Pasir 1

Pasir 2
Pasir 3
Pasir 4
Pasir 5
Split 1
Split 2
Combine SNI
SIEVE ANALYSIS
Description And Source : Pasir Lampung Tengah Plant : LAMPUNG 1 & 2
of Sample ………………………….
Date of Received : ………………………….
Date of Tested : Oktober 2018
To be used for : Concrete

Total Wight of Sample : 500 gr


Pasir Lampung ( Plant 1&2) ASTM C-33
Retained Lower Upper
Reained Passing Colmulatif
No Number / sieve size Comulatif Limit Limit
gr % % gr % % %
1 3/8" 9.53 mm - - 500.00 100.00 100 100
2 no. 4 4.75 mm 3.00 0.60 0.60 497.00 99.40 95 100
3 no. 8 2.36 mm 17.00 3.40 4.00 480.00 96.00 80 100
4 no. 16 1.18 mm 60.00 12.00 16.00 420.00 84.00 50 85
5 no. 30 0.60 mm 140.00 28.00 44.00 280.00 56.00 25 60
6 no. 50 0.30 mm 105.00 21.00 65.00 175.00 35.00 5 30
7 no. 100 0.15 mm 125.00 25.00 90.00 50.00 10.00 0 10
8 no. 200 0.08 mm 50.00 10.00 100.00 - - 0 0
9 pan - - 100.00 - - 0 0
Total 500.00 219.60
FM 2.20 (2.1 sd 3.1 ASTM C-33)

100.00
90.00
80.00
70.00
Percentage of Passing

60.00
50.00
40.00
30.00
20.00
10.00
-
pa n #200 #100 #50 #30 #16 #8 #4 3/8"
Sieve Size (mm)

Note :

Approval By Checked By Tested By


Date : ………………… Date : ………………… Date : …………………
SIEVE ANALYSIS
Description And Source : Pasir Lampung Tengah Plant : LAMPUNG 1 & 2
of Sample ………………………….
Date of Received : ………………………….
Date of Tested : Oktober 2018
To be used for : Concrete

Total Wight of Sample : 1,130 gr


Pasir Lampung ( Plant 3) ASTM C-33
Retained Lower Upper
Reained Passing Colmulatif
No Number / sieve size Comulatif Limit Limit
gr % % gr % % %
1 3/8" 9.53 mm 40.00 3.54 3.54 1,090.00 96.46 100 100
2 no. 4 4.75 mm 100.00 8.85 12.39 990.00 87.61 95 100
3 no. 8 2.36 mm 110.00 9.73 22.12 880.00 77.88 80 100
4 no. 16 1.18 mm 70.00 6.19 28.32 810.00 71.68 50 85
5 no. 30 0.60 mm 230.00 20.35 48.67 580.00 51.33 25 60
6 no. 50 0.30 mm 120.00 10.62 59.29 460.00 40.71 5 30
7 no. 100 0.15 mm 200.00 17.70 76.99 260.00 23.01 0 10
8 no. 200 0.08 mm 130.00 11.50 88.50 130.00 11.50 0 0
9 pan 130.00 11.50 100.00 - - 0 0
Total 1,130.00 251.33
FM 2.51 (2.1 sd 3.1 ASTM C-33)

100.00
90.00
80.00
70.00
Percentage of Passing

60.00
50.00
40.00
30.00
20.00
10.00
-
pa n #200 #100 #50 #30 #16 #8 #4 3/8"
Sieve Size (mm)

Note :

Approval By Checked By Tested By


Date : ………………… Date : ………………… Date : …………………
SIEVE ANALYSIS
Description And Source : Pasir Lampung Tengah Plant : LAMPUNG 1 & 2
of Sample ………………………….
Date of Received : ………………………….
Date of Tested : Oktober 2018
To be used for : Concrete

