Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

SCHEMATIC WATER SUPPLY PLAN

OVER FLOW SHALL BE LET


TO RECHARGE BORE WELL

INSULATED TANK
L1-OFF

4000 L
EXISTING
NEW TANK
2000L TANK

L2-ON

INSULATED PIPE
300 MM DEPTH CELL DECK
3 ROW COIL PAD WITH PUMP AND TANK SHOP USAGE
WITH PUMP

OUTLET

QUICK FILL
BORE PUMP SHALL WORK
WITH VALVE
BASED ON THE WATER
INLET
LEVEL CONTROLLER

PUMP P1 FLOAT
VALVE TANK
PUMP P2

BORE WELL PUMP


L1-HIGH LEVEL SHALL TURNED OFF

L2-LOW LEVEL BORE WELL PUMP


SHALL TURNED ON
BOREWELL

You might also like