Drill Report - Attachment LIII

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 5

APEX GLOBAL ENGINEERING SDN BHD (828911-T)

Attachment LIII
Drills Report
Section 1 - General Information

Page 1 of 3
APEX GLOBAL ENGINEERING SDN BHD (828911-T)

Vessel name Call Sign


IMO No Flag
Gross tonnage Type of vessel
Vessel Length Breadth
Draft Forward Draft Aft
Type of Drill
Shipboard Contingency Plan * Report No:
* Report No. format: Vessel Code/ Drill/event no/ year
Date of event Time of event
*Position Lat/Long or Bearing/Dist
Area of operation Operation type
Vessel Course (T) Speed in knot
** Enroute: From To destination
*If vessel in port, then the port’s name should suffice
**If in port, “NA” should be entered

Wind
Swell Direction/Height
Direction/Speed
Height of wind Current
waves Direction/Speed
Visibility Weather condition
Other environmental
Air Temperature
factors

Radio Station (s) Date/Time of


Guarded (VHF etc) Next Report

Page 2 of 3
APEX GLOBAL ENGINEERING SDN BHD (828911-T)

Type & Quantity of Type & Quantity


Cargo (if any) of Bunker

Section 2 - Chronological Event

TIME EVENTS

Section 3 - LSA & FFA Equipment Used and Tested

Section 4 - Debriefing after Drill (Area for improvement and recommendations)


Page 3 of 3
APEX GLOBAL ENGINEERING SDN BHD (828911-T)

(a) Crew competency

(b) LSA & FFA condition

Section5 - * Performance Indicators (where applicable)


S/No. Activity Target Actual Units
a Time taken to launch Fast Rescue Craft 5 minutes
b Speed of FRC maneuverability in the water ** knots
c Time taken to recover FRC 5 minutes
d Time taken to muster at emergency station 3 minutes
e Time taken to don life jackets 1 minutes
f Time taken to don Fireman outfit with SCBA 3 minutes
g Time taken from start of pump to deliver water at 1 minutes
h hydrant water pressure at hydrant
Minimum ** bar
i Fire hoses used not from same hydrant 2 numbers
j Time taken to rig 2 sets of fire hoses 2 minutes
k Time taken to escape from E/R via emergency 5 minutes
l escape route
Minimum pressure Fi - Fi ** bar
m Distance of throw of Fi - Fi ** meter
* If during a drill any of the above items are not applicable please insert “NA”
**Please indicate Maker’s Spec capabilities and optimum performance.

Section 6 - Remarks (if any).

Page 4 of 3
APEX GLOBAL ENGINEERING SDN BHD (828911-T)

Reported by:

Name of Master Name of Chief Officer

NOTE:
1. One copy to be filed onboard.
2. Transmit Drill Report electronically to AGE operation (without signature) not later than 24 hrs after drill exercise.
3. Master to indicate drills conducted for that month.

Page 5 of 3

You might also like