Total Wight of Sample : 906 gr


Pasir Lampung ( Plant 3) ASTM C-33
Retained Lower Upper
Reained Passing Colmulatif
No Number / sieve size Comulatif Limit Limit
gr % % gr % % %
1 3/8" 9.53 mm 59.00 6.51 6.51 847.00 93.49 100 100
2 no. 4 4.75 mm 48.00 5.30 11.81 799.00 88.19 95 100
3 no. 8 2.36 mm 128.00 14.13 25.94 671.00 74.06 80 100
4 no. 16 1.18 mm 207.00 22.85 48.79 464.00 51.21 50 85
5 no. 30 0.60 mm 232.00 25.61 74.39 232.00 25.61 25 60
6 no. 50 0.30 mm 102.00 11.26 85.65 130.00 14.35 5 30
7 no. 100 0.15 mm 95.00 10.49 96.14 35.00 3.86 0 10
8 no. 200 0.08 mm - 96.14 35.00 3.86 0 0
9 pan 35.00 3.86 100.00 - - 0 0
Total 906.00 349.23
FM 3.49 (2.1 sd 3.1 ASTM C-33)

100.00
90.00
80.00
70.00
Percentage of Passing

60.00
50.00
40.00
30.00
20.00
10.00
-
pa n #200 #100 #50 #30 #16 #8 #4 3/8"
Sieve Size (mm)

Note :

Approval By Checked By Tested By


Date : ………………… Date : ………………… Date : …………………
SIEVE ANALYSIS
Description And Source : Pasir Lampung Tengah Plant : LAMPUNG 1 & 2
of Sample ………………………….
Date of Received : ………………………….
Date of Tested : Oktober 2018
To be used for : Concrete

Total Wight of Sample : 1,000 gr


Pasir Lampung ( Plant 3) ASTM C-33
Retained Lower Upper
Reained Passing Colmulatif
No Number / sieve size Comulatif Limit Limit
gr % % gr % % %
1 3/8" 9.53 mm 28.00 2.80 2.80 972.00 97.20 100 100
2 no. 4 4.75 mm 99.00 9.90 12.70 873.00 87.30 95 100
3 no. 8 2.36 mm 97.00 9.70 22.40 776.00 77.60 80 100
4 no. 16 1.18 mm 108.00 10.80 33.20 668.00 66.80 50 85
5 no. 30 0.60 mm 241.00 24.10 57.30 427.00 42.70 25 60
6 no. 50 0.30 mm 125.00 12.50 69.80 302.00 30.20 5 30
7 no. 100 0.15 mm 269.00 26.90 96.70 33.00 3.30 0 10
8 no. 200 0.08 mm - 96.70 33.00 3.30 0 0
9 pan 33.00 3.30 100.00 - - 0 0
Total 1,000.00 294.90
FM 2.95 (2.1 sd 3.1 ASTM C-33)

100.00
90.00
80.00
70.00
Percentage of Passing

60.00
50.00
40.00
30.00
20.00
10.00
-
pa n #200 #100 #50 #30 #16 #8 #4 3/8"
Sieve Size (mm)

Note :

Approval By Checked By Tested By


Date : ………………… Date : ………………… Date : …………………
SIEVE ANALYSIS
Description And Source : Pasir Lampung Tengah Plant : LAMPUNG 1 & 2
of Sample ………………………….
Date of Received : ………………………….
Date of Tested : Oktober 2018
To be used for : Concrete

Total Wight of Sample : 1,000 gr


Pasir Lampung ( Plant 3) ASTM C-33
Retained Lower Upper
Reained Passing Colmulatif
No Number / sieve size Comulatif Limit Limit
gr % % gr % % %
1 3/8" 9.53 mm - - - 1,000.00 100.00 100 100
2 no. 4 4.75 mm - - - 1,000.00 100.00 95 100
3 no. 8 2.36 mm 28.00 2.80 2.80 972.00 97.20 80 100
4 no. 16 1.18 mm 97.00 9.70 12.50 875.00 87.50 50 85
5 no. 30 0.60 mm 160.00 16.00 28.50 715.00 71.50 25 60
6 no. 50 0.30 mm 388.00 38.80 67.30 327.00 32.70 5 30
7 no. 100 0.15 mm 292.00 29.20 96.50 35.00 3.50 0 10
8 no. 200 0.08 mm - 96.50 35.00 3.50 0 0
9 pan 35.00 3.50 100.00 - - 0 0
Total 1,000.00 207.60
FM 2.08 (2.1 sd 3.1 ASTM C-33)

100.00
90.00
80.00
70.00
Percentage of Passing

60.00
50.00
40.00
30.00
20.00
10.00
-
pa n #200 #100 #50 #30 #16 #8 #4 3/8"
Sieve Size (mm)

Note :

