AREA DE LA CUENCA 14.

65 KM2
PENDIENTE 0.0456 4.56
PE 16.5 MM
LONGITUD DEL CAUCE 4.54 KM
TC= 0.698 0.698
TP= 1.255 1.255
TR= 2.008 2.008
3.262
T BASE= 3.26238604 2.429

QP= 2.43
GASTO PICO PE= 40.0703284
PUNTO t/tp q/qp t q Q area de la cuenca
a 0.000 0.000 0.000 0.000 0.000 pendiente
b 0.100 0.030 0.130 0.027 0.575
c 0.300 0.190 0.389 0.169 3.640 long de drenaje
d 0.400 0.310 0.518 0.276 5.939
e 0.600 0.660 0.777 0.588 12.643 tc
f 0.700 0.820 0.907 0.731 15.708 tp
g 0.800 0.930 1.036 0.829 17.816 tr
h 0.900 0.990 1.166 0.882 18.965 tb
i 1.000 1.000 1.295 0.891 19.157 gasto pico unitario
j 1.100 0.990 1.425 0.882 18.965
k 1.200 0.930 1.554 0.829 17.816
l 1.300 0.860 1.684 0.766 16.475
m 1.500 0.680 1.943 0.606 13.026
n 1.700 0.460 2.202 0.410 8.812
o 1.900 0.330 2.461 0.294 6.322
p 2.200 0.210 2.849 0.187 4.023
q 2.600 0.110 3.367 0.098 2.107
r 3.200 0.040 4.144 0.036 0.766
s 5.000 0.000 6.475 0.000 0.000
PE= 21.5

a de la cuenca 5.544 km
0.038 3.80%

ng de drenaje 4.41 km 25.000

0.732
20.000
1.295
2.162
15.000
3.457
gasto pico unitario 0.891