.T. Road (in Lakhs) Block km (in
Lakhs) Pavement
Subgrade Pavement Lakhs)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
BC - 30
DBM - 50
WMM - 250
GSB - 180

CC Block - 80
Khargone - Thikri Sand Bed - 40
1 Khargone Khargone Road (MP-MDR-49- 34.40 10.00 5.50 10751.11 WMM - 250 30.20 2688.54 89.03 4.20 641.80 152.81
13) GSB - 250
SFC-EF
Earth work Length of CC Cost of CC Road Cost of
Cost of Cost of Road Road
Vidhan Length Formation Carriage way Per Km Crust Thickness in Length of B.T. / Cocrete / Cocrete Block road per
S. NO. District Grant Name of Road Road per KM (in
Sabha (km) Width (m) width (m) Quantity i/c mm B.T. Road (in Lakhs) Block km (in
Lakhs) Pavement
Subgrade Pavement Lakhs)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
BC - 30
DBM - 50
WMM - 250
GSB - 180

CC Block - 80
Sand Bed - 40
WMM - 250
Khargone - GSB - 250
Khargone & Kumharkheda -
1 Khargone Bhagwanpur Umarkhali - Dhulkot 26.08 10.00 5.50 10751.11 25.28 2243.92 88.77 0.80 78.96 98.71
a Road (MP-MDR-49-
15)
C-EFC PUBLIC WORKS DEPARTMENT
Other Cost (Rs. in Lakhs) Drain Culverts Medium Major

Retaining Wall
& Toe Wall New
Per Cost(in Lakhs)
Costs (in Length Type of
Name of Item Cost Meter Type of Culverts Type of Structure Nos. Cost Nos. Cost
Lakhs) (Meter) Structure
Cost No. Cost Cost per CD

17 18 19 20 21 22 23 24 25 26 27 28 29 30
HPC (1 ROW 1000) at
Traffic Sign Boards 16.63 10 22.18 2.22 RCC Slab (1 X 6.0) 8 272.21
Junctions

Road Marking & 90.14 HPC (1 ROW 1000) 26 57.67 2.22 RCC Slab (2 X 6.0) 1 56.39
Delineator

KM & boundary
1.60 HPC (2 ROW 1000) 9 30.09 3.34 RCC Slab (2 X 8.0) 1 62.56
Stone
W Beam Crash 62.33 HPC (3 ROW 1000) 6 26.64 4.44 RCC Slab (3 X 8.0) 2 163.67
Barrier 0.00 0 0 0.00
Utility Duct 47.75 HPC (4 ROW 1000) 2 10.56 5.28 RCC Slab (1 X 10.0) 1 65.72
HPC (encasing) (1 ROW 4 15.71 3.93 RCC Slab (3 X 10.0) 1 125.97
1000)
RCC Slab (1 X 4.0) 2 51.96 25.98 RCC Slab (4 X 10.0) 1 156.09
RCC Box (1 X4.0 X 4.0) 1 33.99 RCC Box (1 X 6.0 X 2.0) 1 37.63
RCC Box (1 X 8.0 X 4.0) 1 62.04
RCC Box (3 X 6.0 X 3.0) 1 78.20
Total 218.45 Total 60 249 Total 18 1080.47 Total 0 0.00
C-EFC PUBLIC WORKS DEPARTMENT
Other Cost (Rs. in Lakhs) Drain Culverts Medium Major
Retaining Wall New
Per & Toe Wall
Costs (in Length Type of
Name of Item Cost Meter Cost(in Lakhs) Type of Culverts Type of Structure Nos. Cost Nos. Cost
Lakhs) (Meter) No. Cost Cost per CD Structure
Cost
17 18 19 20 21 22 23 24 25 26 27 28 29 30

RCC T-Beam-
Traffic Sign Boards 25.80 HPC - 1 ROW 1000 46 102.04 2.22 RCC Slab- 1 X 6.0 9 306.23 1 314.31
6 X 16.0

Road Marking & RCC T-Beam-


47.31 HPC - 2 ROW 1000 11 36.78 3.34 RCC Slab- 1 X 8.0 2 86.62 1 706.24
Delineator 13 X 24.0

KM & boundary
Stone 3.58 HPC - 5 ROW 1000 2 27.83 13.92 RCC Slab- 2 X 6.0 1 56.39