Approval By Checked By Tested By


Date : ………………… Date : ………………… Date : …………………
SIEVE ANALYSIS
Description And Source : Split 10-20 PT.BERLIAN MIXINDO Plant : LAMPUNG 1&2
of Sample ………………………….
Date of Received : ………………………….
Date of Tested : Oktober 2018
To be used for : Concrete

Total Wight of Sample : 2,000 gr


SPLIT ( 10 - 20 mm ) Lampung ASTM C-33
Retained Lower Upper
Reained Passing Colmulatif
No Number / sieve size Comulatif Limit Limit
gr % % gr % % %
1 1.5 " 37.50 mm - - - 2,000.00 100.00 100 100
2 1" 25.40 mm - - - 2,000.00 100.00 90 100
3 3/4 " 19.00 mm 937.00 46.85 46.85 1,063.00 53.15 20 55
4 3/8 " 9.50 mm 1,037.00 51.85 98.70 26.00 1.30 0 5
5 no 4 4.75 mm 11.00 0.55 99.25 15.00 0.75 0 0
6 no 8 2.36 mm 4.00 0.20 99.45 11.00 0.55 0 0
7 no 16 1.180 mm 4.00 0.20 99.65 7.00 0.35 0 0
8 no 30 0.600 mm - - 99.65 7.00 0.35 0 0
9 no. 50 0.300 mm - - 99.65 7.00 0.35 0 0
10 no. 100 0.150 mm - - 99.65 7.00 0.35 0 0
11 no. 200 0.075 mm 7.00 0.35 100.00 - - 0 0
12 pan - 100.00 - - 0 0
Total 2,000.00 942.85
FM 9.43

100.00
90.00
80.00
70.00
60.00
Axis Title

50.00
40.00
30.00
20.00
10.00
-
pan no. 200 no. 100 no. 50 no 30 no 16 no 8 no 4 3/8 " 3/4 " 1.5 " 1"
Axis Title

Note :

Approval By Checked By Tested By


Date : ………………… Date : ………………… Date : …………………
SIEVE ANALYSIS
Description And Source : Split 20-30 Plant : Lampung 1&2
of Sample ………………………….
Date of Received : ………………………….
Date of Tested : Oktober 2018
To be used for : Concrete

Total Wight of Sample : 3,007 gr


SPLIT ( 20 - 30 mm ) Lampung 2 ASTM C-33
Retained Lower Upper
Reained Passing Colmulatif
No Number / sieve size Comulatif Limit Limit
gr % % gr % % %
1 1.5 " 37.50 mm - - - 3,007.00 100.00 100 100
2 1" 25.40 mm 1,080.00 35.92 35.92 1,927.00 64.08 90 100
3 3/4 " 19.00 mm 1,812.00 60.26 96.18 115.00 3.82 20 55
4 3/8 " 9.50 mm 97.00 3.23 99.40 18.00 0.60 0 5
5 no 4 4.75 mm 18.00 0.60 100.00 - - 0 0
6 no 8 2.36 mm - 100.00 - - 0 0
7 no 16 1.180 mm - 100.00 - - 0 0
8 no 30 0.600 mm - 100.00 - - 0 0
9 no. 50 0.300 mm - 100.00 - - 0 0
10 no. 100 0.150 mm - 100.00 - - 0 0
11 no. 200 0.075 mm - 100.00 - - 0 0
12 pan - - 100.00 - - 0 0
Total 3,007.00 1,031.49
FM 10.31

100.00
90.00
80.00
70.00
60.00
Axis Title

50.00
40.00
30.00
20.00
10.00
-
pan no. 200 no. 100 no. 50 no 30 no 16 no 8 no 4 3/8 " 3/4 " 1.5 " 1"
Axis Title

Note :

Approval By Checked By Tested By


Date : ………………… Date : ………………… Date : …………………
COMBINE SIEVE ANALYSIS (ESTIMATION)
Description And Source : Plant Lampung 1&2
of Sample
Date of Received :
Date of Tested : Oktober 2018
To be used for : Concrete

Total Wigh
30% 70%
Sand Split 2-3 Split 1-2 Retained Retained Comulative
No No / sieve size
41.500% 17.55% 40.95% gr % %
1 1" 25.40 mm - - - - - -
2 3/4 " 19.00 mm - 3.09 493.13 496.22 9.01 9.01
3 3/8 " 9.50 mm - 25.90 1,290.25 1,316.15 23.90 32.91
4 #4 4.75 mm 29.71 398.00 397.43 825.14 14.98 47.89
5 #8 2.36 mm 102.84 472.99 38.28 614.12 11.15 59.05
6 # 16 1.18 mm 301.67 33.44 - 335.11 6.09 65.13
7 # 30 0.60 mm 450.22 11.40 - 461.63 8.38 73.51
8 # 50 0.30 mm 911.88 5.22 - 917.10 16.65 90.17
9 # 100 0.15 mm 427.37 7.73 - 435.10 7.90 98.07
10 # 200 0.075 mm 61.71 8.70 36.03 106.43 1.93 100.00
pan - - - - - 98.07
Total 2,285.41 966.48 2,255.12 5,507.00 100.00 575.74
FM 5,507.00 2285.405 5.76

100

90

80

70
67.09
Passing Percentage (%)

60
52.11
50
40.95
40 34.87

30 26.49

20
9.83
10
1.93
- -
0
pan # 200 # 100 # 50 # 30 # 16 #8 #4 3/8 "

Upper Bottom Gradation No / Sieve Size


Note :

Approval By Checked By Test


S/A 41.50%

Coarse 58.50%

Total Wight of Sample : 5,507 gr


ACI
Passing Lower Upper
Comulative Limit Limit
% lolos % %
100.00 100 100
90.99 100 100
67.09 55 70
52.11 40 58
40.95 28 47
34.87 18 35
26.49 12 25
9.83 7 14
1.93 3 8
- 0 0
-

90.99 100.00

67.09

3/8 " 3/4 " 1"


Tested By
COMBINE SIEVE ANALYSIS (ESTIMATION)

Description And Source : Plant Lampung 1&2


of Sample
Date of Rece :
Date of Tested : Oktober 2018
To be used for : Concrete

100% 0% 0% 0% 0% 60%
Pasir 1 Pasir 2 Pasir 3 Pasir 4 Pasir 5 Split 1
No No / sieve size
42.00% 0.00% 0.00% 0.00% 0.00% 34.80%
1 1" 25.40 mm - - - - - -
2 3/4 " 19.00 mm - - - - - 937.00
3 3/8 " 9.50 mm - - - - - 1,037.00
4 #4 4.75 mm 3.00 - - - - 11.00
5 #8 2.36 mm 17.00 - - - - 4.00
6 # 16 1.18 mm 60.00 - - - - 4.00
7 # 30 0.60 mm 140.00 - - - - -
8 # 50 0.30 mm 105.00 - - - - -
9 # 100 0.15 mm 125.00 - - - - -
10 # 200 0.075 mm 50.00 - - - - 7.00
pan - - - - - -
Total 500.00 - - - - 2,000.00

100.00

90.00

80.00

70.00
Passing Percentage (%)

60.00

50.00

40.00

30.00
19.78
20.00 16.98
14.88
12.38
10.00
- -
-
pan # 200 # 100 # 50 # 30 # 16
N
Combine Column Z Column AA Column AB Column AC
- -
-
pan # 200 # 100 # 50 # 30 # 16
N
Combine Column Z Column AA Column AB Column AC

Note :

Approval By Checked By
max agg. 20 mm

S/A 42.00%

Coarse 58.00%

Total Wight of Sample : 5,000 gr


40% SNI 03-2834-2000
Passing
Split 2 Retained Retained Comulative 1 2 3 4
Comulative
23.20% gr % % % lolos % % % %
1,080.00 1,080.00 0.22 0.22 99.78 100 100 100 100
1,812.00 2,749.00 54.98 55.20 44.80 100 100 100 100
97.00 1,134.00 22.68 77.88 22.12 45 55 65 75
18.00 32.00 0.64 78.52 21.48 30 35 42 48
- 21.00 0.42 78.94 21.06 23 28 35 42
- 64.00 1.28 80.22 19.78 16 21 28 34
- 140.00 2.80 83.02 16.98 9 14 21 27
- 105.00 2.10 85.12 14.88 2 3 5 12
- 125.00 2.50 87.62 12.38 0 0 2 4
- 57.00 1.14 100.00 - 0 0 0 0
- - - 100.00 -
3,007.00 5,507.00 88.76 626.70
FM : 6.27

