Professional Documents
Culture Documents
Grease Interceptor Calculation
Grease Interceptor Calculation
:
Al-Khobar, Saudi Arabia ACEC J.O. No.: 1153
CALCULATION COVER SHEET Page: 1 of 1
Client : Al-Khafji Joints Operation (KJO) Calculation No.:
Project : Construction of Senior and Junior Bachelors Quarter
CALC-C-007
Location : Al-Khafji, Saudi Arabia
CALCULATION TITLE:
Sizing of Grease Interceptor for the Construction of Senior and Junior Bachelors Quarter.
CALCULATION OBJECTIVE:
To determine the required volume flow (in gpm) of the Grease Interceptor for this project located at Khafji, Saudi Arabia
ASSUMPTIONS:
None
CONCLUSION:
1. Selected Grease Interceptor is JOSAM model 6011H rated at 100 gallons per minute.
Revision A 0 1 2 3 4 5
FIGURE 1.
INPUT DATA:
ANALYSIS:
3
Vt := VT⋅ m total fixture volume Vt = 265.493 gal
Veff
Qd := flow rate for 2-minute period Qd = 99.56 gpm
ds
USE: