Storage Tank With Stirrer Manual

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 13

ALLIED

USER MANUAL
FOR

STORAGE TANK (500 LITERS)


WITH STIRRER (0.5 HP)

Company. : M /s. Allied

Unit no. : 17, Param Industrial Estate, Naik Pada,


Waliv, Vasai (E), District Thane – 401 208,
Maharashtra, India.

Telephone nos. : (+ 91 - 250) 2451675/6451697

Tele / Fax. : (+ 91 - 250) 2451674.

E–Mail Address. : Admin@alliedworld.in


ALLIED Page No.: 02

ALLIED

OUR MISSION

Maintain the highest standards of


ethical conduct in all business activities.

Anticipate the needs of our customers


by providing them with quality, value added
products, unsurpassed service and creative marketing.

Encourage employees to
take pride and responsibility in
their company by providing a safe,
productive and participative environment
that allows individuals to grow in responsibility based on individual merit.

Achieve superior financial


performance by growing while
managing our costs, fostering continuous
improvement and working with our suppliers.
ALLIED Page No.: 03

FROM THE MARKETING DIRECTOR’S DESK

Kind Attn. : Director, Plant / Works Manager, Production Manager, Production


Executive, Manufacturing Chemist, Tablets In-charge, Operator.

Subject : Launch of another “Value Added Services” from the ALLIED

Dear Sir,

Its gives me immense pleasure to introduce the ALLIED User Manual – A short and
complete handbook for the User of this Product.

We, at ALLIED are improving at all levels, over years, which have won a great
amount of confidence in the hearts of beloved customers. Our improvement is
thoroughly dedicated to all of you who have contributed with your valuable feedback
and comments, over the years. Understanding your needs and improving ourselves
has led to a better quality and delivery periods of our Products.

Care in procedural Employment, Usage and maintenance of these products plays a


vital role in the durability of the products & you’re other connected equipments &
ultimately excellent quality of your Pharmaceutical Products with a higher rate of
productivity. Your returns have been thought and the outcome was the ALLIED
USER MANUAL.

This manual has been consciously complied, absolutely from the user’s point of
view, towards the better utilization of these products of all manufacturers. We are
confident that by thoroughly going through this manual, you can be certain of,
knowing more about these products and the various aspects governing them, for
better performance. This manual is an effort in balancing this equation to get a
mutually satisfactory result. Rectification / Replacements etc., have become a
mandatory schedule in every supplier’s end. Although, it is welcome, based on the
evaluation and study of the complaints and observation, we also thought that a little
more care and awareness is definitely required at the user’s end, which can bring in
solutions in-house and at the least possible times. This not only results in avoiding
any chaotic situations between the user and supplier but also eradicates the
production breakdown time, which would be the prime interest of any user.

Hence, we insist that the manual be studied in detail and the said to be implemented
on the various aspects governing the life of the punches and dies & tablet presses.

I sincerely look forward and appeal to all my users to sincerely adapt to this manual
and enjoy the fruits of its returns. As ever, you are welcome to write to us on any of
your comments and feedback, which would be evaluated & with great sincerity.

Thanking you & with my best wishes,


For ALLIED
BHARAT PANCHAL
ALLIED Page No.: 04

USER MANUAL

CONTENTS

Sections. Content Details Page no.

01. Product Details. Page no. 05

02. Instruction For Unpacking & Checking. Page no. 06

03. Do’s & Don’ts. Page no. 07

04. Technical Specification. Page no. 08

05. Drawing. Page no. 09

06. Conclusion. Page no. 10

07. A Sheet for your Comments Page no. 11

Please read and undersigned the installation, operation and maintenance manual
carefully. In case of doubt please feel free to Write to us.

Contents are subject to revision without notice.

CAUTION:

Failure to comply with the instructions in this manual may result in Damage to the
equipment and personnel.
ALLIED Page No.: 05

1. PRODUCT DETAILS

STORAGE TANK – CAPACITY (500 LITERS):

Storage Tank will be made of SS 316; Tank Bottom will be Dished end. The Tank

will be mounted with 4 nos. of the castor wheels. Contact parts will be made of SS

316 & Non contact parts made of SS 304, Lid will be provided with 3/4th opening with

handle. Stirrer will be mounted on top of the Storage Tank. The tanks are

Polished and buffed from inside and outside to give mirror finish and are supplied

complete with lid, one outlet Ø1” Ball Valve, 3 nos. of handle.

STIRRER – CAPACITY 500 LITERS:

Stirrer will be mounted on top of the Storage Tank. Stirrer will be Suitable to mix

syrups and liquids. The stirring shaft and Impeller are made out of stainless steel

316. The motor is mounted along with flange to the fixture which is fitted to the tank.

The length of the shaft is appropriately design to give suitable mixing of the liquid

media. All the contact parts are Mirror finish to give the single piece joint.

V.F.D. (VARIABLE FREQUENCY DRIVE):

V.F.D. will be provided with AC Frequency drives unit made out of the “DELTA”

make (USA) to get the different range of RPM of Stirrer. Panel Board will be fitted to

the Tank.
ALLIED Page No.: 06

2. INSTRUCTIONS FOR UNPACKING AND CHECKING

1) Unpack the case and crate carefully under the supervision of a responsible
person and remove the contents without trying to force any package.