99.78

44.80

21.06 21.48
19.78 22.12

# 16 #8 #4 3/8 " 3/4 " 1"


No / Sieve Size
# 16 #8 #4 3/8 " 3/4 " 1"
No / Sieve Size

Tested By
40.00
f(x)
f(x)==6.3842295273
9.413840841 x^-1.6317131249
x^-2.043695396
Kuat Tekan (Mpa)

35.00

30.00

25.00

20.00

15.00

10.00

5.00

-
0.30 0.40 0.50 0.60 0.70 0.80 0.9
FAS
Mutu Target (karakteristik) Mutu Rencana
fc' (Mpa) K (kg/cm2) fc' (Mpa) K (kg/cm2)
20.00 240.96 24.10 290.36

fc' (Mpa) K (kg/cm2) fc' (Mpa) K (kg/cm2)


30.00 361.45 34.10 410.84

Hasil Trial Plant 1&2 - (Material Gunung sugih - Area Lampung Tenga
Semen Target Slump Real Slump Fas
(kg)
Kuat Tekan 7 hari
a b c d
Estimasi 28 hari
190 12 ± 2 cm 8 cm 0.79
Trend Line 28 hari 210 12 ± 2 cm 14 cm 0.72
Real 28 hari 240 12 ± 2 cm 14 cm 0.63
Trend Real 28 hari
250 12 ± 2 cm 10 cm 0.63
270 12 ± 2 cm 12 cm 0.59
300 12 ± 2 cm 12 cm 0.53

300 12 ± 2 cm 11 cm 0.53
320 12 ± 2 cm 10 cm 0.49
390 12 ± 2 cm 11.5 cm 0.41
0.80 0.90
tabel ini didapat dari trial tanpa menargetkan mutu yang d

Mutu 29
Fly Ash 15%
semen 5.67 x fly ash
α 0.4
Fas 0.47
Air 169.6
Cementious 360.85
Cement 306.72
Flyash 54.13
*formula pak dadi

Mutu 29
Fly Ash 10%
semen 9.00 x fly ash
α 0.7
Fas 0.59
Air 171.2
Cementious 290.17
Cement 261.15
Flyash 29.02
*formula pak dadi
FA Slump Fas Air Sementious
(%) (cm) (ltr) (kg)) (kg))
- 12±2 0.52 190.00 363.91 364.00

(%) (cm) (ltr) (kg)) (kg))


- 12±2 0.45 190.00 418.09 419.00

h - Area Lampung Tengah) Kuat Tekan ( Mpa)


Pasir Split 1-2 S/A 3 hari 7 hari est 28 hari 28 hari fc'
(kg) (kg) 72% realisasi
e f g h i j k m=k-(1.64 x 2.5)
1145 962 0.54 5.09 8.49 11.79 12.36 8
1130 902 0.56 5.66 6.23 8.65 14.16 10
1122 942 0.54 9.05 11.32 15.72 20.55 16

1085 951 0.53 6.79 11.88 16.51 20.83 17


1065 931 0.53 11.32 16.98 23.58 27.77 24
1065 931 0.53 14.15 22.07 30.65 29.99 26

1065 931 0.53 13.87 16.98 23.58 29.44 25


1041 883 0.54 13.30 18.11 25.15 27.22 23
986 934 0.51 21.22 25.47 35.37 34.99 31
argetkan mutu yang didapat namun terkontrol slumpnya
Air Rencana
(ltr)

151 0.54
151 0.56
151 0.54

158 0.53
158 0.53
158 0.53

158 0.53
158 0.54
158 0.51
Air bebas awal (ltr) : A
Kadar Fly Ash (%) : B
Pengurangan Air
- pengurangan (ltr) : Ar Ar : Rencana pengurangan Air (berda
: As = A - Ar atau "pedoman beton dengan fly

Fas(faktor air semen) : Fas


Semen (kg) : C = (1 - B%) x As
{1 - (0.7 x B%)} x Fas
Fly Ash (kg) : FA = C x B%
(1 - B%)
1 2 3 4 5 6
Draft Mix Design Lampung

Cement
Mutu Slump Cementious
No Kode Type I

(Mpa) (kg/cm2) (cm) (kg) (C kg)

