EQUIPMENT STATUS
VCB ( Gate No.2 ) Working
Transformer Working
Utility LT panel Working
Capacitor Bank Working
Lifts Working
DGs Working
Earth Pits Working
ACBs Working
Fire Protection Working
HT & LT Mete
Previous Day Present Day
Meter
08:00Hrs 08:00Hrs
HTMeter (KVAH) 2197380.00 2197994.00
LT Meter(KWH) 21686.92 21693.03
During Powe
Power Failure V I
Duration Max Min Max Min
2 01:35 Hrs 427 415 390 180
DG Sets
DG Sets Hrs.Run Cum Rn Hr. KWH Max Load Unit/L
DG No - 1 (500 kva) 01:35 Hrs 2.00 204 300 3.00
DG No-2 (500 kva) 01:20 Hrs 1,805.80 363 470 3.20
DG No-3 (500 kva) 1,622.30
DG No-4(500 Kva) 4.04
DG Fire Engine
Total 3,434.14 567 3.12
Diesel incoming / O
Diesel stock (Drum) Opening Previous day Diesel Received
O.K.Hosiery Mills Pvt Ltd 2000 3889
Power consump
Previous Day Present Day
Meter Area
08:00 Hrs 08:00 Hrs
Majestic IT (Floor) Ground Floor 410.75 411.14
Majestic-2 (LT Panel) Ground Floor 14623.00 14663.00
Home Shop 18 (LT) Ground Floor 600453.00 600453.00
Home Shop 18 (DG) Ground Floor 38239.00 38239.00
BPO(LT) Ground Floor 1458169.00 1459160.00
BPO(DG) Ground Floor 64268.00 64362.00
TPA-I(LT) Ground Floor 195.33 196.45
TPA-I(DG) Ground Floor 4144.00 4147.00
TPA-II(LT) Ground Floor 17.75 17.85
TPA-II(DG) Ground Floor 372.00 383.00
TPA-III(LT) First Floor 80.51 81.14
TPA-III(DG) First Floor 1793.00 1857.00
Vertex-I (Floor) First Floor 282.70 282.70
Vertex-I (DG) First Floor 9084.00 9084.00
Vertex -II(Floor) First Floor 37.01 37.01
Vertex-II (DG) First Floor 1296.00 1296.00
ICCS (Floor) Third Floor 45.64 46.86
ICCS (DG) Third Floor 1286.00 1397.00
Analog Media(LT) M1 Third Floor 1350029.00 1350450.00
Analog Media (DG)M1 Third Floor 74003.00 74035.00
Analog Media (LT) M2 Third Floor 109.91 110.54
Analog Media (DG) M2 Third Floor 2417.00 2458.00
VCon(LT) Second Floor 22401.00 22403.00
VCon(DG) Second Floor 501.00 502.00
ATM Gate No 2 12638.00 12650.00
Utility common LT Panel 593223.00 593935.00
Total
LIFTs Ser
STATUS Service Date
Passenger Lift-1 OK 29-Apr
Passenger Lift-2 OK 29-Apr
Service lift OK 29-Apr
AC Filter C
CLIENT LOCATION AC filters cleaning done on
Majestic IT Ground Floor 14-Jul
Majestic 2 Ground Floor 14-Jul
BPO Convergence Ground Floor 14-Jul
Home Shop - 18 Ground Floor 14-Jul
Vertex-I First floor 14-Jul
Vertex-II First floor 14-Jul
TPA 1st Second Floor 14-Jul
A.Z.B Second Floor 14-Jul
TPA 2nd Second Floor 14-Jul
ICCS Third Floor Service by the client
Vertex-IV Third Floor 14-Jul
Fire preventio
Fire Jockey Pump
Fire Hydrant pump
Fire Sprinkler Pump
Fire Engine
Fire Alarm Panel
False Fire Alarm Reported
CCTV Observation (if any) AM
Pump ope
PUMP LOCATION Serviced On Date
Borewell 1 & 2 Near Main Security Gate 14-Jul
Booster Pump- 1 & 2 Fire Pump Room 14-Jul
Sump Pump- 1 Near Entry Ramp Area 14-Jul
Sump Pump- 2 Near Exit Ramp Area 14-Jul
Sump Pump- 3 Fire Pump Room 14-Jul
Soft serv
HK Deployment Std A Shift B Shift (half)
House keeping boy 2+2 1 1
Complaint
Trade Calls C/F Logged
AC 0 3
Electrical / Civil 0 3
Fire 0 0
Carpentory 0 0
Plumbing 0 0
Miscellenous 0 0
Attenda
ALLOCATED AVAILABLE
M&E TEAM 8 6
HK Team 4 3
Fire Technician 3 3
AC Team 3 3
Security Team 12 12
TOTAL 30 27
Borewell
Borewell Previous Current MF Difference
Borewell 1 (meter reading) 33958 33985 1000 27300
Borewell 2 (meter reading) 39045 39058 1000 13800
Water Softner ( Reading) 1665 1702 1000 36440
Daily activity / Preventive
SERVICES A
DG Sets ALL Check done.
Majestic old office wooden cabinet handle issue has been resolved.
Boundry side wire dressing work on progress by in house team.
Electrical / Civil
Sump pum no 1,2 & 3 starter checked.
ICCS & Tpa 1st water leakage issue has been resolved.
AC/Plumber TPA 1st AC no 4 gas topped up & AC no 3 water leakage issue has been resolved.
TPA UPS room split AC no 2 water leakage issue has been resolved Now working fine.
Fire/Electrical
Water leakage near/above parking area ramp
Switch box on floor top to be covered, as peresently they are open, can be dangerous
General Ist floor civil work on progress by shukla ji.
Wall paint removed near Service Lift by water from door on ground floor
One exhaust fan motor check winding burned
Material in parking area to be segregate and to put on its area or scraped
orewell Used
Total
41100.0000000058
36440.0000000001
eventive maintenance status
Activity
.
fine.
rous
DMR Sec-4 (15-July -2019)
Total Consumption
Amount
59681
59389
Remarks
Power Fail
08:15 to 08:30
15:35 to 16:55
Remarks
Remarks
712
Total consumption By Client + DG
client + Common Area
6635 256
Approx
Remarks
Remarks
Remarks
Remarks
Status
Done
Done
Done
Done
Done
Done
Done