2) Check contents with the packing note.

3) Should any shortage be observed in the first check, the cases, individual package, also
the Packing material should be thoroughly searched for a second time in the
presence of a Components, the matter should be immediately brought to the
notice of M/s. Allied. Unit no.: 17, Param Industrial Estate, Naik Pada, Waliv
Vasai (E), District Thane–401 208 , Maharashtra, India.
Telephone nos.: (91–250-2451675) giving full reference of supply.

4) In case of breakage or damage, the nature and extent of each article, component
or Equipment should be documented in clear and precise terms and report must
be sent to The supplier with in a week of the receipt of the supply.

5) All the parts and components should be thoroughly cleared of packing materials
before Assembly with particular reference to moving parts.

6) All contact parts should be washed thoroughly with warm water and soap before
equipment is Put into production.
ALLIED Page No.: 07

03: DO'S & DON'TS:

DO’S

Carry out an in house inspection of the received Equipment before installing. The
inspection has to be carried out with a proper inspection instruments.

Make sure that the Equipment received are in accordance to your order, with respect
to the model no., sizes, MOC, surface finish, dimensions, quantity etc. Make a report
for your records.

 DONT’S

Do not collide the equipment at the time of installation, cause this may damage the
performance of the product.

Never use hammer directly on the equipment.


Do not use cotton waste for cleaning the equipment. Use only lint free cotton cloth.
ALLIED Page No.: 08

04. TECHNICAL SPECIFICATION

Model. : ALL/STWS–500

Capacity & Size of Tank. : 500 Liters & Size: Ø750 ID x 1200mm Ht.

Material of Construction. : Contact Parts = SS 316

: Non Contact Parts = SS 304

Gauge (Swg.) : 18-16-14 Swg.

Motor make. : “REMI” Make Motor.

Motor Details : 0.5 HP / 3 Phase / 440 Volts.

V.F.D. : Unit made out of the “DELTA” make (USA) to suit


The variable RPM

Surface Finishing. : Mirror / Matt Finish.


ALLIED Page No.: 09

4: Drawing
ALLIED Page No.: 10

05: CONCLUSION

Our ambition is to serve you better & better with the positive attitude.

We have carried out this “manual” exercise, by studying, which your

awareness on this Product, should have increased to a considerable

extent.

We are certain that you would ensure a neat, clean, systematic

operation procedure related to your equipment usage, cleaning, fitment,

maintenance & storage.

Being strong believers in customer satisfaction, we are sure that the

performance of our equipment on your working procedures, henceforth,

would help us accomplish our Goal of this millennium.

CUSTOMER DELIGHT
ALLIED Page No.: 11

06: A SHEET FOR YOUR COMMENTS

We request you to spare a few minutes of your precious time to inform us on:

ABOUT OUR EXISTING PRODUCT SUPPLIED TO YOU

________ Excellent ________ Good ________ Satisfactory

OUR DELIEVERY PERIOD

________ Excellent ________ Good ________ Satisfactory

OUR POST ORDER SUPPORT SERVICES

________ Excellent ________ Good ________ Satisfactory

OUR PRE - ORDER SUPPORT SERVICES

________ Excellent ________ Good ________ Satisfactory

Your suggestions, if any:


___________________________________________________________________
___________________________________________________________________
___________________________________________________________________
___________________________________________________________________
________________________

Name :
Designation :
Company Name :
Contact No. :
E – mail ID. :
Cell no. :
CERTIFICATE
Ref. No. : 001
Date : 1/10/2007

To,
Nicholas Piramal India Ltd,
Baddi
Village Bhatauli Khurd,
Baddi ( H.P). India

TO WHOMSOEVER IT MAY CONCERN

This is the Certificate for the Material of Construction for the Product
which we have supplied to you as per the below mention Invoice &
Purchase Order details given.

Material of Construction is SS 316

ITEM: STORAGE TANK WITH STIRRER – 500 LITERS

Document Details:
Our Invoice No. : 057
Invoice Date : 13/09/2007
You’re P. O. No. : 4300005976
PO Date. : 17/08/2007

Thanking you,
for Allied

Authorized Signatory
COVERING LETTER

Ref No.: All/CL/2007/NPIL- 90 Date: 1st October 2007

To,
Nicholas Piramal India Ltd,
Baddi
Village Bhatauli Khurd,
Baddi (H.P). India

KIND ATTN:- Mr. Bipendra Singh Jhinkwan


Dear Sir,

Subject: Submission of User Manual & Instruction Manual for Storage tank
with Stirrer Along with the MOC & Test Certificates. [Metallurgical
Testing, Routine Test (REMI) Certificate, & VFD]

Thanking you for placing the order with us.

With reference to your Purchase Order no. 4300005976, Dated: 17th August 2007,
we are pleased to submit the User Manual, MOC Certificate,

Thanking you once again,


We remain yours faithfully,
For ALLIED

BHARAT PANCHAL
Cell: 9821585292

You might also like