Professional Documents
Culture Documents
RAB Konsultan HK2 PDF
RAB Konsultan HK2 PDF
JUMLAH
2 Teknisi
JUMLAH
3 Tenaga Penunjang
JUMLAH
JUMLAH Sub Total :
Total
Rp
60,000,000.00
150,000,000.00
50,000,000.00
30,000,000.00
30,000,000.00
320,000,000.00
Total
Rp
9,000,000.00
22,500,000.00
15,000,000.00
62,500,000.00
109,000,000.00
Total
Rp
7,500,000.00
4,750,000.00
4,750,000.00
4,000,000.00
4,000,000.00
25,000,000.00
-
B BIAYA NON PERSONIL
1 Mobilisasi & Demobilisasi
Rate Total
No Posisi Personil Perjl.
Rp Rp
JUMLAH 5,800,000.00
2 Perjalanan Dinas
Rate Total
No Posisi Personil Trip
Rp Rp
Tenaga Ahli
2 TA Jalan Raya 3 10.00 5,000,000.00 ###
3 TA Jembatan 1 10.00 5,000,000.00 50,000,000.00
4 TA Mekanika Tanah 1 3.00 5,000,000.00 15,000,000.00
5 TA Geodesi 1 3.00 5,000,000.00 15,000,000.00
JUMLAH ###
3 Sewa Kantor
Rate Total
No Jenis Jumlah Bulan
Rp Rp
JUMLAH 12,500,000.00
4 Lain - Lain
Rate Total
No Jenis Bulan
Rp Rp
JUMLAH 68,750,000.00
5 Pelaporan
JUMLAH 10,800,000.00
REKAPITULASI HARGA
Pekerjaan : Perencanaan Jalan HK 2
Lokasi : Kalimantan Tengah
Waktu : 5 bulan
No I T E M T O T A L
Terbilang :