W Beam Crash 32.70 RCC Slab- 1 X 2.0 5 121.91 24.38 RCC Slab- 2 X 8.0 1 62.56
Barrier
Utility Duct 61.55 0.00 0 0 61.25 RCC Slab- 1 X 3.0 7 176.07 25.15 RCC Slab- 3 X 8.0 3 245.51
RCC Slab- 1 X 4.0 2 51.96 25.98 RCC Slab- 4 X 10.0 1 156.09
Widening- RCC Box(1 X Widening- RCC Box(1 X
4 26.78 1 6.36
1.5) 1.0)
Widening- RCC Box(1 X Widening- RCC Box(2 X
4 28.63 1 11.06
2.0) 4.0)
Widening- RCC Box(1 X Widening- RCC Box(2 X
6 63.31 1 17.20
3.0) 6.5)
Widening- RCC Box(1 X
2 24.62
5.0)
Total 170.94 Total 89 660 Total 20 948.02 Total 2 1020.55
C-EFC PUBLIC WORKS DEPARTMENT
Other Cost (Rs. in Lakhs) Drain Culverts Medium Major
Retaining Wall New
Per & Toe Wall
Costs (in Length Type of
Name of Item Cost Meter Cost(in Lakhs) Type of Culverts Type of Structure Nos. Cost Nos. Cost
Lakhs) (Meter) No. Cost Cost per CD Structure
Cost
17 18 19 20 21 22 23 24 25 26 27 28 29 30
HPC 1 Row 1000 at
Traffic Sign Boards 15.91 9 19.96 2.22 RCC Slab ( 1 x 6.0 M) 3 102.08
Junction
Road Marking & RCC Slab Bridge ( 2 x 8.0
110.36 HPC 1 Row 1000 37 82.07 2.22 2 125.12
Delineator M)
KM & boundary RCC Slab Bridge ( 3 x 8.0
1.87 HPC 2 Row 1000 6 20.06 3.34 1 81.83
Stone M)
W Beam Crash 0.00 0 0 30.63 RCC Box (2 x 3.0 x 2.0
Barrier 57.22 HPC 2 Row 1200 3 12.16 4.05 M) 1 32.46
Utility Duct 100.86 HPC 3 Row 1000 4 17.76 4.44
HPC 4 Row 1000 1 5.08 5.08
RCC Slab ( 1 x 3.0 M) 6 130.49 21.75
RCC Slab ( 1 x 4.0 M) 1 25.98 25.98
Total 286.22 Total 67 313.57 Total 7 341.49 Total 0 0.00
C-EFC PUBLIC WORKS DEPARTMENT
Other Cost (Rs. in Lakhs) Drain Culverts Medium Major
Retaining Wall New
Per & Toe Wall
Costs (in Length Type of
Name of Item Cost Meter Cost(in Lakhs) Type of Culverts Type of Structure Nos. Cost Nos. Cost
Lakhs) (Meter) No. Cost Cost per CD Structure
Cost
17 18 19 20 21 22 23 24 25 26 27 28 29 30
HPC 1 Row 1000 at
Traffic Sign Boards 15.91 7 15.53 2.22 RCC Slab ( 1 x 6.0 M) 2 68.05
Junction
Road Marking & RCC Slab Bridge ( 2 x 6.0
76.44 HPC 1 Row 1000 29 64.33 2.22 1 57.75
Delineator M)
KM & boundary Widening- RCC Box (1 X
1.88 HPC 2 Row 1000 6 20.06 3.34 1 6.36
Stone 1.0)
W Beam Crash Widening- RCC Box (1 X
Barrier 49.73 HPC 3 Row 1000 1 4.44 4.44 1.5) 1 6.70
0.00 0 0 0.00
Utility Duct 19.16 RCC Box (1x 3.0 x 2.0 M) 1 23.86 23.86

RCC Box (1x 4.0 x 3.0 M) 1 27.95 27.95

Widening- RCC Box (1 X 3 21.48 7.16


2.0)
Widening- RCC Box (1 X 1 10.55 10.55
3.0)
Total 163.12 Total 49 188.19 Total 5 138.87 Total 0 0.00
Consultancy /
Quality Control
Cost of Civil on civil work / Utility Land Cost per Amount in
GST Total Cost Budget
Works Supervision Shifting Acquisition Km Budget
Charges on Utility
Shifting

31 32 33 34 35 36 37 38 39

4424.25 102.59 239.01 0 559.60 5325.45 179.46

eq[; vfHk;ark
yksd fuekZ.k foHkkx
ifj{ks= bUnkSj ¼e-iz-½
Consultancy /
Quality Control
Cost of Civil on civil work / Utility Land Cost per Amount in
GST Total Cost Budget
Works Supervision Shifting Acquisition Km Budget
Charges on Utility
Shifting
31 32 33 34 35 36 37 38 39

8542.53 193.30 380.33 0 1070.75 10186.92 159.62

eq[; vfHk;ark
yksd fuekZ.k foHkkx
ifj{ks= bUnkSj ¼e-iz-½
Consultancy /
Quality Control
Cost of Civil on civil work / Utility Land Cost per Amount in
GST Total Cost Budget
Works Supervision Shifting Acquisition Km Budget
Charges on Utility
Shifting
31 32 33 34 35 36 37 38 39

4302.24 106.69 349.84 0 558.26 5317.03 154.56

eq[; vfHk;ark
yksd fuekZ.k foHkkx
ifj{ks= bUnkSj ¼e-iz-½
Consultancy /
Quality Control
Cost of Civil on civil work / Utility Land Cost per Amount in
GST Total Cost Budget
Works Supervision Shifting Acquisition Km Budget
Charges on Utility
Shifting
31 32 33 34 35 36 37 38 39

2813.06 63.86 128.76 0 353.03 3358.70 128.78

eq[; vfHk;ark
yksd fuekZ.k foHkkx
ifj{ks= bUnkSj ¼e-iz-½
SFC-EF
Earth work Length of CC Cost of
Crust Thickness in Length of Cost of B.T. Cost of Road Road / Cocrete Cost of CC Road road
Vidhan Length Formation Carriage way Per Km per
S. NO. District Grant Name of Road Road (in per KM (in / Cocrete Block km (in
Sabha (km) Width (m) width (m) Quantity i/c mm B.T. Road Block
Lakhs) Lakhs) Pavement
Subgrade Pavement Lakhs)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

BC - 30
DBM - 50
WMM - 250
GSB - 180

CC Block - 80
Holgaon -Tangla- Sand Bed - 40
Dongargaon- WMM - 250
Hirani- Keli- Bori- GSB - 250
1 Barwani Barwani Samarkheda- 32.49 10.00 5.50 10311.66 31.84 2754.33 86.51 0.65 68.97 106.11
Menimata-Chiklya
Road (MP-MDR-
48-14)
SFC-EF
Earth work Length of CC Cost of
Crust Thickness in Length of Cost of B.T. Cost of Road Road / Cocrete Cost of CC Road road
Vidhan Length Formation Carriage way Per Km per
S. NO. District Grant Name of Road Road (in per KM (in / Cocrete Block km (in
Sabha (km) Width (m) width (m) Quantity i/c mm B.T. Road Block
Lakhs) Lakhs) Pavement
Subgrade Pavement Lakhs)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

BC - 30
DBM - 50
WMM - 250
GSB - 180

CC Block - 80
Sendhwa - Varla Sand Bed - 40
1 Barwani Sendhwa Road (MP-MDR- 40.26 10.00 5.50 10220.99 WMM - 250 39.96 3281.23 82.12 0.30 51.35 171.19
48-22) GSB - 250
SFC-EF
Earth work Length of CC Cost of
Crust Thickness in Length of Cost of B.T. Cost of Road Road / Cocrete Cost of CC Road road
Vidhan Length Formation Carriage way Per Km per
S. NO. District Grant Name of Road Road (in per KM (in / Cocrete Block km (in
Sabha (km) Width (m) width (m) Quantity i/c mm B.T. Road Block
Lakhs) Lakhs) Pavement
Subgrade Pavement Lakhs)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
BC - 30
DBM - 50
WMM - 250
GSB - 180
Jalgon- Bandhara
Bujurg -Ghattya CC Block - 80
1 Barwani Pansemal 11.65 10.00 5.50 9949.95 Sand Bed - 40 10.80 932.52 86.35 0.85 110.27 129.73
Road (MP-MDR-
48-23) WMM - 250
GSB - 250
SFC-EF
Earth work Length of CC Cost of
Crust Thickness in Length of Cost of B.T. Cost of Road Road / Cocrete Cost of CC Road road
Vidhan Length Formation Carriage way Per Km per
S. NO. District Grant Name of Road Road (in per KM (in / Cocrete Block km (in
Sabha (km) Width (m) width (m) Quantity i/c mm B.T. Road Block
Lakhs) Lakhs) Pavement
Subgrade Pavement Lakhs)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

