we A
me agate)
snamprogetti e&c co.ltd Gensetidvied Contractors.
Connpany VL
PLANT LOCATION CUSTOMER Jos. UNIT
JAZAN - SAUDI ARABIA ‘SAUDI ARAMCO 240832 30
Doc. No. | _J30-ZA-E-3002449_AEB
PROJECT / UNIT 51 Doe aay
JIGCC ~ SULFUR RECOVERY UNTT (RU) - IK-EPC PACKAGE-2 SSL
‘SUBCONTRACTOR ‘SUBCONTRACTOR CONTRACT NO. "SUBCONTRACTOR PROJECT NO.
coo 901297 ‘168
MATERIAL APPROVAL REQUEST
FOR
STAINLESS STEEL ABRASIVE MATERIAL 120 MESH
GARNET ARABIA COMPANY LIMITED
MAR-P0049-P2
Contract No. 6600033161
B.L.-10-01525-0002 [a
DoCUMENTSTATUS | OATE [SHED
Ik Approvedovewea wah
te Comments
_ (iteesvatiorstan Comme
Reference Approval:
SPRGECCESE PM-L-AN69S Troe sede
io hrbismes nh
A 2 Pinetinie
[ Ha | VI os
[00 Issue for "| Project Control ‘Quality Control Project Manager BEIT
coaten | hee rae
[Rev.| Description Prepared Checked Checked Approved Date
“Tis docu nas been prapaced by Snameroget Enginesing & Contacting Co. Lis er Saul Aram,
ion hats Contant ad sun rfommaton erence obs forthe elise uso ofthe insvival rent named above,
To vad fo poposes ober han hows for wich thee been Secored Page tof6a
Goompamy Wel
Doc.No.| J30-ZA-E-3002449_AEB
INDEX
41 GENERAL INFORMATION
2 GENERAL NOTES, PRECAUTIONS AND RECOMMENDATIONS
3. ATTACHMENTS
“This document hasbeen propre by Snamproget Engheering& Contacting Co. Li for Saud Aramco.
[Reantana nformaton ta e Ciena! an such nfrmation fs intends to be fr the excl se of hens rently named above
IRS be eter shown oti partes nor used for purposes cher than hase for whieh ih been eecloses
Page otrN
wh .
Company Weill
PIamrioearen CUSTOMER ica ir
AZAN SAUDI ARABIA EI RANES aie So
onnal| SWS0zAESmEiaN AES
Rosecr unr Se | ee
GCC ~ SULFUR RECOVERY UNIT (GRU) -IK-EPC PACKAGE-2 : ‘rin
SUBCONTRACTOR [__ SUBCONTRACTOR CONTRACT NO. ‘SUBCONTRACTOR PROJECT NO.
eos | osi207 1168
4 GENERAL INFORMATION
4.4 Purpose of the Document
The aim of this document is to request approval for STAINLESS STEEL ABRASIVE
MATERIAL 120 Mesh for blast cleaning of SS pipes & pipe supports before painting.
‘The present Material Requisition is valid only for the J30 Unit as reflected within the Document
Code assigned in line with A00-ZA-E-9909080 Document, Equipment and Material Numbering
Procedure.
4.2 Definitions
COMPANY
CONTRACTOR
SUBCONTRACTOR
4.3 Abbreviations
MAR
MR
Mos
acs
ace
Saudi Arabian Oil Company ~ SAUDI ARAMCO
Snamprogetti Engineering & Contracting Co. Ltd
Consolidated Contractors Company W.L.L
Material Approval Request
Material Requisition
Method of Statement
Quality Control Specification
Quality Control Plan
‘This document has boon prepared by Sramproget Enginosring& Contacting Co Lid for Ssud Aramco.
conan nfrmatian thats Conidenal an such ifort is inondos to bo fo the exh Ue of he iniual erly named above
[Shall be eter shown oth parts ot used for purposes ober than hove fr whch ths been ose
Page sot