1 Trial Rigid K - 350 30 361.45 3+2 406 406

Material Harga Material BJ ABS (%) FM


Semen Rp 1,040.00 3.15 - -
Fly ash Rp 500.00 2.15 - -
Pasir 1 Rp 180.00 2.63 3.20 2.60
Pasir 2 Rp 180.00 2.63 3.20 2.60
Split 1 Rp 177.78 2.69 1.80 7.30
Split 2 Rp 166.67 2.70 1.80 7.50
Addmxtr Rp 9,500.00 1.17 - -
Sprplzt Rp 25,000.00 1.02 - -
na pengurangan Air (berdasarkan trial / pengalaman)
pedoman beton dengan fly ash"

: Cukup kotak kuning yang diisi

7 8 9 10 11 12 13 14 15 16

Fas Admixture Admixture


Fly Ash Fas Water Water correction S/A
correction Type D Superplazt
(%)

(B %) (FA kg) (kg) (kg) (ltr) (As ltr) + / - (ltr) (ltr) (ltr)

- - 0.35 0.35 140.00 140.00 0 45.00

1.145
0.43 45.8
-
17 18 19 20 21 22 23 24 25 26

Pasir 1 Pasir 2 Split 1-2 Split 2-3 Vol pasta Vol Agg

(%) (kg) (%) (kg) (%) (kg) (%) (kg) (ltr) (ltr)

100.0 865 - - 22.0 432.71 33 651 268.82 731


27 28 29 30

Density Harga Keterangan Kontrol Mortar

(kg/m3) (Rp) (kg)

2,495 773,797 1,411


LABORATORIUM BETON

Project : Pembangunan Jalan Toll Lintas Sumatera


Location : Plant Lampung 1&2 Kode Mix :
Quality (f'c / K / B ) : fc' 30.00 ~ K 361 Trial Rigid K - 350
Max Slump : 3+2
Max Size : 20
Water Cement Ratio : 0.345

Bulk SSD Specific Gravity of Cement Type I : 3.15


Bulk SSD Specific Gravity of Fly Ash : 2.15
Bulk SSD Specific Gravity of Fine agg. Pasir 1 : 2.63
Bulk SSD Specific Gravity of Fine agg. Pasir 2 : 2.63
Bulk SSD Specific Gravity of Coarse agg. Split 1-2 : 2.69
Bulk SSD Specific Gravity of Coarse agg. Split 2-3 : 2.69
Specific Gravity of Water : 1.00
Specific Gravity of Admixture Type D ( LIGNO C-165 ) : 1.17

Water ( H2O ) : 140 ltr : 140 liter


Cement : 406 kg : 128.82 liter
Fly Ash 0% : - kg : 0.00 liter
Add Type D : - kg : 0.00 liter
Add Type F : - kg : - liter
Air Content / void : 1.0% kg : 10 liter

Volume of Paste : 278.82 liter


Volume of Agg : 721.18 liter

Fine Agg 1 : 45.00 % : 324.53 Cu.meter 865 kg/m3


Fine Agg 2 : - % : 0.00 Cu.meter - kg/m3
Medium Agg. 10 - 20 : 22.00 % : 158.66 Cu.meter 433 kg/m3
Coarse Agg 20 - 30 : 33.00 % : 237.99 Cu.meter 651 kg/m3

TOTAL WEIGHT OF AGGREGATE : 1949.53 kg/m3


TOTAL WEIGHT OF FRESH CONCRETE : 2495.33 kg/m3

Resume :
Cement Type I 406 kg
Fly Ash - kg
Water 140 ltr
Fine Agg (Natural Sand) 1 865 kg
Fine Agg (Natural Sand) 2 - kg
Coarse Agg 1 433 kg
Coarse Agg 2 651.48 kg
Admixture (type D) - ltr
Admixture (type F) - ltr
2,495.33
Checked Design By,

Pudji Antoro TRI AGUS TIO


Lab Sentral Lab Supervisor
LABORATORIUM BETON

Project : Pembangunan Jalan Toll Lintas Sumatera


Location : Plant Lampung 1&2 Kode Mix :
Quality (f'c / K / B ) : fc' 30.00 ~ K 361 Trial Rigid K - 350
Max Slump : 3+2
Max Size : 25
Water Cement Ratio : 0.345

Bulk SSD Specific Gravity of Cement Type I : 3.15


Bulk SSD Specific Gravity of Fly Ash : 2.15
Bulk SSD Specific Gravity of Fine agg. Ex Tj Wangi : 2.63
Bulk SSD Specific Gravity of Medium agg.10 - 25 Ex Berlian : 2.69
Bulk SSD Specific Gravity of Coarse agg.20 - 30 Ex Berlian : 2.69
Specific Gravity of Water : 1.00
Specific Gravity of Admixture Type D ( LIGNO C-165 ) : 1.17