BC - 30
DBM - 50
WMM - 250
GSB - 180

Balwadi-Dewli-
1 Barwani Sendhwa Dhawali (MP- 20.89 10.00 5.50 10158.13 CC Block - 80 19.80 1736.97 87.73 1.09 148.10 135.87
MDR-48-25) Sand Bed - 40
WMM - 250
GSB - 250
C-EFC PUBLIC WORKS DEPARTMENT
Other Cost (Rs. in Lakhs) Drain Culverts Medium Major

Retaining Wall
& Toe Wall New
Cost(in Lakhs)
Length Per Meter Type of
Name of Item Costs (in Lakhs) Cost Type of Culverts Type of Structure Nos. Cost Nos. Cost
(Meter) Cost Cost per Structure
No. Cost CD

17 18 19 20 21 22 23 24 25 26 27 28 29 30

HPC 1 Row 1000 RCC Slab ( 1 x 6.0 Major Bridge


Traffic Sign Boards 22.85 5 11.18 2.24 5 189.45 1 143.49
Junction M) 2 x 16.00 M

Road Marking & RCC Slab ( 1 x 8.0 Major Bridge


42.83 HPC 1 Row 1000 54 120.69 2.24 1 46.97 1 266.25
Delineator M) 3 x 16.00 M

KM & boundary RCC Slab ( 3 x 8.0 Major Bridge


1.82 HPC 2 Row 1000 13 44.20 3.40 1 88.19 2 694.09
Stone M) 4 x 16.00 M

W Beam Crash RCC Slab ( 1 x 10.0


73.91 HPC 3 Row 1000 2 9.15 4.58 1 54.19
Barrier 2280.00 44.373417 0.019 114.85 M)
RCC Slab ( 2 x 10.0
Utility Duct 17.47 RCC Slab ( 1 x 2.0 M) 3 51.86 17.29 1 83.29
M)
RCC Slab ( 3 x 10.0
RCC Slab ( 1 x 3.0 M) 1 27.55 27.55 3 367.67
M)

RCC Slab ( 1 x 4.0 M) 4 134.04 33.51

RCC BOX (1 x 2.00M) 2 13.13 6.57


Widening

Total 158.88 Total 84 412 Total 12 829.75 Total 4 1103.82


C-EFC PUBLIC WORKS DEPARTMENT
Other Cost (Rs. in Lakhs) Drain Culverts Medium Major
Retaining Wall New
Length Per Meter & Toe Wall Type of
Name of Item Costs (in Lakhs) Cost Cost(in Lakhs) Type of Culverts Cost per Type of Structure Nos. Cost Nos. Cost
(Meter) Cost No. Cost Structure
CD
17 18 19 20 21 22 23 24 25 26 27 28 29 30

HPC 1 Row 1000 RCC Slab ( 1 x 6.0 Major Bridge


Traffic Sign Boards 37.33 12 26.82 2.24 7 265.23 1 221.95
Junction M) 4 x 16.00 M

Road Marking & RCC Slab ( 1 x 8.0


79.10 HPC 1 Row 1000 36 80.46 2.24 2 93.94
Delineator M)
KM & boundary RCC Slab ( 2 x 6.0
2.81 HPC 2 Row 1000 9 30.60 3.40 3 184.20
Stone M)
0 0 0 124.56
W Beam Crash RCC Slab ( 2 x 8.0
51.09 RCC Slab ( 1 x 2.0 M) 2 34.58 17.29 3 202.70
Barrier M)
RCC Slab ( 3 x 8.0
Utility Duct 1.49 RCC Slab ( 1 x 3.0 M) 11 303.05 27.55 2 176.38
M)
RCC Slab ( 2 x 10.0
RCC Slab ( 1 x 4.0 M) 10 335.10 33.51 4 333.15
M)
Total 171.82 Total 80 811 Total 21 1255.60 Total 1 221.95
C-EFC PUBLIC WORKS DEPARTMENT
Other Cost (Rs. in Lakhs) Drain Culverts Medium Major
Retaining Wall New
Length Per Meter & Toe Wall Type of
Name of Item Costs (in Lakhs) Cost Cost(in Lakhs) Type of Culverts Cost per Type of Structure Nos. Cost Nos. Cost
(Meter) Cost No. Cost Structure
CD
17 18 19 20 21 22 23 24 25 26 27 28 29 30
HPC 1 Row 1000 RCC Slab Culvert
Traffic Sign Boards 17.59 3 6.71 2.24 1 37.89
Junction ( 1 x 6.0 M)
Road Marking & RCC Slab MNB ( 1 x
24.10 HPC 1 Row 1000 9 20.12 2.24 1 46.97
Delineator 8.0 M)
KM & boundary RCC Slab MNB ( 2
0.81 HPC 2 Row 1000 1 3.40 3.40 1 67.57
Stone 0 0 0 98.01 x 8.0 M)
W Beam Crash HPC 1 Row 1000 RCC Slab MNB ( 3 x
Barrier 10.22 Encasing 1 3.08 3.08 10.0 M) 1 122.56

