Professional Documents
Culture Documents
Mobilisasi
Mobilisasi
2
JENIS PEKERJAAN : MOBILISASI
% TERHADAP TOTAL BIAYA PROYEK : 0.88 %
Lembar 1.2-1
HARGA JUMLAH
No. URAIAN SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)
B. PERALATAN
Periksa lembar 1.2-2 1.00 20,424,700.00 20,424,700.00
3 Bituminous Testing
Marshall Asphalt Test set 372,500.00 -
Extraction Test, Centrifuge/Refflux Method set 372,500.00 -
Specific Gravity for Coarse Aggregate set 372,500.00 -
Specific Gravity for Fine Aggregate set 372,500.00 -
Mix Air Viod Content (Accurate Method) set 372,500.00 -
Core Drill set 372,500.00 -
Metal Thermometer set 372,500.00 -
Accessories and Tolls set 372,500.00 -
Penetration Test set 372,500.00 -
Softening Point set 372,500.00 -
Refusal Density Compactor set 372,500.00 -
4 Concrete Testing
Slump Cone Set - 1,500,000.00 -
Cylinder/Cube Mould for Compressive Strength Set - 1,500,000.00 -
Beam Mould for Flexural Strength (RIGID) - 1,000,000.00 -
Crushing Machine - 1,000,000.00 -
E. MOBILISASI LAINNYA
E.I. PEKERJAAN DARURAT
1 Perkuatan Jembatan Lama LS - - -
2 Pemeliharaan Jalan Kerja di Jembatan Lama ....
3 ...................... ....
E.II. LAIN-LAIN
1 Papan Nama Proyek set 1.00 670,500.00 670,500.00
Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
Lembar 1.2-2
KODE HARGA JUMLAH
No. JENIS ALAT ALAT SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)
B. PERALATAN