BACK UP DATA

GALIAN TANAH PONDASI TELAPAK/SLOOF

Tipe b (M) h t n Volume (M3)


(M) (M) (bh)

P1 1.70 1.90 2.00 11.00 71.06


P2 1.20 1.95 2.00 11.00 51.48
P3 1.80 1.80 2.00 11.00 71.28
Volume Total : P1+P2+P3 193.82

DISETUJUI DIPERIKSA DIBUAT


ASSISTEN TEKNIK PENGAWAS LAPANGAN PT. KARUNIA JAYA SEJATI

1. JEMMY TINTINGON, BE

JOHAN ANGGOMAN, ST, MT 2. EMILE BOGAR, ST ARGEMIRO TULANDI, ST


NIP. 19761227 200012 1 003
BACK UP DATA
URUGAN PASIR DIBAWAH PONDASI

Tipe b h t n Volume
(M) (M) (M) (bh) (M3)

P1 1.70 1.90 0.15 11.00 5.33


P2 1.20 1.95 0.15 11.00 3.86
P3 1.80 1.80 0.15 11.00 5.35
Volume Total : P1+P2+P3 14.54

DISETUJUI DIPERIKSA DIBUAT


ASSISTEN TEKNIK PENGAWAS LAPANGAN PT. KARUNIA JAYA SEJATI

1. JEMMY TINTINGON, BE

JOHAN ANGGOMAN, ST, MT 2. EMILE BOGAR, ST ARGEMIRO TULANDI, ST


NIP. 19761227 200012 1 003
BACK UP DATA
LANTAI KERJA

Tipe b h t n Volume
(M) (M) (M) (bh) (M3)

P1 1.70 1.90 0.10 11.00 3.553


P2 1.20 1.95 0.10 11.00 2.574
P3 1.80 1.80 0.10 11.00 3.564
Volume Total : P1+P2+P3 9.69

DISETUJUI DIPERIKSA DIBUAT


ASSISTEN TEKNIK PENGAWAS LAPANGAN PT. KARUNIA JAYA SEJATI
BACK UP DATA
PONDASI TELAPAK

Tipe b h t n Volume
(M) (M) (M) (bh) (M3)

P1 1.60 1.80 0.28 11.00 8.87


P2 1.10 1.85 0.24 11.00 5.48
P3 1.70 1.70 0.28 11.00 8.90
Volume Total : P1+P2+P3 23.25

DISETUJUI DIPERIKSA DIBUAT


ASSISTEN TEKNIK PENGAWAS LAPANGAN PT. KARUNIA JAYA SEJATI

1. JEMMY TINTINGON, BE

JOHAN ANGGOMAN, ST, MT 2. EMILE BOGAR, ST ARGEMIRO TULANDI, ST


NIP. 19761227 200012 1 003
BACK UP DATA
KOLOM BETON

Tipe b h t n Volume
(M) (M) (M) (bh) (M3)

K1 0.36 0.6 7.252 11.00 17.23


K2 0.35 0.43 3.590 11.00 5.94
K3 0.35 0.38 5.263 11.00 7.70
Volume Total : P1+P2+P3 30.87

DISETUJUI DIPERIKSA DIBUAT


ASSISTEN TEKNIK PENGAWAS LAPANGAN PT. KARUNIA JAYA SEJATI

1. JEMMY TINTINGON, BE

JOHAN ANGGOMAN, ST, MT 2. EMILE BOGAR, ST ARGEMIRO TULANDI, ST


NIP. 19761227 200012 1 003
BACK UP DATA
SLOOF BETON

Tipe p h t n Volume
(M) (M) (M) (bh) (M3)

S1 3.86 0.25 0.42 22 8.92


S2 4.2 0.25 0.35 30 11.03

Volume Total : P1+P2+P3 19.94

DISETUJUI DIPERIKSA DIBUAT


ASSISTEN TEKNIK PENGAWAS LAPANGAN PT. KARUNIA JAYA SEJATI

1. JEMMY TINTINGON, BE

JOHAN ANGGOMAN, ST, MT 2. EMILE BOGAR, ST ARGEMIRO TULANDI, ST


NIP. 19761227 200012 1 003
BACK UP DATA
BALOK MELINTANG

p
Tipe h t n Volume
(M) (M) (bh) (M3)
(M)
B1 27/45 8.81 0.27 0.45 8.360 8.9530
Balok anak B2 25/35 8.07 0.25 0.35 7.600 5.3635

Volume Total : 14.32

DISETUJUI DIPERIKSA DIBUAT


ASSISTEN TEKNIK PENGAWAS LAPANGAN PT. KARUNIA JAYA SEJATI

1. JEMMY TINTINGON, BE

JOHAN ANGGOMAN, ST, MT 2. EMILE BOGAR, ST ARGEMIRO TULANDI, ST


NIP. 19761227 200012 1 003
BACK UP DATA
BALOK MEMANJANG

p
Tipe h t n Volume
(M) (M) (bh) (M3)
(M)
B2 25/35 elv. +207 4.2 0.25 0.35 7.600 2.7930
B3 27/41 elv. +381 4.2 0.27 0.41 7.600 3.5335
B3 27/41 elv. +475 4.2 0.27 0.41 7.600 3.5335
Volume Total : 9.86

DISETUJUI DIPERIKSA DIBUAT


ASSISTEN TEKNIK PENGAWAS LAPANGAN PT. KARUNIA JAYA SEJATI

1. JEMMY TINTINGON, BE

JOHAN ANGGOMAN, ST, MT 2. EMILE BOGAR, ST ARGEMIRO TULANDI, ST


NIP. 19761227 200012 1 003