RCC Slab Culvert ( 1 x


Utility Duct 8.09 1 27.55 27.55
3.0 M)
Total 60.81 Total 15 61 Total 4 274.98 Total 0 0.00
C-EFC PUBLIC WORKS DEPARTMENT
Other Cost (Rs. in Lakhs) Drain Culverts Medium Major
Retaining Wall New
Length Per Meter & Toe Wall Type of
Name of Item Costs (in Lakhs) Cost Cost(in Lakhs) Type of Culverts Cost per Type of Structure Nos. Cost Nos. Cost
(Meter) Cost No. Cost Structure
CD
17 18 19 20 21 22 23 24 25 26 27 28 29 30

HPC 1 Row 1000 for RCC Slab ( 1 x 6.0 Major Bridge


Traffic Sign Boards 20.06 4 8.94 2.24 3 113.67 1 261.20
Junction M) 5 x 16.00 M

Road Marking & RCC Slab ( 2 x 4.0 Major Bridge


32.86 HPC 1 Row 1000 13 29.06 2.24 1 58.05 1 353.74
Delineator M) 6 x 16.00 M

KM & boundary RCC Slab ( 2 x 8.0


Stone 1.75 0 0 0 198.66 HPC 2 Row 1000 5 17.00 3.40 M) 1 67.57

W Beam Crash RCC Slab ( 1 x 10.0


33.72 HPC 3 Row 1000 1 4.58 4.58 1 54.19
Barrier M)
RCC Slab ( 4 x 10.0
Utility Duct 4.23 RCC Slab ( 1 x 3.0 M) 2 55.10 27.55 1 152.40
M)
RCC Slab ( 1 x 4.0 M) 1 33.51 33.51
Total 92.62 Total 26 148 Total 7 445.87 Total 2 614.94
Consultancy /
Quality Control on
Cost of Civil civil work / Utility Land Cost per Amount in
GST Total Cost Budget
Works Supervision Shifting Acquisition Km Budget
Charges on Utility
Shifting

31 32 33 34 35 36 37 38 39

5486.78 126.55 140.05 0 667.83 6421.21 197.64

eq[; vfHk;ark
yksd fuekZ.k foHkkx
ifj{ks= bUnkSj ¼e-iz-½
Consultancy /
Quality Control on
Cost of Civil civil work / Utility Land Cost per Amount in
GST Total Cost Budget
Works Supervision Shifting Acquisition Km Budget
Charges on Utility
Shifting
31 32 33 34 35 36 37 38 39

5917.12 132.10 204.63 0 734.61 6988.47 173.58

eq[; vfHk;ark
yksd fuekZ.k foHkkx
ifj{ks= bUnkSj ¼e-iz-½
Consultancy /
Quality Control on
Cost of Civil civil work / Utility Land Cost per Amount in
GST Total Cost Budget
Works Supervision Shifting Acquisition Km Budget
Charges on Utility
Shifting
31 32 33 34 35 36 37 38 39

1537.45 37.33 96.68 0 197.36 1868.82 160.41

eq[; vfHk;ark
yksd fuekZ.k foHkkx
ifj{ks= bUnkSj ¼e-iz-½
Consultancy /
Quality Control on
Cost of Civil civil work / Utility Land Cost per Amount in
GST Total Cost Budget
Works Supervision Shifting Acquisition Km Budget
Charges on Utility
Shifting
31 32 33 34 35 36 37 38 39

3385.33 77.96 152.39 0 424.53 4040.21 193.40