Material List: IMC552 IMC552
Material List: IMC552 IMC552
Material List: IMC552 IMC552
INSTRUMENT
IMC554 IMC554
STACTIC STACTIC
(TEST) (TEST)
EQUALIZE EQUALIZE
MEI1077
PROCESS
IMC567
IMC567
SIT493
SIT493
TIME: 15:41:08
H L
BY INSTRUMENTS
BY PIPING
BY PIPING
3
CLASS 150, 300 & 600
NOTES
INSTRUMENT INSTALLATION DETAIL
1. SEE INSTRUMENT NOTES AND LEGEND DRAWING #166000-000-DG-IC04-0001.
2. FOR TAGS ASSIGNED TO THIS DETAIL SEE INSTRUMENT INDEX.
3 ISSUED FOR CONSTRUCTION GC DS GN 28-Jan-11 PRESSURE DIFFERENTIAL INDICATOR
HOOK-UP: PDI-STD-001
3. INSTRUMENT TUBING TO BE FIELD ROUTED AND SUPPORTED 2 ISSUED FOR CONSTRUCTION GC DS GN 25-Mar-10 GAS ABOVE REMOTE MOUNT
AS REQUIRED.
4. MOUNTING BRACKET SUPPLIED WITH INSTRUMENT. 1 REVISED AS NOTED KRF PMB COMM 09-Feb-09 CARTAGENA EXPANSION PROJECT
5. FIELD TO VERIFY HIGH PRESSURE AND LOW PRESSURE PROCESS CONNECTIONS.
0 ISSUED FOR DESIGN KRF PMB COMM 24-Aug-09
THIS DOCUMENT IS THE PROPERTY OF CHICAGO BRIDGE & IRON COMPANY ("CB&I"). IT MAY CONTAIN INFORMATION DESCRIBING TECHNOLOGY
OWNED BY CB&I AND DEEMED TO BE COMMERCIALLY SENSITIVE. IT IS TO BE USED ONLY IN CONNECTION WITH WORK PERFORMED BY CB&I.
REPRODUCTION IN WHOLE OR IN PART FOR ANY PURPOSE OTHER THAN WORK PERFORMED BY CB&I IS FORBIDDEN EXCEPT BY EXPRESS WRITTEN
PERMISSION OF CB&I. IT IS TO BE SAFEGUARDED AGAINST BOTH DELIBERATE AND INADVERTENT DISCLOSURE TO ANY THIRD PARTY.
FOR: Refineria de Cartagena S.A.
DRAWN: CK'D: APPD: DATE: SCALE:
NO. REVISION DRAWN CK'D APPD DATE
PMB RSB COMM 18-Aug-08 N/A PROJ NO: 166000 DWG NO: 000-DG-IC04-0023 REV: 3