Water ( H2O ) : 140 ltr : 140 liter


Cement : 406 kg : 128.82 liter
Fly Ash 0% : - kg : 0.00 liter
Add : - ltr : 0.00 liter
Air Content / void : 1.0% 10 liter

Volume of Paste : 278.82 liter


Volume of Agg : 721.18 liter

Fine Agg : 42.00 % : 302.89 Cu.meter 814.78 kg/m3


Medium Agg. 10 - 20 : 23.20 % : 167.31 Cu.meter 450.07 kg/m3
Coarse Agg 20 - 30 : 34.80 % : 250.97 Cu.meter 250.97 kg/m3

TOTAL WEIGHT OF AGGREGATE : 1515.82 kg/m3


TOTAL WEIGHT OF FRESH CONCRETE : 2061.62 kg/m3

Resume :
Cement Type I 405.80 kg
Water 140.00 ltr
Fine Agg (Natural Sand) 814.78 kg
Coarse Agg (10-20 mm) 450.07 kg
Coarse Agg (20-30 mm) 250.97 kg
Admixture (type D) - ltr
2,061.62
Checked Design By,

Pudji Antoro TRI AGUS TIO


Lab Engineer
Tanggal 4-May-19
Kode Mix Design Trial Rigid K - 350 -------> linkan ke sheet hitungan, yang lain akan mengikuti
Mutu Trial Rigid K - 35 K 361
Slump 40 cm

RENCANA MIX DESIGN HASIL TRIAL


MATERIAL
Volume Volume
JENIS ASAL TYPE SG MC ABS Satuan 1m³ SSD 1m³ Trial ( m³ ) Trial ( m³ ) 1m³
Adjusment 0.025 0.025 Adjusment

Semen Ex. Semen Merah Putih OPC 3.15 Kg 406 406 10.14
Fly Ash Kg - - -
Split 1 EX.PROGO Max 20 mm 2.69 1.00% 1.00% Kg 433 433 10.82
(10-20 mm)
Split 2 EX.PROGO Max 10 mm 2.69 1.00% 1.00% Kg 651 651 16.29
(20-30 mm)
Pasir 1 EX.PROGO Alami 2.63 0.50% 0.50% Kg 865 865 21.63
(Pasir Alam)
Pasir 2 EX.PROGO Alami 1.17 0.00% 0.00% Kg - - -
(Pasir Alam)
Air Air Tanah Alami 1.00 lt 140 140 3.50

DOSIS %
Admixture Type
Admixture Nexco 1.07 0.30% lt Err:509 Err:509 Err:509
D
Berat Beton Err:509 Err:509 Err:509
Note :
DATA PENGETESAN BENDA UJI

Luas
Berat Kuat Konversi
Umur Beban Max Penampan
Tanggal Cor Tanggal Tes Beton Tekan umur 28
( Hari ) (KN) g
(kg) (Mpa) Hari
(mm2)
Diketahui Disetujui
PT. PP URBAN
PLANT Lampu 1&2

TRIAL
me DATA HASIL ADUKAN
1m³
SSD Slump awal
Slump + 45 mnt -
W/C rencana 0.35
W/C real -
Cemen/Agg 20.82%
Sand/Agg 44.39%
Air
BJ Campuran 2.66
Add F -
Add D Err:509
Visual Kehalusan Normal
Berat W adah
Berat W adah + Beton
Berat Beton 0.00 kg
Volume W adah 0.005 m3

Density 0 kg/m3

Yield Err:509
KETERANGAN
Dibuat
JOB MIX FORMULA (JMF) HARIAN

Plant : Plant 1&2 Lampung Tanggal :

Mutu : K-700 Kode mix :

Slump : 45-50
Project : New Lampung
Di isi manual dari u
Material Brt Jenis Absorp MC Real
Pasir 1 2.63 3.20% 0.60%
kadar air lapanga
Pasir 2 2.63 3.20% 2.80%
Split 1 2.69 1.80% 2.10%
Split 2 2.70 1.80% 2.20%

Mix
Adjust Komposisi Job Mix (JMF) / m3
No Material satuan Design
1 m3 1 m3 0.500 1.000

