APEX GLOBAL ENGINEERING SDN BHD (828911-T)

Attachment XXXI

Anchor Handling and Towing Checklist

Vessel: Date: Location:


Check with “ü” or “NA”
No Items Check ü or NA Remarks

1 Meeting Held on Board, discussions to include:


Pennant Lengths, Links, Sequence of Anchor
handling, Tow Routes, Navigation warning,
Standoff position.
Rig Move procedures/Meeting Minutes signed
and filed

2 BA Charts updated and TOPO Charts available

3 VHF working Channel agreed CH:


Alternative Channel agreed CH:

4 Deck Space Clear

5 Towing, work and tugger wires, shackles in good


condition

6 Towing, working and tugger winches operational

7 Towing pins tested and operational

8 Shark Jaws/Karm forks operational

9 Stern roller in good working order

10 Sufficient Spare Shackles, split pins and wires

11 Engines and Thruster in good working order

12 Navigational equipment in good working order

13 Light and day signals available/working

14 Job Hazard Analysis and Tool box talk conducted.


Copies filed accordingly
APEX GLOBAL ENGINEERING SDN BHD (828911-T)

15 Designated person to direct lifting operations


with rig, Banksman jacket available

16 Towing stretcher ready, inspected, good condition

17 Hand-over of tow between tug and tow master


discussed

18 Routine and emergency communications agreed


upon, telephone numbers exchanged (All parties
aware of STOP procedure)

19 Communications tested between Bridge, Deck


and Rig

20 All water tight doors and hatches secure

21 Deck tools checked. One full set to placed each


side of deck

Master Name:_____________________ Master’s Signature:____________________

File on board