A Pasta - - -
1 Semen kg - - - -
FAS (W/C) 0.35
2 Air ltr 140.00 158.01 79.01 158.01
3 Admixture D ltr - - - -
Superplatz ltr - - - -

Agregate
4 Pasir 1 kg 865.35 843.42 421.71 843.42
5 Pasir 2 kg - - - -
6 Split 10-20 kg 432.71 434.01 217.01 434.01
7 Split 20-30 kg 651.48 651.48 325.74 651.48

Berat (density) kg/m3 2,089.53 2,086.92 1,043.46 2,086.92

Note :

Dibuat Oleh Disetujui Oleh

................................... .................................
Chief Lab PT.PP URBAN
5 Oktober 2018
Trial Rigid K - 350

Di isi manual dari ukur


kadar air lapangan

Komposisi Job Mix (JMF) / m3

2.000 4.000

- -
- -

316.02 632.04
- -
- -

1,686.83 3,373.67
- -
868.02 1,736.05
1,302.95 2,605.91

4,173.83 8,347.67

Disetujui Oleh

...................................
FORM PERENCANAAN CAMPURAN

No. Referensi :

TABEL / GRAFIK
No URAIAN
PERHITUNGAN

1 Kuat Tekan Karakteristik Di tetapkan


2 Standard Deviasi Di tetapkan
3 Nilai Tam bah ( Margin)
4 Kuat Tekan rata rata Target no 1 + no 3
5 Jenis Semen Di tetapkan
6 Jenis Silica Fume Di tetapkan
7 Jenis Aggregate Halus Di tetapkan
8 Jenis Aggregate Kasar Di tetapkan
9 Faktor Air Sementitious Bebas Tabel CC Standard
10 Slump Di tetapkan
11 Ukuran Aggregate Maximum Di tetapkan
12 Kadar Air bebas Di tetapkan
13 Kadar Semen no 12: no 9
14 Kadar Silica Fume -
15 Retarder Tipe D
16 Superplasticizer Tipe F
17 Kadar Semen: - Minimum Di tetapkan
18 Kadar Fly Ash : - Minimum Di tetapkan
19 Persentase Aggregate Halus 1 Di tetapkan
20 Persentase Aggregate Ha lus 2 Di tetapkan
21 Persentase Aggregate Kasar Di tetapkan
22 Berat Jenis Aggregate Halus 1 Di Ketahui
23 Berat Jenis Aggregate Halus 2 Di Ketahui
24 Berat Jenis Aggregate Kasar Di Ketahui
no 12 + no 13 + no 2 7 +no
25 Berat Jenis Beton 28 + no 29
26 Kadar Aggregate gabungan Di tetapkan
27 Kadar Aggregate Halus 1 no 23xno 18 x no 21
28 Kadar Aggregate Halus 2 no 23xno 19 x no 22
29 Kadar Aggregate Kasar no 23xno 20 x no 23

Komposisi / m3
No Jenis Material Jumlah
1 Semen 405.80
2 Fly ash -
3 Air 140.00
4 Split 10/25 Eks PT.Berlian Mixindo 1,066.98
5 Agregat halus 1 (Lampung) 1,038.49
6 Agregat halus 2 -
7 Retarder 1.19
8 Superplastizer -
NCANAAN CAMPURAN BETON
Trial Rigid K - 350
Rev 1

NILAI

fc' 30 N/mm2 Umur 28 hari faktor cacat 5%


2.50 N/mm2
1.64 x 2.50 = 4.10 N/mm2
30.00 + 4.10 = 34.10 N/mm2
Semen Portland Type I SG = 3.15
SG = 2.15
Alami /
Batu pecah /
0.35
3+2 cm s/d 5.00 cm
25.00 mm Menurut RKS
140.00 ltr
140.00 / 0.35 = 405.80 kg/m3

0.25% x 405.80 / 1.17 = 1.19 ltr/m3


- x - / - = - ltr/m3
440.00 kg/m3 Menurut RKS
- kg/m3
45.00%
-
55.00%
3.20
-
2.69
2,651.27
1000 - 128.82 - 10.00 - 140.00 = 721.18
721.18 x 45.00% x 3.20 x = 1,038.49 kg/m3

721.18 x 55.00% x 2.69 x = 1,066.98 kg/m3

satuan Dibuat oleh,


kg
kg
ltr
kg
kg ……………………….
kg
ltr
ltr
Menurut RKS

Menurut RKS